HeatStar ER2STG125-N Owner's manual

Category
Space heaters
Type
Owner's manual

This manual is also suitable for

— WHATTODOIFYOUSMELLGAS
• OpenWindows
DO NOTtrytolightanyappliance.
DO NOTuseelectricalswitches.
DO NOTuseanytelephoneinyourhouse.Immediatelycallyourlocalgassupplierfromaneighbor’stelephone.
Followthegassupplier’sinstructions.
Do nottouchanyelectricalswitch;donotuseanyphoneinyourbuilding.
• Installationandservicemustbeperformedbyaqualifiedinstaller,serviceagencyorthegassupplier.
• Ifyoucannotreachyourgassupplier,calltheFireDepartment.
FOR YOUR SAFETY:
Donotstoreorusegasolineorotherflammablevaporsandliquidsinthevicinityofthisoranyotherappliance.
WARNING: Iftheinformationintheseinstructionsarenotfollowedexactly,afireorexplosionmayresultcausing
propertydamage,personalinjuryorlossoflife.
ENERCOGroup,Inc.,4560W.160THST.,CLEVELAND,OHIO44135•866-447-2194
WARNING: Improper installation, adjustment, alteration, service or maintenance can cause
property damage, injury, or death. Read the installation, operating and maintenance instructions
thoroughly before installing or servicing this equipment
OPERATING INSTRUCTIONS
AND OWNER’S MANUAL
READ INSTRUCTIONS CAREFULLY:Readandfollowallinstructions.
Placeinstructionsinasafeplaceforfuturereference.Donotallowanyonewhohas
notreadtheseinstructionstoassemble,light,adjustoroperatetheheater.
Model#
2STG
ER
LANGUAGES INCLUDED
•ENGLISH
•FRENCH
•SPANISH
Heatstar ER2STG
Gas-Fired Low-Intensity Infrared Heaters Approved For
Commercial Applications
ER2STG60-100
ER2STG80-125
ER2STG125-175
GENERAL HAZARD WARNING:
FAILURE TO COMPLY WITH THE PRECAUTIONS AND
INSTRUCTIONS PROVIDED WITH THIS HEATER, CAN
RESULT IN DEATH, SERIOUS BODILY INJURY AND
PROPERTY LOSS OR DAMAGE FROM HAZARDS OF
FIRE, EXPLOSION, BURN, ASPHYXIATION, CARBON
MONOXIDE POISONING, AND/OR ELECTRICAL
SHOCK.
ONLY PERSONS WHO CAN UNDERSTAND AND
FOLLOW THE INSTRUCTIONS SHOULD USE OR
SERVICE THIS HEATER.
IF YOU NEED ASSISTANCE OR HEATER INFORMATION
SUCH AS AN INSTRUCTIONS MANUAL, LABELS, ETC.
CONTACT THE MANUFACTURER.
WARNING:
YOUR SAFETY IS IMPORTANT TO YOU AND TO
OTHERS, SO PLEASE READ THESE INSTRUCTIONS
BEFORE YOU OPERATE THIS HEATER.
WARNING:
FIRE, BURN, INHALATION, AND EXPLOSION
HAZARD. KEEP SOLID COMBUSTIBLES, SUCH AS
BUILDING MATERIALS, PAPER OR CARDBOARD,
A SAFE DISTANCE AWAY FROM THE HEATER AS
RECOMMENDED BY THE INSTRUCTIONS NEVER
USE THE HEATER IN SPACES WHICH DO OR MAY
CONTAIN VOLATILE OR AIRBORNE COMBUSTIBLES,
OR PRODUCTS SUCH AS GASOLINE, SOLVENTS,
PAINT THINNER, DUST PARTICLES OR UNKNOWN
CHEMICALS.
WARNING:
THIS PRODUCT CAN EXPOSE YOU TO CHEMICALS
INCLUDING LEAD AND LEAD COMPOUNDS, WHICH
ARE KNOWN TO THE STATE OF CALIFORNIA TO CAUSE
CANCER AND BIRTH DEFECTS OR OTHER REPRODUCTIVE
HARM. FOR MORE INFORMATION VISIT WWW.
P65WARNINGS.CA.GOV
WARNING: Fuels used in liquefied propane
gas appliances, and the products of combustion of such
fuel, can expose you to chemicals including benzene,
which is known to the state of California to cause cancer
and cause birth defects or other reproductive harm, for
more information go to www.P65Warnings.ca.gov
CONTENTS
Section1INTRODUCTION.........................................................2
Section2PLANNING.................................................................3
Section3INSTALLATION&ASSEMBLY.......................................6
Section4ENGINEERINGSPECIFICATIONS...............................12
Section5VENTING/DUCTING…………………………………………13
Section6GASPIPING..............................................................16
Section7WIRING....................................................................17
Section8OPERATIONMAINTENANCE.....................................18
Section8TROUBLESHOOTING.................................................20
Section9REPLACEMENTPARTS..............................................23
WARRANTYINFORMATION.....................................................24
2
Enerco | Heatstar ER2STG Tube Series Heater Operating Instructions and Owner’s Manual
Checking Shipment
SECTION 1:Introduction
HeatstarER2STGmodelsarelow-cost,fieldassembledinfrared
heatersthatareeasytoinstallandrequireonlyminimal
maintenance.Theyaredesignedtoprovideyearsofeconomical
operationandtrouble-freeservice.
ChecktheshipmentagainsttheBillofLadingforshortages.
Also,checkforexternaldamagetocartons.Noteany
shortages,and/orexternaldamagetocartonsontheBillof
Ladinginthepresenceofthedeliverytrucker.Thedelivery
truckershouldacknowledgeanyshortagesordamageby
initializingthis“noted”BillofLading.Immediatelyreport
anyclaimsfordamagedmaterial,orshortagesthatwerenot
evidentatthetimeofshipment,tothecarrierandyourEnerco
Group,IncFactoryRepresentative.
Installer Responsibility
Allheatersandassociatedgaspipingshouldbeinstalledin
accordancewithapplicablespecificationsandthisinstallation
madeonlybyfirms(orindividuals)wellqualifiedinthistypeof
work.Consultlocalbuildinginspectors,FireMarshalsoryour
localEnercoGroup,IncFactoryRepresentativeforguidance.
HeatstarER2STGheatersareinstalledonthebasisof
informationgiveninalayoutdrawing,whichtogetherwiththe
citedcodesandregulations,comprisethebasicinformation
neededtocompletetheinstallation.Theinstallermustfurnish
allneededmaterialthatisnotfurnishedasstandardequipment,
anditishisresponsibilitytoseethatsuchmaterials,aswell
astheinstallationmethodsheusesresultinajobthatis
workmanlikeandincompliancewithallapplicablecodes.
EnercoGroup,IncFactoryRepresentativeshavehadtraining
andexperienceintheapplicationofthisequipmentandcan
becalledonforsuggestionsaboutinstallationwhichcansave
materialandmoney.
3Operating Instructions and Owner’s ManualEnerco | Heatstar ER2STG Tube Series Heater
SECTION 2: Planning
Thefollowingcodesandinstructionsshouldbefollowedwhen
planningtheinstallationoftheHeatstarER2STGheater.In
additiontotheseinstructions,thewarningsin(Section1)must
becarefullyadheredtosinceimproperinstallationmayleadto
propertydamage,injury,ordeath.
National Standards and Applicable
Codes
Gas Codes:
Thetypeofgasappearingonthenameplatemustbe
thetypeofgasused.Installationmustcomplywithlocal
codesandrecommendationsofthelocalgascompany,
andtheNationalFuelGasCode,ANSIZ223.1–latest
revision,(sameasNFPABulletin54)ortheNaturalGas
andPropaneInstallationCode,CSAB149.1.
• Clearancebetweentheheateranditsventandadjacent
combustiblematerial(whichispartofthebuildingorits
contents)shallbemaintainedtoconformwiththeStan-
dardforInstallationofGasAppliancesandGasPiping,
NFPA-54/ANSIZ223.1–latestrevision,NationalFuel
GasCodeortheNaturalGasandPropaneInstallation
Code,CSAB149.1.
Aircraft Hangers:
Installationinaircrafthangersmustbeinaccordance
withtheStandardforAircraftHangers,ANSI/NFPA-409
– latestrevision.
• Heatersinaircraftstorageorserviceareasshallbein-
stalledataheightof10feetabovetheuppersurfaceof
wingsorengineenclosuresofthehighestaircraftwhich
maybehousedinthehanger.(Thisshouldbemeasured
fromthebottomoftheheatertothewingorengine
enclosure,whicheverishighestfromthefloor.)
• Inothersectionsofaircrafthangers,suchasshopsor
offices,heatersmustnotbeinstalledlessthan8feet
abovethefloor.
• Heatersinstalledinaircrafthangersshallbelocatedso
asnottobesubjecttodamagebyaircraft,cranes,move-
ablescaffoldingorotherobjects.
Public Garages:
Installationsingaragesmustbemadeinaccordance
withtheStandardforParkingStructures,NFPA-88A–
latestrevisionortheStandardforRepairGarages,NFPA-
88B–latestrevision.
• Heatersmustnotbeinstalledlessthan8feetabove
thefloor.Minimumclearancestocombustiblesmustbe
maintainedfromvehiclesparkedbelowtheheater.
• Wheninstalledoverhoists,minimumclearancestocom-
bustiblesmustbemaintainedfromtheuppermostpoint
onthehoist.
Venting:
Theventingmustbeinstalledinaccordancetothelatest
revisionofANSIZ223.1orCSA149.1.Partialinformation
withregardtothiscodeisprovidedin(Section5)ofthis
installationmanualwithregardtosizeandconfigura-
tionsforventingarrangements.
• Anyportionoffluepipepassingthroughacombus-
tiblewallmustbedualinsulatedorhaveanapproved
thimble.RefertotothelatestrevisionofANSIZ223.1or
CSA149.1
Hazardous Locations:
Wherethereisthepossibilityofexposuretocombustible
airbornematerialorvapor,consultthelocalFireMarshal,
thefireinsurancecarrierorotherauthoritiesforapproval
oftheproposedinstallation.
Critical Considerations
HeatstarER2STGisasuspendedheater.Therefore,its
stability,flexibility,andsafetyareveryimportant.Before
startinginstallation,besurethesystemcanmeetthe
followingrequirements.
• Maintainspecifiedclearancestocombustibles,andsafe
distancefromtheheat-sensitivematerial,equipmentand
workstations.
• Thestatedclearancestocombustiblesrepresentasur-
facetemperatureof90°F(30°C)aboveroom
temperature.Buildingmaterialswithlowheattolerance(
suchasplastic,vinylsiding,canvas,etc.)maybesubject
todegradationatlowertemperatures.Itistheinstall-
ersresponsibilitytoassurethatadjacentmaterialsare
protectedfromdegradation.
Provideasuspensionwithverticallengthofchainor
swingingrodwhichhasatleast2inchesofhorizontal
travelforeachburnerinastraightrun.Besurethesus-
pensionsystemissufficientlyflexibletoaccommodate
thermalexpansionwhichoccursasthesystemheatsup
(seeFigure6onpage11).
• Provideaccesstoburnersforservicing,preferableon
bothsides,aboveandbehindtheburnerforremoval.
• Provideaminimumof18inchesofclearancebetween
burnersandbuildingwalls.(Alwaysobserveminimum
clearancestocombustibles.)
• Besuretheheaterhasadownwardpitchofone-half
inchper20feetawayfromtheburner.
• Providesignsinstorageareastospecifymaximumstack-
ingheighttomaintainrequiredclearancestocombus-
tibles.
Planlocationsupports(seeFigure2A-Donpage8).
Locateasupportnearallelbows.
• Theinstallationmustconformwithlocalbuildingcodes
orintheabsenceoflocalcodes,withtheNationalFuel
GasCode,ANSIZ223.1/NFPA54ortheNaturalGas
andPropaneInstallationCode,CSAB149.1.
• Ifanexternalelectricalsourceisutilized,theheater,
wheninstalled,mustbeelectricallygroundedinaccor-
dancewiththeNationalElecticalCode,ANSI/NFPA70
orcurrentCanadianElectricalCode,CSAC22.1.
Available Venting Kits
F102848 Category I 4" Vertical Vent Kit
F102849 Category I 6" Vertical Vent Kit
F102860 Category III 4" Stainless Steel Horizontal Vent Kit
4
TABLE 1:MinimumClearancestoCombustibles(UseFigure1onpage5asaGuide)
Reflector Type Position ER2STG-100 ER2STG-125 ER2STG-175
Standard
Reflector
(Horizontal)
A
B
C
D
6”
36
74
36
6”
36
87
36
8”
36
87
36
45°ReflectorTilt
A
B
C
E
F
18
36
74
36
60”
18
36
87
36
60”
18
36
87
36
60”
U-TubeStandard
(Horizontal)
A
B
C
D
6”
36
74
36
6”
36
87
36
8”
36
87
36
U-TubeOpposite
45°
A
B
C
F
18
36
74
60”
18
36
87
60”
18
36
87
60”
U-TubeFull4
A
B
C
E
F
18
36
74
36
60”
18
36
87
36
60”
18
36
87
36
60”
Unvented AboveA 36” 36” 36
WARNING:
FIRE OR EXPLOSION HAZARD
CAN CAUSE PROPERTY DAMAGE, SEVERE INJURY OR DEATH.
Inallsituations,clearancestocombustiblesmustbemaintained.Failuretoobserveclearancestocombustiblesmayresultinproperty
damage,severeinjury,ordeath.
Minimumclearancesmustbemaintainedfromvehiclesparkedbelowtheheater.Signsshouldbepostedinstorageareastospecify
maximumstackingheighttomaintainrequiredclearancestocombustibles.
Cautionshouldbeusedwhenrunningthesystemnearcombustiblematerialssuchaswood,paper,rubber,etc.Considerationshouldbe
giventopartitions,storageracks,hoists,buildingconstruction,etc.
TABLE1givesminimumacceptableclearancestocombustibles.ClearancesasshowninTABLE1arenotforuseinfour-sidedenclosures.
Clearances To Combustibles
5Operating Instructions and Owner’s ManualEnerco | Heatstar ER2STG Tube Series Heater
D
A
C
STANDARD REFLECTOR
A
E
C
E
45 DEGREE REFLECTOR TILT
C
A
EF
U-TUBE OPPOSITE 45 DEGREE
A
CD
U-TUBE STANDARD
C
E
A
E
U-TUBE FULL 45
BE
FRONT AND BACK CLEARANCE
Clearances To Combustibles
Figure 1: ClearancesToCombustibles(RefertoTABLE1onpage4)
A
C
EF
STANDARD REFLECTOR
D
A
C
A
C
D
“U”-Tube,Standard
A
C
D
F
“U”-Tube,Opposite45°
F
C C
AA
E
A
F
“U”-Tube,Full45°
C
AC
B
B
FrontandBackClearance
6
SECTION 3: Installation & Assembly
TUBECOUPLING(14612)
KEYFORTUBECOUPLING
(14616)
TUBEHANGER
(14585P)
HEATEXCHANGERTUBE10'
(06413)
TURBULATORBAFFLE5'(03447)
**NOTINCLUDEDWITHALLMODELS**
REFLECTOR10'
(00418A)
VENTADAPTER
(19021)
BURNERBOX
7Operating Instructions and Owner’s ManualEnerco | Heatstar ER2STG Tube Series Heater
Vent Adapter
Usedtoattachtheheat
exchangertubingtoventpipe.
Installation Procedure
Takemaximumadvantageofthebuildingupper
structure,beams,joists,purlins,etc.,fromwhichto
suspendtheheater.Thereisnouniquesequencefor
installationofthetubing.On-siteobservationwill
usuallyrevealalogicalsequence.Begintheinstallation
atthemostcriticaldimension.Thiscouldsavetime.
Watchforswingingdoors,overheadcranes,carlifts
etc.Reflectorsandtubingcanbeinstalledasyoumove
along.Carefullyadjustsystempitchateachposition
toleveltheheater.Pitchdownone-halfinchin20feet
(awayfromburner).
DON’TPressuretestthegaslineusinghighpressure(greater
than½PSIG)withoutclosingthehigh-pressureshutoff
cocks.Failuretodosowillresultindamagetothe
burners.
Burner Housing
Mustalwaysbe
installedhorizontally.
Tube and Reflector Hanger
Installimmediatelyafterfirst
coupling.
Turbulator
The60-100kER2STGutilizesa5'turbulatorwhen
operatingwitha30'tubeset
Theturbulatorislocatedattheendofthe3rdtube
Tube and Reflector Hanger
Suspendsystemfromthesehangers.
Minimumtwo(2)requiredpertube.
Reflectors
Alternateoverlapasshown
onoverview.Lengthof
reflectorandamountof
overlapisindicated.
10'2=1/2" ALUMINIZED
Heat Exchange Tubes
Suppliedin10ft.lengths.
Tube Coupling Assembly
Couplingshouldbeorientedwith
slidebarontop,andallcouplings
should“point”inthesamedirection.
AssembletheheatercomponentsasshowninFigures2a,2b,2c,2d,Optionalreflectorconfigurationsareshownin(Figure1).Install
appropriatedsuspensionhardware,beamclamps,chainorrodatpredeterminedlocations.Adjustmentofchainlengthwillprovideuniformpitch.
DO Familiarizeyourselfwithlocalandnational
codes.
Developaplannedprocedurewhichwillconservematerial
andlaboronthejob.
Checktoseethatallmaterialandequipmentisonthejob
beforestartinginstallation.
Allowforthermalexpansionofthehottube.
Installthegasconnectoronlyasshownininstructions(see
Figure14onpage16).
Haveslipjointswhererequiredbetweenreflectorstokeep
themfrombucklingorcomingapart.
Provide1sq.inchoffreeairopeningtoeach1,000BTU/hr.
ofheaterinput(butnotlessthan100sq.inches)inenclosed
spaces.Oneopeningshouldbewithin12inchesofthetop
andonewithin12inchesofthebottomoftheenclosure.
FIGURE 2: Heatstar ER2STG Overview
8
FIGURE 2A: Heatstar Model ER2STG 60-100 Assembly Overview
30 ft. Exchanger length. 31 ft. - 4 in. Total Heater length. 6 Suspension points as indicated.
FIGURE 2B: Heatstar Model ER2STG 80-125 or ER2STG 60-100
40 ft. Exchanger length. 41 ft. - 4 in. Total Heater length. 8 Suspension points as indicated.
FIGURE 2C: Heatstar Model ER2STG 80-125 or ER2STG 125-175
50 ft. Exchanger length. 51 ft. - 4 in. Total Heater length. 10 Suspension points as indicated.
FIGURE 2D: Heatstar Model ER2STG 125-175
60 ft. Exchanger length. 61 ft. - 4 in. Total Heater length. 12 Suspension points as indicated.
ALUMINIZED ALUMINIZED ALUMINIZED ALUMINIZED
18”
Typ.
18” 18” 18”
10’ 2-1/2” 10’ 2-1/2” 10’ 2-1/2” 10’ 2-1/2”
10’ 2-1/2” 10’ 2-1/2” 10’ 2-1/2”
10’ 2-1/2”
10’ 2-1/2”
18”
Typ.
ALUMINIZED ALUMINIZED ALUMINIZED ALUMINIZED ALUMINIZED
18” 18” 18” 18” 18” 18” 18” 18” 18”
10’ 2-1/2” 10’ 2-1/2” 10’ 2-1/2”
10’ 2-1/2” 10’ 2-1/2” 10’ 2-1/2”
18”
Typ.
ALUMINIZED ALUMINIZED ALUMINIZED ALUMINIZED ALUMINIZEDALUMINIZED
18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18”
(1) TURBULATOR SECTION (5')
9Operating Instructions and Owner’s ManualEnerco | Heatstar ER2STG Tube Series Heater
FIGURE 3: Heatstar ER2STG Dimensions & Suggested Mounting Heights
Turbulator
HeatExchanger Tubing
Turbulator
HeatExchanger Tubing
MinimumTotalLength(seechartbelow)
Burner Side View
Burner Ratings and Heat Exchanger Lengths: (NG and LP) Suggested Mounting Heights
Model # Rate (BTU/Hr.)
Low-High
Heat Exchanger
Length Turbulator Minimum
Total Length
Typical
Mounting
Height
ER2STG
60-100
60-100,000 30ft. 5ft. 31'4"12’-15’
60-100,000 40ft. None 41'4"12"-15'
ER2STG
80-125
80-125,000 40ft. None 41'4"14’-19'
80-125,000 50ft. None 51'4"14’-19'
ER2STG
125-175
125-175,000 50ft. None 51'4"15’-25'
125-175,000 60ft. None 61'4"15’-25'
Burner Rear View
9.25"
(23.49cm)
9.25"(23.49cm)
17.75"(45.08)
(IFNECESSARY)
10
Couplings: Tubeandtubefittingsareconnectedbywrap-
aroundcouplingswhichclampbymeansof
atapered,hammer-drivenlockmember.The
startingendsofthecouplingandlockmember
areidentifiedby1/4”holeswhichareput
togetherwhenstartingassembly.Besurethe
tubeendsareinlineandtubeendsbuttagainst
stoppin(s)insidecoupling.Theslidebaristobe
hammer-driventoapointofsecuringthecoupling
snuglytothetubes.Over-drivingwillresultin
distortionofthecouplingorslidebarliptoa
pointdecreasingtheholdingthecapabilityofthe
coupling.(SeeFigure4)
90°Elbow
ElbowFittingDimensions
FIGURE 5: Installation of Elbow & Coupling
ElbowPackage: Stk.#F106415ElbowPackageincludes:
(1)elbow,(1)couplingand(1)refelctor.
Installelbowintoradianttubesequence
whereplansindicatea90°bend
U-TubeFittingDimensions 180°U-Tube
Stk.#i ncludes:
F106414U-TubePackage
(1)U -tube,(1)couplingand(2)
radianttubesequencewhereplans
indicatea180°bend
COUPLING ASSEMBLY
Coupling (Less Key) - 14612
Key for Coupling - 14616
Tighten
Loosen
Hole 1
Coupling
Assembly
Impact
Block
Hole 2
Whenassemblingcouplingnote
thelocationofHole1andHole2
Orientcouplingsothat
theimpactblockisabove
tubecenterline.
TUBECOUPLING
KEYforCOUPLING
FIGURE 4:
(38.73 CM)
(15.24 CM)
18" (45cm)
10"
(25cm)
(10cm)
(43cm)
9" (22cm) Radius
11 Operating Instructions and Owner’s ManualEnerco | Heatstar ER2STG Tube Series Heater
Chainkit-Stk.#17370
Onechainkitwillsuspendone10ft.sectionoftubeandone10ft.
sectionofreflector.
FIGURE 7A: Tube and Reflector Hanger
FIGURE 7B: Mounting Flange / Tube Detail
1) Inserttube06413intofrontcastingtopoint(A).
2) Tightensetscrewsmarked(B)untilsnug.
3) Afterall(3)setscrewsaresnug,turneach
additional1/4turntosecuretubeinplace.
FIGURE 8: Burner Box / Transition Tube Detail
FIGURE 6: Typical Suspension Details
Locknut
Washer
WoodBeam
Washer
ScrewHook
min.3/8"(10mm)
I-Beam
Beam
Clamp
AsReq'd
S-Hook
BarJoist
Clip
Truss
Concrete
Beam
Anchor
MountingFlange
CapScrew
Stk.98012
SplitLockWasher
Stk.#98527
Gasket
Stk.#12397
Burner Box
(flameobservation
windowfacingdown)
horizontal reflector position (standard)
angle mounting ring
radiant tube
horizontal mounting ring
hanger
reflector
top
side 4reflector position (optional)
below
A
B
FIGURE 9: Reflector End Cap
Partslist
100419ReflectorEndCap(Qty1)
209369SpringClip(Qty4)
FlangeKit#06428XL
KitIncludes:Flange,Screws(4),LockWashers(4),Gasket(1)
B
12
SECTION 4
Engineering Specifications
ThetotalheatingsystemsuppliedshallbedesigncertifiedbyCSA
underthelatestrevisionofANSIZ83.20andCSA2.34.
A. Burner & Burner Controls
1. Burnersshallbecapableoffiringwithoneofthefueloptionsas
specifiedonthepurchasedocuments:NaturalGasorLP.
2. Burnersshallbesuppliedtofireatanyoneoftheinputratesas
specified.
ER2STG60-100 60,000-100,000BTU/Hr.
ER2STG80-125 80,000-125,000BTU/Hr.
ER2STG125-175 125,000-175,000BTU/Hr.
3. Burnershallbeequippedwithadirectsensesilicon-carbidehot
surfaceignitioncontrolsystemwith100%shut-offignitiondevice.
Powersuppliedtoeachheatershallbe120V,60Hz,singlephase.
Burnersshallberatedfor1.0Amp(run)and5.0Amp(start.)
4. Burnershallbeequippedwiththermaloverloadmotorprotec-
tion,balancedairrotor,combustionairprovingsafetypressure
switch,andviewingwindowforflameobservation.
5. Whenspecified,incontaminatedenvironments,theburnershall
becapableofsupplyingoutsideairtoeachburnerforthesup-
portofcombustion.
6. Allburnersshallbepre-wiredwithagroundedelectrical
cordandplug.
7. Lowvoltage2-stagethermostatrequiredforcorrect2-stage
burneroperation.
B. Heat Exchanger
1. Radianttubingshallbe4”diameteraluminizedsteelsuppliedin
10ft.sections.Sectionsshallbejoinedwithstainlesssteelwrap-
aroundcouplings.
2. Reflectortobeofaluminummaterialanddesignedtodirectall
radiantoutputbelowhorizontalcenterlineofradianttube.
3. Heatersshallbeventedaccordingtomanufacturer’s
recommendations.
Gas INLET pressure:
Natural Gas: 4.6” W.C. Min
11.0” W.C. Max
LP Gas: 11.0” W.C. Min
14.0” W.C. Max
1/2”NPTGasConnectorSize
Electrical Rating:(AllModels)
120V-60Hz
1.0AMP(Run)5.0AMP(Start)
Dimensions:
Flue Connection Size…………………4”
Outside Air Connection Size………4”
MANIFOLD PRESSURE
ER2STG 60-100
LOW FIRE
( MIN. RATE)
HIGH FIRE
(MAX RATE)
NATURALGAS-INCHESW.C. 1.3" 3.5"
PROPANE-INCHESW.C. 3.5" 10.5"
MANIFOLD PRESSURE
ER2STG 80-125
LOW FIRE
( MIN. RATE)
HIGH FIRE
(MAX RATE)
NATURALGAS-INCHESW.C. 1.7" 3.5"
PROPANE-INCHESW.C. 4.2" 10.5"
MANIFOLD PRESSURE
ER2STG 125-175
LOW FIRE
( MIN. RATE)
HIGH FIRE
(MAX RATE)
NATURALGAS-INCHESW.C. 2.2" 3.5"
PROPANE-INCHESW.C. 5.8" 10.5"
Gas pressure at MANIFOLD:
1/2”NPTGasConnectorSize
13 Operating Instructions and Owner’s ManualEnerco | Heatstar ER2STG Tube Series Heater
SECTION 5
Venting / Ducting
General Requirements
Thisheatermustbeventedinaccordancewiththespecifications
containedinthismanualandwiththefollowingnationalcodes
andanystate,provincialorlocalcodeswhichmayapply:
• RefertoNationalFuelGasCodeNFPA54/ANSIZ223.1-latest
revision.
• CANADA:RefertoNaturalGasandPropaneInstallationCode
CSAB149.1-latestrevision.
Theheatermaybeventedtotheoutdoorseitherverticallyor
horizontally.
Optionaloutsideairsupplymaybedirectedtotheheater
horizontallyorvertically.
Besurethatthemethodselectedforventingheatercomplies
withallcodesasrequiredforeachparticularlocation
Theuseofsingle-wallventpipe(26gauge)isrecommended.A
sectionofdouble-wallventpipeisrecommendedwhenpassing
throughtherooforwall.
Exhaustendofheaterwillaccepta4'(10cm)ventpipeusing
theventadapter.Installtheventadapterwiththeseamontop,
secureallventjointswithaminimumof3#8x3/8"sheetmetal
screwsandsealalljointsusingahightemperaturesilicone
sealant.
Ifcondensationintheflueisaproblem,thefluelengthshould
beshortenedorinsulated.
Ventpipemustbeslopeddownwardawayfromtheburner
1/4"(.6cm)forever10'(3m).
VENTLENGTHS:
• Maximumtotalventlengthallowedinthirty(30’)feet.
• Maximumoutsideairsupplyductallowedthirty(30’)feet.
• Maximumtotalventlengthplusoutsideairsupplylength
shallnotexceedfifty(50’)feet.
NOTE:
Atotaloftwo(2)elbowsareallowedforventand
outsideairsupplycombination.Subtract5'feetperadditional
elbowfrommaximumlengthallowedif3ormoreelbowsare
used.
Installaminimum18"(30cm)straightlengthofductforair
intakeorventbeforeanyTeeorelbow.
Alternative Arrangements / Optional Equipment for Venting
Unvented Operation
a) Sufficientventilationmustbeprovidedintheamountof4
CFMper1,000BTU/hr.firingrate.
b) RefertoANSIZ223.1-latestrevision,NFPA-54andlocal
codesforadditionalinformation.
c) Useofoptionaloutsidecombustionairisnotrecommended
withunventedheatersduetopressureconsiderations.Refer
topage16
a) Four(4”)inchO.D.fluepipeisrequired.Thirty(30’)feet
maximumlengthisrecommended.
b) Allfluejointsshouldbesealedusingsuitableproductsuch
asGeneralElectricRTV106orPermatexForm-A-GasketRed
HighTemperatureSiliconeAdhesiveSealant.
c) Donotinstallanyelbowor45fittingtobringventlower
thanthehorizontaltubesystem.
d) Ventterminalshouldbeinstalledataheightsufficientto
preventblockagebysnow.
1) Ventmustexitbuildingnotlessthanseven(7’)feet
abovegradewhenlocatedadjacenttopublicwalkways.
2) Ventmustterminateatleastthree(3’)feetaboveany
forcedairinletlocatedwithintenfeet(10’).
3) Ventmustterminateatleastfour(4’)feetbelow,four
(4’)feethorizontallyfrom,orone(1’)footaboveany
door,window,orgravityinletintoanybuilding.
4) Ventterminalshallbelocatedatleasttwelve(12”)inches
fromanyopeningthroughwhichventgasescouldenter
thebuilding.
5) Ventterminalmustbebeyondanycombustibleover
hang
Vertical Venting
a) Four(4”)inchO.D.fluepipe,maximumthirty(30’)feet
inlengthmaybeusedasshownwithapprovedventcap.
(SeeGeneralRequirementsonthispageforadditional
information.)
b) Aninsulatedthimblemayberequiredtopassthrough
combustiblestructures(checklocalcodes).
c) Allfluejointsshouldbesealedusingsuitableproducts(see
recommendationforhorizontalventing.)
Common Venting
a) Horizontalruntoventmustneverexceed75%ofthevertical
heightofthevent.RefertoANSIZ223.1-latestrevision,
NFA-54forproperventsizesandinstallation.
b) Openareaofcommonventmustequalthesumoftheopen
areaofindividualventsconnectedtoit.(Seechartbelow
anddiagrams-page14.)
c) Usedoublewallventasrequired(checkcodes.)
d) Alljointsmustbesealedusingsuitableproducts.
e) Connectionstocommonstackmustbepositionedtoavoid
directoppositionbetweenstreamsofcombustiongases.
COMMON VENTING - (2) Heaters (Horizontal and Vertical)
Model# H=6ft. H=8ft. H=15ft.
ER2STG60-100 D=8" D=8" D=7"
ER2STG80-125 D=10" D=10" D=8"
ER2STG125-175 D=10" D=10" D=8"
Horizontal Venting
This heater, when horizontally vented, must be installed with the
approved venting system. For horizontal venting installations these
tube heater are certified as a category III appliance.
This heater, when vertically vented, must be installed with the
approved venting system. For vertical vent installations, ER2STG
60-100 model and ER2STG 80-125 model are category I
appliances. The ER2STG 125-175 model is only Category I when
vented vertically with 6" (15.25cm) diameter vent pipe.
14
FIGURE 12: Common Roof Venting
Type"B"Ventrequiredoutdoors.
VentAdapterStk.#19021
OutsideWall
Securealljointswith3(minimum)#8x3/8"
sheetmetalscrewsandsealalljoints.
H
VentCap
WallThimble
(IfApplicable)
BurnerBox
BurnerBox
HORIZONTAL COMMON VENTING
VERTICAL COMMON VENTING
SIDE VIEW
TOP VIEW
Type "B" Vent required outdoors.
Vent Adapter Stk. #19021
At least 1/4" per foot rise or pitch
must be maintained on horizontal
runs from heater to vent.
Roof
Secure all joints with 3 (minimum) #8 x 3/8"
sheet metal screws and seal all joints.
H
Approved Vent Cap
Type "B" Vent required outdoors.
Vent Adapter Stk. #19021
Outside Wall
H
Vent Cap
Flashing
Wall Thimble
(If Applicable)
Burner Box Burner Box
Burner Box
Burner Box
Burner Box
Burner Box
D
Burner Box Burner Box
D
4” Aluminized steel Heat Exchange Tube
4” Aluminized steel Heat Exchange Tube
D
15 Operating Instructions and Owner’s ManualEnerco | Heatstar ER2STG Tube Series Heater
FIGURE 10: Unvented Operation
36”
36”
A
1. Ventilationequalto4CFMper1,000BTU/HRfiringratemust
beprovidedinunventedheaterinstallations
2. FordimensionsA"unvented"referto(Figure1-Minimum
ClearancestoCombustibles.)
3. Thisheaterrequiresventilationinthebuildingtodilutethe
productsofcombustionandprovidefreshairforefficient
combustion.
FIGURE 10b: Double Wall
Doublewallventrun
Doublewallterminalend
FIGURE 11: Vertical Venting
18"(45cm)
18" (45cm) Min. 3'-0" (91cm) Min.
8"(20cm) to 10"(25cm) Max.
6' (182cm) Min.
FIGURE 10A: Single Wall
Singlewallventrun
Singlewallterminalend
18" (45cm) Min. 3'-0" (91cm) Min.
6' (182cm) Min.
2"(5cm) Clearance thimble
2"(5cm) Clearance thimble
required when u pipe
extends through
combustible materials
(91cm)
(91cm)
VentAdapter
16
Outside Combustion Air Supply
TheHeatstarER2STGheaterisapprovedforinstallationwith
anoutsideairsupplysystem.Somecompoundssuchas
halogenatedhydrocarbonsorothercorrosivechemicalsinthe
aircanbedrawnintotheequipmentandcauseanaccelerated
rateofcorrosionofsomeoftheheatercomponents.Theuse
ofsuchchemicalcompoundsneartheenclosureshouldbe
avoided.
IMPORTANT: If the building has a slight negative
pressure or contaminants are present in the air, an
outside combustion air supply to the heaters is strongly
recommended.
Foranoutsideairsupply,afour(4”)inchO.D.singlewallpipe
maybeattachedtotheheater.Theductmaybeuptothirty
(30’)ft.maximumlengthortwo(2’)ft.minimumlengthwith
nomorethantwo(2)elbows.(SeeGeneralRequirementson
page15foradditionalinformation.)
Theairsupplyductmayhavetobeinsulatedtoprevent
condensationontheoutersurface.Theoutsideairterminal
shouldbesecurelyfastenedtotheoutsidewallbydrillingfour
(4)1/4”diameterholesintheoutsideflange;woodscrewsor
boltsandexpansionsleevesmaybeusedtofastenterminal.
PVCPipe,“DryerHose”,orequivalentmaybeusedinsteadof
standardventpipe.
FIGURE 13: Non-Pressurized Outside Air Supply Duct
SECTION 6
Gas Piping
Readapplicablewarningsin(Section1)beforeproceedingwith
GasPipeinstallation.Improperinstallationmayresultinproperty
damage,severeinjury,ordeath.
Meterandservicemustbelargeenoughtohandlealltheburners
beinginstalledplusanyotherconnectedload.Thegaslinewhich
feedthesystemmustbelargeenoughtosupplytherequiredgas
withamaximumpressuredropof1/2”watercolumn.Whengas
pipingisnotincludedinthelayoutdrawing,thelocalgassupplier
willusuallyhelpinplanningthegaspiping.
A1/2”tappingateachburnerlocationmustbelocatedandoriented
asshownin(Figure14).Tochecksystempressure,putaplugged
1/8”NPTtappinginthegaslineattheconnectiontotheburner
farthestfromthesupply.Beforeconnectingtheburnerstothe
supplysystem,verifythatallhighpressuretestingofthegaspiping
hasbeencompleted.Donothighpressuretestthegaspipingwith
theburnersconnected.
Followtheseinstructionstoensureaprofessionalgassupply
installation:
• Supportallgaspipingwithsuitablepipehanging
materials.
• Usewroughtironorwroughtsteelpipeandmalleable
ironfitting.Allpipefittingsshouldbenewandfree
fromdefects.Carefullyreamthepipeandtubingends
toremoveobstructionsandburrs.
• UseL.P.gas-resistantjointcompoundonallpipe
threads.
• Checkthepipeandtubingendsforleaksbefore
placingheatingequipmentintoservice.When
checkingforgasleaks,usesoapandwatersolution:
NEVER USE AN OPEN FLAME.
Installtheflexgasconnectorasshown.Theflexgasconnector
accommodatesexpansionoftheheatingsystemandallowsforeasy
installationandserviceoftheburner.
FIGURE 14: Gas Line Connection with Stainless Steel Flex Gas
Connector
Shut-OffValvemustbeparallel
toburnergasinlet.The2”
displacementshownisforthecold
condition.Thisdisplacementmay
reducewhenthesystemisfired.
Shut–offValve
12 "
2"
1/2"StainlessSteelFlexGasConnector
Stk.#16401
90°
45°
45°
4" (10 cm)
Seal All Joints
Heater Movement
Heater Movement
Heater Movement
Heater Movement
Outside Air
Terminal
Flex Pipe
6" (15 cm) to
12" (30 cm) Long
Flex Pipe
6" (15 cm) to
12" (30 cm) Long
Flex Pipe
6" (15 cm) to
12" (30 cm) Long
Outside Air
Terminal
NOTE:
Flue pipe requires additional
support. Flex pipe will not
support riser and outside
air terminal
Vertical Outside Air
Horizontal Outside Air
FIGURE 14A: Incorrect Gas Line Connection with Stainless
Steel Flex Gas Connector
17 Operating Instructions and Owner’s ManualEnerco | Heatstar ER2STG Tube Series Heater
THERMOSTAT CONNECTION
24V
W1
W2
LOW HEAT
HIGH HEAT
R
W1
W2
TUBE BURNER CONNECTIONS INTERNAL THERMOSTAT WIRING
SECTION 7
Wiring
Heatersarenormallycontrolledbythermostats.Heatersmustbe
electricallygroundedinaccordancewiththeNationalElectrical
Code,ANSI/NFPA70orcurrentCanadianElectricalCode,CSA
C22.1.
• Ifanyoftheoriginalwireassuppliedwiththeappliancemust
bereplaced,itmustbereplacedwithwiringmaterialhavinga
temperatureratingofatleast105°Candratedfor600V
• Eachburnermustbeelectricallygroundedinaccordancewith
theNationalElectriccodeANSI/NFPA-70-latestversion NOTE:
• Connectingthetoptwoterminalsofthebushing
locatedatthebottomleftofthebackofthe
burnerboxwillgiveyoulowfire
• Connectallthreeoftheterminalsforhighheat
L1
N
Earth Ground
GV
M
T1
PCB1
S1/240
S1/120
N
L1
S2/FS
PSW
W
MV1
GRND
blk
wh
blk
grn
Pressure Switch
24 V
SW1
C1
blk
wh
grn
Primary
Secondary
FC+ FC-
LED
R
F2/IND
F1/120
red
To Thermostat
24V
W1 W2
grn
red
wh
grn
brn
wh
red
red
Flame Sense
Burner
HSI
wh
wh
blk
wh
wh
yellow
SW1 - Panel Interlock Switch
C1 - 1.5 ufd @ 450 volts
Wire is AWG18 Stranded @ 600 volts - 105 degrees C
Crimp Caps are # CE5 - 105 degrees C
(Neutral Connection Not Needed in this Configuration)
blue
24 VAC
blk
grn
WIRING DIAGRAM
BURNER BOX CONNECTION INTERNAL THERMOSTAT WIRING
FIGURE 18A
FIGURE 18B
18
Sequence of Operation
1. Turnthethermostatup.Whenthethermostatcallsforheat,
blowermotorwillenergize.
2. WhenthemotorapproachesnominalrunningRPM,theair
provingswitchclosesandactivatestheignitionmodule.
3. Theignitionmodulethenenergizesthehotsurfaceigniterfor
atimedwarm-upperiod(approximately45to60seconds.)
4. Afterthewarm-upperiod,thegasvalveisenergized.
5. Ifaflameisdetected,thegasvalveremainsopen.Whenthe
callforheatissatisfied,andthesystemcontrolmechanism
de-energizestheburnerlinevoltagesupply,thegasvalves
areturnedoff.
6. Ifnoflameisdetectedonathree-trialmodule,thegas
valveisclosed,andapurgeperiodbegins.Afterthepurge,
themoduleactstopowertheigniterforasecondwarm-
upperiod,andasecondtrialforignitionperiod.Ifflameis
stillnotestablished,athirdandfinalpurge,warm-up,and
trialcyclebegins.Afterthreetrials,themodulewilllockout
untilreset.Resetisaccomplishedbyremovingpowerfrom
themoduleforatleastfive(5)seconds(thermostatcycle
required.)
7. Ifflameisestablishedandlostonthefirstorsecondtrial,
thegasvalveisturnedoff,apurge,warm-up,andtrialfor
ignitionwilloccuronathree-trialmodule,onlythreetrialsfor
ignitionareallowedperthermostatcycle.
Maintenance
Forbestperformance,thefollowingmaintenanceproceduresshould
beperformedbeforeeachheatingseason:
1. Besuregasandelectricalsupplytoheaterareoffbefore
performinganyserviceormaintenance.
2. Checkconditionofblowerscrollandmotor.Dirtanddustmaybe
blownoutwithcompressedair,oravacuumcleanermaybeused.
Whenusingcompressedair,donotexceed30psiinordertonot
damagefragilehotsurfaceigniter.
3. Checkconditionofburner.Carefullyremoveanydustor
debrisfrominsidetheburnerboxorburnercup.
4. Inspecttheigniter.Replaceigniterifthereisexcessivecarbon
residue,erosion,breakageorotherdefects.
5. Checktheinsideofthefiringtubewithaflashlight.Ifcarbon
orscalearepresent,scrapeoutthedepositswithawire
brushorrod,ormetalplateattachedtoawoodenpole.
6. Checktoseethattheburnerobservationwindowisclean
andfreeofcracksorholes.Cleanorreplaceasnecessary.
7. Checkthefluepipefordirt.Aftercleaningasnecessary,re-
attachthefluepipetotheheater.
8. Outsidesurfacesofheatermaybecleanedbywipingwitha
dampcloth.
9. Aqualifiedserviceagencyshouldbecontactedforservice
otherthanroutinemaintenance.
10. Checkventterminalandfreshairinlettoseethattheyhave
notbeenblockedduringthenon-heatingseason.Ifeither
pipeisrestricted,theairswitchwon’tclose,resultingina
no-heatsituation.
SECTION 8
Basic Operation of 2-Stage Tube Heater
UnitfiresatratesdesignatedasLowandHigh
• Firerateisdeterminedbythermostat
InitialStart:
Ifthermostatismorethan2degreesabovetheroom/
spacetemperature,theheaterwillstartandgointohighfire
range.Theunitwillstayinthehighrangeuntilthespaceair
temperaturereachesthethermostatset-point.Theheaterwill
shutoff.
Astheroom/spaceairtemperaturedecreasesbelowthe
thermostatsetpoint(approximately1degree)theheaterwill
comeonandfireuntilthethermostatsetpointisreached.
Iftheroom/spaceairtemperatureexperiencesarapid
decreaseinairtemperature(below3degreesfromsetpoint)
theheaterwillcomeonandfireatthehighrateuntiltheset
pointisreached.
LADDER DIAGRAM
L
N
24V
M
C1
Panel Interlock
F2/IND
F1/120
(Control PCB)
HSI
L1 S1/120
(Control PCB)
PCB
L1
PCB
S2/FSL1
Burner
Flame Sense
T1
115V
PCB
R
PCB
PSW
Pressure Switch
W1
W2
T'Stat
W
MV1
(Control PCB)
Gas
Valve
Earth &
Chassis Ground
FIGURE 18C
Operation & Maintenance
HIGH ALTITUDE
Heaters may be fired at full input up to 2000 ft. (610m) above sea level. Above 2000 ft. (610m) a high altitude conversion kit may be required
to ensure proper burner performance, please consult the manufacturer. Be prepared to answer factory questions regarding: type of fuel for the
proposed appliance conversion, gas pressure available at site, and specific altitude at site. The conversion shall be carried out by a
manufacturer’s authorized representative, in accordance with the requirements of the manufacturer, provincial, or territorial authorities having
jurisdiction and in accordance with the requirements of the CSA B149.1 or CSA149.2 installation codes.
19 Operating Instructions and Owner’s ManualEnerco | Heatstar ER2STG Tube Series Heater
Burner Does Not 1.Checkgroundwirecontinuity.
Stay Lit: 2.Checkburnerinternalwiringforreversed
leads.
3. Checkinsulationontheigniterleads.
4. Cleanorreplaceflamesensor.
5. Replacemoduleifnecessary.
IGNITION MODULE LED Status
TheHeatstarER2STGseriesTubeHeaterisequippedwithaIgnition
module.Thisignitionmodulehasabuilt-indiagnosticprogram,
whichwillassistintroubleshootingintheeventofavalve-related
problem.TheLEDor(LightEmittingDiode)islocatedontheignition
moduleasshownindiagrambelow.TheLEDstatusindicationsare
listedbelowtohelpwiththetroubleshooting.
FIGURE 19:
Off Nopowertothecontrol
ON ControlFault
1-Flashes AirflowFault
2--Flashes FlameSenseFault
3-Flashes IgnitionLockout.
Troubleshooting
CAUTION:BeforeopeningtheHeatstar
ER2STGburnerdoorforanytypeofservice,be
surethegassupplyhasbeenshutoffatthe
heaterandtheelectricalcordfromtheburner
boxhasbeenunplugged.
Blower Motor 1.Isthethermostatcallingforheat?Isthere
Fails to Run: 120Vattheburnerreceptacle?
2. Checkblowersidedoorforseal.Checkdoor
switch.Replaceifnecessary.
3. Checkblowerforobstructions.Replace
blowerifnecessary.
Igniter 1.Checkigniterfordamage.Replaceif
Does Not Glow: necessary.
2. Checkvoltageandresistanceatigniter.
(Voltageshouldbe120V.Resistanceshouldbe
40-75ohms.)
3. Checkforobstructionstotheairinletand
outlet.
4. Checkwiringandhoseconnectionstothe
airswitch.Replaceifnecessary.
5. Checkvoltagesattransformerprimaryand
secondary.Replacetransformerormoduleif
necessary.
Valve Does Not Gaspressuredownstreamofgascontrolcan
Come On: bemeasurebyusingamanometerand
connectingtopressuretaponcontrol/
1. ChecktoseeifmanualvalveheaterisON.
2. Checktoseeifmanualvalveknobonheater
gascontrolinON.
3. Supplygaspressurecanbecheckedat
1/8”NPTpressuretappingonheaterexternal
manualvalve.
4. Checktoseeifgascontrolisopening:no
manifoldpressureindicatesvalveisclosed.
Ifthevalveisclosed,eitherthegasvalveorthe
ignitionmoduleisfaulty.
WARNING:Donotdisconnectgroundleads
insideheater.Donotinterchangegrounded
andungroundedleadsontransformeror
ignitionmodule.
Burner Does Not 1.Checktoseeifgaslineswereproperly
Light: purgedofair.
2. Checkinletandoutletgaspressureduring
ignitionperiod.
Naturalinletpressureshouldbe4.6”
Naturaloutletpressureshouldbesetaccording
tochartonpage12.
LPinletpressureshouldbe11.0”
LPoutletpressureshouldbesetaccordingto
chartonpage12.
3. Checkforproperorificeandairplate.
IGNITION MODULE
LED
20
SECTION 8: Troubleshooting Guide. Heatstar ER2STG
START
Turnonthermostat
Doesblowerturn
on?
Yes
Doestheigniter
warmupandglow
red?
Yes
No
CheckThermostat
andWiring.Isthe
powersupplytounit
120V?
No
Findthesource
oftheelectrical
problem
CheckLEDindicatoronIgnitionControlfor
indicationoffault.RefertoIgnitionModule
testingonpage19todetermineproblem.
No Istheairintakeor
exhaustblocked?
Yes
RemoveObstruction
Checkwiringand
connections
No Istheignitor
damaged?
No
Checkvoltageat
ignitor.Isit120V
duringignition
cycle?
Yes Isblowersidedoor
inplace?
No
Replacedoor
No
Checkwiringand
hoseconnectionto
airswitch.Arethey
OK?
Yes
Isthevoltageat
thetransformer
secondary24V?
No
Isthevoltageatthe
transformerprimary
120 V
Replaceignitor.
Yes
No
Istheresistance
throughigniter40
to75ohms?
Removedoor.Is
voltageatdoor
switch120?
Yes
No
Checkvoltageat
IgnitionControl
Replacewiringand/
orhoseconnection.
No
Jumperwiresat
pressureswitch.
Doestheignitor
glowred?
Yes
ReplacetransformerYes
Checkwire
connections.
Yes
Depressswitch.
Doesblowercome
on?
Yes Yes
No
Checkvoltageto
motor.Isit120V?
Yes
Istheblowerfan
obstructed?
No
Replaceblower
motor.
Replacepressure
switch.
Yes
ReplaceIgnition
Module.
No
CheckLEDindicatoronIgnitionModulefor
indicationoffault.RefertoIgnitionControl
testingonpage19todetermineproblem.
Checkdoorfit.If
damaged,replace
door.
Replaceswitch.
No
Removeobstruction
Yes
Afterignitorwarm-
upperiod,doesthe
valveclick?
Yes
Doestheburner
light?
Yes
Doestheburner
stayon?
Yes
Doestheburner
rununtilthecall
forheatends?
Ifaproblemstillexists,contactEnercoGroup,IncTechnicalProducts
CustomerService1-866-447-2194
No
TheIgnitionModulechecksthestatusoftheblowerprovingswitchcontactsmustseeachangeinthe
contactwitheveryfiringcycle.Placingajumperattheswitchoutofsequencewillresultinafaultwith
theLEDindicatorflashingtwotimes.
Werethegaslinespurgedofair?
No No
Yes
Checkinletgaspressure.Ispressurecorrect?
Refertopage12forcorrectpressureforunit.
Yes
Checkinletgasshutoff.Adjustregulator.
Contactgassupplier
Isthecontinuityof
thegroundwire
OK?
No
Theswitchonthegasvalvemustbeintheon
positionandthelinepurgedofair.
No
Repairwiring.
No
Checkthecontinuityofthegroundwire.
Checkthethermostat.
Checkoutletgaspressureduringignitioncycle.
Refertopage12forcorrectpressure
Yes
Adjusttoproperpressure.
No
AreL1andL2
reversed?
Yes
Yes
Repairwiring
Isthewiringatthe
IgnitionModule
OK?
No
Repairwiring
Istheinsulationon
thesensorleadOK?
No
Repairwiring
No Yes Yes
Arethewiresto
theIgnitionControl
OK?
Yes
ReplaceIgnition
Module.
No Replace/repairwires.
Yes
Checkforproper
burnerorificeand
airplate.
Isthesensor
positioned
properly?
Yes
Isthesensordirty?
No
ReplaceSensor
No Repair/Replace
Yes
Cleansensor.
Afaultindicationofthreeflashesmayindicate
thattheflamesensingcircuitisnotfunctioning
properly.Performthefollowingseriesofchecks
tocorrecttheproblem.
No
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72

HeatStar ER2STG125-N Owner's manual

Category
Space heaters
Type
Owner's manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI