Braemar CPS Installation guide

Category
Thermostats
Type
Installation guide

Braemar CPS is a high-quality evaporative cooler that delivers cool, refreshing air to your home, office, or any other indoor space. It features a powerful motor and fan that circulate air efficiently, a large water tank for extended cooling, and adjustable louvers for directing airflow. Additionally, the Braemar CPS is easy to install and maintain, making it a great choice for those looking for a convenient and cost-effective cooling solution.

Braemar CPS is a high-quality evaporative cooler that delivers cool, refreshing air to your home, office, or any other indoor space. It features a powerful motor and fan that circulate air efficiently, a large water tank for extended cooling, and adjustable louvers for directing airflow. Additionally, the Braemar CPS is easy to install and maintain, making it a great choice for those looking for a convenient and cost-effective cooling solution.

ILL1456-A
(English)(CPL CPSLCBBM)
(OriginalEnglishInstructions)
CPL CPSLCBBMEvaporativeCooler
INSTALLATIONMANUAL
®
WARNING: Failuretoinstallandcommissiontheproductincompliancewiththeseinstructions,or
failuretodothejobproperlyandcompetently,mayvoidthecustomer'swarranty.Further,itcould
exposetheInstallerand/ortheRetailertoseriousliability.
ILL994-C
ILL1048-A
1.UnwraptheCooler. Page
4
Page
4
1.Removepads.
1.Read&understand
thesafetysection. Page
3
SAFETY
FIRST!
Page
5
1.Checkcoolerlocation.
2.Beawareoflocalregulations.
3.Discusswithcustomer.
Page
5
Page
4
1.Removetheventuri.
2.Removethetransition.
Page
6
Page
7
Page
11-13
Page
10
1.Locateandinstallthewall
control.
Page
15
Page
15
1.Setthewaterlevel.
Page
17
Page
17
ILL239-D
Page
17
Page
13
1.Installtheventuri.
Page
20
Page
9
Page
14
1.Connectthecomponents
totheelectronicsmodule.
Page
8
Step15
Step11 Step12Step10
Step13
Step9
Step7Step6 Step8Step5
Step2 Step4Step1
Step17 Step19 Step20
Step18
1
ILL963-A ILL969-A
ILL972-A
Step14
ILL1083-A
ILL1084-A
LESSWATER
MOREWATER
ILL998-B
Step16
1.Cleanupthesite.
Step3
1. Testrunthecooler. 1.Completethechecklist.
Auto
Cool
TIMER
AUTO
COOL
ILL1128-A
Auto
Cool
TIMER
AUTO
COOL
ILL1128-A
SEELEY INTERNATIONAL – INSTALLATIONMANUAL 1
1.Showthecustomerhowto
operatetheirnewcooler.
2.Givethecustomertheirowners
manual.
1.Cutcableholeindropper.
2.Position,levelandsecurethe
dropper.
3.Flashthedropper.
1.Readandadheretothelocal
electricalandplumbingrules
andregulations.
1.Runthepowerandwall
controlcablesdownthe
dropper.
1.Fitthefloatvalve.
2.Fitthedrainvalveorbleedtray.
3.Connectwatersupplytothe
cooler.
1.Ifthereisadrainvalvefittedto
thecooler,setthedrainrateat
thewallcontrolifnecessary.
1.Fitthetransitiontothedropper
andsecure.
2.Breakweatherdampertransport
clipsandfitweatherdamper.
1. Transportthecoolertotheroof.
2. Alwayshandlethecoolerusing
2people.
EXPLODEDVIEW
2
®
CPL CPSLCBBMEvaporativeCooler
®
Whenorderingspareparts,pleasespecifythemodel/serialnumberandcolourofyourcooler.
1
2
3
4
5
6
7
8
9
9
23
11
12
13
14
15
26
24
25
27
28
16
18
19
20
21
22
17
10
ILL 1151-D
ILL972-C
ILL985-D
ILL973-B
1.DropperGrommet
2. Transition
3.Weatherseal
4. TransitionPlug
5.PadFrame
6.FlexibleHose
7.SolenoidCover
8.SolenoidValve
9.Extension Tube
10. Tank
11.CornerPillar
12.WaterSensor
13.FloatValve
14.WaterPump
15.DrainValve
16.MotorPowerLead
17.PowerCord Assy
18.ElectronicsModule
19.PumpHose
20.Venturi/Fan Assy
21.Lid
22.DistributorCap
23.3/4” to1/2” BSP Adaptor
24.BleedFunnel
25.Bush,BleedFunnel
26.Nut40mm(BleedFunnel&DrainValve)
27.Drain Adaptor
28.Nut,Drain Adaptor
WaterInletConfiguration
CPL,CPS,LCB,BM-BleedFunnel
WaterInletConfiguration
CPL,CPS,LCB,BM-DrainValve
WaterOutletConfiguration
CPL,CPS,LCB,BM-DrainValve
WaterOutletConfiguration
CPL,CPS,LCB,BM-BleedFunnel
CPL,BMMotor/Fan/Venturi Assy
CPS,LCBMotor/Fan/Venturi Assy
SAFETY
EMPLOYER ANDEMPLOYEERESPONSIBILITIES
InstallerandMaintenanceContractors
Risk Assessment
Somepointstoconsider:
TheinstallationandmaintenanceofevaporativeairconditioningunitsatheighthasthepotentialtocreateOccupationalHealthandSafety
issuesforthoseinvolved.InstallersareadvisedtoensuretheyarefamiliarwiththerelevantStateandFederallegislation,suchas Acts,
Regulations,approvedCodesofPracticeand AustralianStandards,whichofferpracticalguidanceonthesehealthandsafetyissues.
Compliancewiththeseregulationswillrequireappropriateworkpractices,equipment,trainingandqualificationsofworkers.
SeeleyInternationalprovidesthefollowinginformationasaguidetocontractorsandemployeestoassistinminimisingriskwhilstworking
atheight.
A riskassessmentisanessentialelementthatshouldbeconductedbeforethecommencementofwork,toidentifyandeliminatetherisk
offallsortominimisetheserisksbyimplementingcontrolmeasures.
A riskassessmentofallhazardoustasksisrequiredunderlegislation.
Thereisnoneedforthistobeacomplicatedprocess,itjustisamatteroflookingatthejobtobedoneandconsideringwhataction(s)are
necessarysothepersondoingthejobdoesnotinjurethemselves.
Thisshouldbeconsideredintermsof:
Whatarethechancesofanincidenthappening?
Whatcouldthepossibleconsequencebe?
Whatcanyoudotoreduce,orbetterstill,completelygetridoftherisk?
Whatisthebestandsafestaccesstotheroofandworkingareas?
Ifaworkerisalone,whoknowstheyarethereandiftheygetintodifficulty,howcantheysummonhelp?(Callsomeoneonthe
ground?Mobilephone?etc.)
Whatconditionistheroofin?Shouldthetrusses,undersideorsurfacebechecked?
Doestheworkerhaveappropriatefootwear?(Flatsolejoggertypeisadvisable)
Areallpowercables/extensionleadssafeandappropriatelyrated?
Areallladders,toolsandequipmentsuitableingoodcondition?
Whereladdersaretobeused,isthereafirm,stablebaseforthemtostandon?Cantheybetiedorsecuredinsomewayatthetop?
Isthetopoftheladderclearofelectricitysupplycables?
Istherearoofanchortoattachaharnessandlanyardto?Ifso,instructionshouldbeissuedfortheuseofanapprovedharnessor
onlysuitablytrainedpeopleused.
Arealltoolsandmaterialsbeingused,preventedfromslippingandfallingontoapersonatgroundlevel?Istheareabelowthework
areasuitablyprotectedtopreventpersonswalkinginthisarea?
Doestheworkscheduletakeintoaccountweatherconditions,allowingforworktobesuspendedinhighwinds,thunder
storms/lightningorothertypesofweathergivingwet,slipperysurfaces?
Isthereanon-goingsafetychecksystemofharnesses,ropes,laddersandaccess/liftingequipmentandwheretheyexistonroofs,
anchorpointsbeforethecommencementofwork?
Isthereasystemwhichpreventsemployeesfromworkingonroofsiftheyareunwellorundertheinfluenceofdrugsoralcohol?
Arethereanyspecialconditionstoconsideri.e.excessiveroofpitch,limitedgroundarea,fragileroof,electricalpowerlines?
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
OTHERIMPORTANTREQUIREMENTS
!
!
!
Neverforcepartstofitbecauseallpartsaredesignedtofittogethereasilywithoutundueforce.
Neverdrillanyholesintheprimarybasesurfaceorsidewallsofthebottomtank(reservoir)ofthecooler.
Checktheproposedcoolerlocation,toensurethatitisstructurallycapableofsupportingtheweightofthecooler,orprovidean
adequatealternateloadbearingstructure.
SEELEY INTERNATIONAL – INSTALLATIONMANUAL 3
REMOVINGTHEVENTURI
Oncethepadframeshavebeenremoved,
detachtheventuriandfanassembly.
ForLCB&CPSmodels,
Lifttheventuriandfanassemblyoutofthe
cooler. Takecarewiththemotorlead,which
willbesittinglooselyinthebottomofthe
cooler.
Theventuriandfanassemblycanbeplaced
ontothegrounduntiltherestofthecoolerhas
beeninstalledonthedropper.
!
!
disengagethe
twoventuriclipsasshown(Fig3A).
ForCPL &BMmodels,undothetwo
screwsthatretaintheventuriduring
transport(Fig3B)anddisposeofthe
screwsthoughtfully,astheyarenolonger
required.
2
1
3
12
UNWRAP THECOOLER
Cutandremovetheshrinkwrapfromthecooleranddisposeofthewrap
thoughtfully.
REMOVINGTHEPADFRAMES
Toremoveapadframe,first
disengagethetopclipsofthepad
frame.Insertascrewdrivertipinto
theslotbetweenthelidandthetop
ofthepadframeandleveruntil
disengagementoccurs(Fig2part1).
Takeholdofthepadframeandpullit
towardsyouuntiltheinternalside
clipsdisengage(Fig2part2).
Pivotthepadframeoutwardsandlift
up. Takecarenottodamagethepad
(Fig2part3).
Repeatthestepsabovewiththe
threeremainingpadframes.
REMOVINGTHETRANSITION
Turnthecoolerontoitssidetoremovethetransition. Thereareclipsineachof
thefourcornersthatwilldisengageoncethetransitionisgivenafirmpull
(Fig4).
Ifanyofthecornersaredifficulttoremovedonotuseexcessiveforce.Gently
squeezetheclipstogetherandremovethetransitiononecorneratatime.
4
4
®
CPL CPSLCBBMEvaporativeCooler
®
A =LCB,CPS B=CPL,BM
3
ILL1152-A ILL1153-A
ILL1154-A
ILL1002-B
ILL963-A
ILL182-G
DROPPERSECURELY
ATTACHEDTORAFTER
ONTHREESIDES
6
7
5
COOLERLOCATION
Ensurethelocationisaminimumof:3mfromasolidfuelheaterflue,1.5m
fromagasflue,5mfromasewervent.
Checktheproposedcoolerlocation,toensurethatitisstructurallycapableof
supportingtheweightofthecooler,orprovideanadequatealternateloadbearing
structure.
Alwayslocatethecoolerwhereitwillreceiveaplentifulsupplyoffreshair.Notina
recesswhereitmaybestarvedforairorwheretheairispolluted.
Allowadequateaccessaroundthecoolerformaintenance.Provisionmustbe
madeforaccesstoelectricity,watersuppliesanddrains.
Theideallocationforthecoolerisinacentralpositionontheroof(awayfrom
sleepingareasandwherepeoplespendmostoftheirtime)sothattheductrunsare
ofapproximatelythesamelength.
Carefullyconsiderneighbouringresidencesandnoiselevelswhenlocatingthe
cooler,ifnecessarytalktothecustomerandtheneighboursbeforecarryingoutthe
installation.
Note!Doyouneedtodiscusstheinstallationofitemslikesafetyanchor
pointsoraccesswiththecustomer?
The550mmx550mmdropperductmusthavearawedgeorsafeedgeatthetop.
Donotturninaflangeasthiswillinterferewiththetransitionandweatherdamper.
Removethetransitionandflashthedroppercarefully,sothereisnochanceofanywater
enteringtheroofspace.
MOUNTINGTHEDROPPER
Cutthe50mmdiametercableexitholeinthedropperthenfitandscrewthecable
grommetintoposition(Fig6).Locatetheholesothatthecableswillnotinterferewiththe
fullyopenedweatherdamper.
Fitthetransitiontemporarilytothedropper(Fig9page6),thenlocatethedropperinto
position.Useaspiritleveltoensurethetopofthetransitionislevel.
Important!
Thedroppermustbesecurelyfixedtotheroofstructureonatleast3sides(Fig7).
Thismayrequiretheadditionofsomeextrastructuraltimber.
Thedroppermustneversitdirectlyontoanyceilingjoistsorbeams,astheremay
beassociatednoisetransfer,causingproblemsafterinstallation,including
possibleceilingdamage.
5
SEELEY INTERNATIONAL – INSTALLATIONMANUAL
ILL983-A
ILL988-A
11
ILL1049-A
8
INSTALLINGTHETRANSITION ANDWEATHERDAMPER
Refitthetransitionontothedropperasshown.Ensurethatit
isorientedcorrectly,asshownbytheengraveddetailonthe
transition(Fig8).
Checkthelevelofthetransitiononthedropperwithaspirit
level,placedacrosstheflatsinbothdirections.
Oncelevel,beginsecuringthe
transitiontothedropperusingthe
screwsprovided. Thereareeight(8)
‘V’ notchlocationsforscrews.
Onlyusethescrewsprovided.
Thesemustbeusedinthecorrect
positions(Fig10)toprevent
interferencewiththe
weatherdamper. Alleight(8)screws
mustbeused.Checkthelevel
periodicallybeforedrivinginallthe
screws.
IMPORTANT:Theremustbeno
obstructionstotheweatherdamperopening
fullyasitwilladverselyaffectthe
performanceofthecooler.
Breakoffbothclipsonthetransitionthatretain
theweatherdamper(Fig11).
Ensurethattheweatherdamperflapsopenall
thewayanddonotinterferewiththedropper
oranyscrews. Theflapsshouldmovefreely
through90º.
10
6
®
CPL CPSLCBBMEvaporativeCooler
®
9
BREAK
OFF
CLIP
13
TRANSPORTINGTHECOOLERTOTHEROOF
Donottakeriskswhenraisingthecoolertotheroof
forinstallation.Usesafetyequipment,appropriate
proceduresandalwayshaveassistance.
Itisrecommendedthatatleasttwo(2)peoplemove
thecoolerintopositionandthatthetransition,pad
frames,venturiassemblyandanyunsecuredobjects
areremovedbeforehand.
Attachropesorslingsthroughthecentraltankhole
(Fig12). Alwayshandlethecoolerwithcare.
Ifyouintendtopullthecoolerontotheroofusinga
ladderasaslide,thenguidethecooleronthe
undersideofthetank(Fig13).
Oncethecoolerisontheroof,carefullyliftthe
assemblyontothetransitionandintoplace. The
assemblywillonlyfitontothetransitioninone
orientation.
Ensurethattheclipsinallfourcornersengage
correctly.Donotuseanyscrewsto
fixthecoolertothetransition(Fig14).
IMPORTANT:Donotplacetheventuriassembly
intothecooleratthisstage.
12
14
7
SEELEY INTERNATIONAL – INSTALLATIONMANUAL
LCB,CPS CPL,BM
16
ILL1288-A
Plug
CABLEINSTALLATION
NOTE!Leavetheelectronicsmodulesafelyinthetank,asthemotor
plugwillrequireconnectiontotheundersideofthemodulewhenthe
venturiisrefittedintotheCooler.
WARNING:Donotletcables,cableends,orthecontrolboxgetwet.
Afterfittingthecoolertothedropper,disconnecttheelectronicsmodulefrom
thetankbyremovingthescrewundertheswitchasshown(Fig15). The
isolationswitchcannotbeactivatedwiththisscrewremoved.Placethe
electronicsmoduleandthescrewtoonesideinthetank.
Yourinstallationkitincludesthepowercordandthermostatcable.Dropthe
powercordplugendalongwiththetapedendofthethermostatcableinto
thedropperduct.Routethepowercordsocketendwiththethermostat
cableupwardsthroughthecornerholeinthetransitionandoutthetank
cavityasshown.Lockthepowercordsocketinplacebyslidingtheplugin
sidewaysasshown.
Theplugwillonlyinsertoneway,withthechamferedendfirst(Fig16).For
now,leavethethermostatcableendinthetankasitwillbeconnectedlater.
Positionthecordsinthedroppersotheywillbeaccessiblefrominsidethe
roofspace.
Passthecordsthroughthegrommetinthedropper.
Donotcoiltheexcesslengthofthepowercord.Placeexcesslengthofthe
thermostatcableintheroofcavityandnotinsidethecoolerordropper.
Pushthecablesintothecableslotinthetransitionasshown(thermostat
cablefirst)andthensealtheholewiththeplugprovided.
IMPORTANT
Testtheweatherdamperoperationandensurethatthecablesinthe
dropperdonotinterferewiththeoperationoftheweatherdamper.
8
®
CPL CPSLCBBMEvaporativeCooler
®
CPMDequippedEVAPORATIVE
COOLER
BRAEMARSCC
SPECTROLINK
HEATERCONTROLLER
BRAEMARGASHEATER
TheSCCmustbesetto “COOL 1"
tooperateanevaporativecooler
CPMD
BSC
SCC
CPMDCOMMSLOOM SCCCOMMSLOOM
Heater
power
supply
To CCterminallabelled
SpectrolinkMultiZoneonBSC
Cooler
power
supply
To CPMDterminallabelled
ToEVAP ControlonBSC
ILL1478-A
CONNECTINGTHECOOLERTO A BRAEMARSPECTROLINKGAS
HEATERCONTROLLER
Thiscoolercanbeinter-connectedtoaBraemarGasHeaterandoperated
fromtheBraemarSCCSpectrolinkHeatercontroller. AnySeeley
InternationalevaporativecoolerequippedwithaCPMDElectronicModule
canbeoperatedthisway. Thefollowingdiagram(Fig17)showsthe
connectionsrequired:
17
15
ELECTRICAL REQUIREMENTS
.
Specification:240V/50HzSinglePhase
InstallationofthecoolermustconformtoNational,StateandLocalelectricalrules,regulationsandstandards.
ItisarequirementofSeeleyInternationalthatallcoolersbewiredwithadedicatedcircuittothedistributionboardadheringto
localandnationalwiringstandards
A 10A socketoutletwithinonemetreofthedropperscableexitholeisalsorequired.
Theelectronicsmoduleisfittedwitha12A resettablecircuitbreaker. Toresetthecircuitbreakerturnofftheisolationswitch,removethe
electronicsmoduleandpushthemanualresettoggleswitchlocatedunderneaththeelectronicsmodule.
WATERREQUIREMENTS
InstallationoftheCoolerwatersupplymustconformtolocalplumbingrules,regulationsandstandards: AS/NZS3500.1
Thefollowingspecificationsforwatersupplyarerequired:
A permanentwatersupplyisrequiredtobeconnectedtothefloatvalve. Thewaterconnectionpointislocatedontheundersideofthe
cooler.
Installamanualballvalvetypewatershut-offinthewatersupplylineadjacenttothecooler,thisallowsthewatersupplytobeisolated
wheneverworkneedstobedoneonthecooler,subjecttolocalplumbingregulations.Itisnotrecommendedtouseanon-returntypeshut
offvalve.
: Thewaterconnectionisa1/2BSP compressionfittingontheendofaflexiblehose. Thiscanfit
directlyontothewaterpipeorbescreweddirectlyontothemanualwatershut-offvalve.
Alwaysensurethatthewaterpipeconnectiondoesnotplacesidewaysstrainontothefloatvalve.
: Thewaterconnectionfittingisa1/2BSP maleadaptorsuitableforacompressionfitting.Donot
fitthemanualwatershut-offvalvedirectlyontotheplasticnipple.
WaterConnections:½BSP
WaterSupply:800kPa(115psi)MAXIMUM
WaterSupplyTemperature:40°CMAXIMUM
!
IMPORTANT!Flushthewaterpipetoremoveanyswarfbeforefinalfitting.
Important Ifthewaterpressureexceedsthismaximumspecificationthenapressurereducingvalveisrequiredandmustbe
suppliedandfittedbytheinstaller.
Inareassubjecttofreezingorwherefreezingmayoccur,draindownorfrostprotectionmustbefitted.
Forcoolershavingthedrainvalvefitted
Forcoolershavingthebleedtrayfitted
9
SEELEY INTERNATIONAL INSTALLATIONMANUAL
ILL1066-B
1.
2.
3.
Usethebracketasatemplate.
1.Drillthe16mmholeforthewallcontrol
cable.
2.Drillthe5mmholesforthewallplugs.
3.Insertthewallplugsintotheholes. Align
andscrewthebracketintopositionusing
thesuppliedscrews.
Fixingthewallcontrolbrackettoa
plasterboardwall
1
2
3
ILL 1210-A
Fixingthewallcontrolbrackettoa
brickwall
Tomountthewallcontrolbracketonabrick
wall,followthepreviousinstructions(Fig18
usingthewallplugsandscrewsprovided.
Notethatthewallplugsrequire6mmholes.
Mountthecontrollerfollowingtheprocedure
inFig19.
1.Pullthewallcontrolcablethroughthe
largerholeandplugitintothewallcontrol.
2.Feedtheexcesscablebackintothehole
andseal.Slidethewallcontroloverthe
protrudingbrackettabs.
3.Pullthewallcontroldownsothebracket
tabsengageandlocatewiththekeyway
slotsontherear.
Fittingthewallcontroltothemounting
bracket
ILL1068-B
18 20
19
LOCATINGTHEWALL CONTROL
Thewallcontrolshouldbeplacedapproximately1.5metresabovethefloor,inthemostusedroominthehome. Thiswillgivethe
optimumtemperaturesensingandoperatingpositionfortheuser.
:
Avoiddirectsunlightexposure.
Avoidmountingonexternalwalls.
Avoidmountingthewallcontrolnearheatsourcessuchasstovesandtelevisions.
Donotlocateinthedirectairflowoftheductoutlets.
Donotlocateinstrongdraftsorindeadspotssuchascupboards/drawers.
Alwaysfillinthecableentryhole. Aircomingthroughthewallmayinterferewiththetemperaturemeasurement.
Placementiscriticalforcorrectfunctioningofthethermostat(incorporatedinthewallcontrol). Thefollowingpointsmustbetaken
intoconsideration
CAUTION! Alwaysmakesuretherearenoelectricalcables,gasorwaterpipes,orthelike,behindwhereyouintendtodrill.
Runningthewallcontrolcabletothewallcontrol
!Takecarenottodamagethecableorplugduringthisprocess.
Usingtheloopontheend,drawthecablethroughthewallcavitytotheholemadeatthewallbracket.Carefullyremovethetape
fromthecableloopsandcheckthattheplughasnotbeendamaged.Connectthecabletothewallcontrolandmountthewall
controlontoitsbracket.
Alwayssealthecableentryhole.Important
10
®
CPL CPSLCBBMEvaporativeCooler
®
BLEEDTRAY
(StandardforCPL,CPS&BMmodels,optionalforLCBmodels)
!Ifthewatersensorisfitted,youwillneedtodisconnectitfromthe
ElectronicsModuleandremoveitfromtheCoolercompletely.Thenfitthe
shortingplug(suppliedintheBleedkit)tothesocketwherethewater
sensorwasfitted(Fig32).
Thebleedfunnelreducestheaccumulationofsaltsandmineralsinthecooler.It
alsoactsasanoverflowandadrain.
Assemblethebleedfunnelasshown(Fig22).
Makesurethebleedfunneliscorrectlyorientedandthattheo-ringsarefitted
beforeplacingitintothehole.Screwthenutuptightlybyhandunderneaththe
cooler.
Makesurethatyouusethecorrectdrainadaptor.Drain-waterfromthebleed
funnelmustbecarriedawaytoasuitabledischargepointonthebuildingor
propertyinaccordancewithlocalregulations.Donotdraindirectlyontotheroof
surface.
Thebleedraterequiredwillvaryaccordingtowaterquality,butshouldinitiallybe
settotheminimumrateassetoutinthetable.
LCB250 BM500 CPL450 CPS450 1Plugin
LCB350 BM750 CPL700 CPS700 1Plugin
LCB450 BM900 CPL850 CPS850 2Plugsin
LCB550 BM1150 CPL1100 CPS1100 2Plugsin
Pushtheremainingplugsintotheblindholesprovided.Inpoorqualitywater
areaswherethesaltandmineralcontentsarehigh,adjustthebleedrateby
insertingoneormoreextraplugsthanspecifiedinthetable.
Note
WATERCONNECTION
FLOATVALVE
Ifyoudonotintendtoinstallthedrainvalve,assemblethefloatvalvetothe
coolerasshown(Fig21).Ensureallwashersando-ringsareinplace.Nothread
tapeisrequired.Donotovertighten.
Makesurethefloatiscentrallypositionedandupanddownmovementis
unrestricted.
Seepage15forsettingthecorrectwaterlevel.
Connectthewatersupplytothefloatvalvenipple.
21
22
11
SEELEY INTERNATIONAL INSTALLATIONMANUAL
SOLENOIDVALVE
(StandardforLCBmodels,optionalforCPL,CPS&BMmodels)
Ifthedrainvalveistobeinstalledinsteadofthebleedfunnel,assemblethefloat
valvetothecoolerwiththesolenoidvalveasshown(Fig23).Ensureallwashers
ando-ringsareinplace.Nothreadtapeisrequired.Donotovertighten.
Thesolenoidvalvehasbeenscrewedintotheflexiblehose,andmustnotbe
disconnected.(Note:
Tightenthesolenoidvalveuntilitsealsagainsttherubberwasherandisinthe
orientationshownsuchthatthesolenoidcoverwillcliponoverthetop(Fig24).
Thewatersolenoidisrequiredtobeinstalledinthe
directionofflowasperthearrowindicatoronthesolenoid,Fig23).
Connectthesuppliedcabletothesolenoidvalve,thenpushtheotherend
throughtheholeinthetransitionasshown.Pullthecablethroughfrominsidethe
coolerandroutethecableasshown(Figs24&25). Thiswillbeconnectedlater.
Nowclipthesolenoidcoverinplaceandconnecttheflexiblehosetothemains
watersupply.
DRAINVALVE
(StandardforLCBmodels,optionalforCPL,CPS&BMmodels)
Assemblethedrainvalveinsteadofthebleedtrayifyouhaveinstalledthe
solenoidvalve.
Assemblethedrainvalveasshown(Fig26).
Makesurethattheo-ringisfittedbeforeplacingthedrainvalveintothehole.
Screwthenutuptightlybyhandunderneaththecooler.
Makesurethatyouusethecorrectdrainadaptor.
Makesurethedrainwaterdischargeflowsfreelyawayfromthecooler.
Drainwatermustbecarriedawaytoasuitabledischargepointonthe
buildingorpropertyinaccordancewithlocalregulations.
Donotdraindirectlyontotheroofsurface.
!
!
!
!
!
!
23
26
24
12
®
CPL CPSLCBBMEvaporativeCooler
®
25
Note! TheSolenoidValvehasawaterflowdirectionalarrow.
IMPORTANT:Forcoolersfittedwithadrainandsolenoidvalve,itisa
requirementtofitthenewdetachablehosesetsupplied.
Anyoldhosesetsshouldnotbere-used.
INSTALLINGTHEVENTURI/FAN ASSEMBLY
Theventuri/fan/motorassemblycannowbecarried
upontotheroof.(Placetheassemblyintothecooler
andletitrestnearitscavityinthetank.) The
assemblywillonlyfitintothetankinoneorientation
(Fig28).
ForLCB/CPSmodelsonly:Important
Important
!Before
fittingtheventuriintoposition,makesurethe
motorleadexitsthroughtheventurinotchand
locatedinthemotorleadchannel(Fig28).
Ensurethebottomoftheleadisalignedwiththe
bracketinsidethetank(Fig29-B).Failuretodo
thismayresultinthecablebeingcaughtbetween
theoutsideofthebracketandtheventuri.
!Makesuretheventuriiscorrectlyand
symmetricallylocatedallthewayaroundits
cavity.Checkthisbymakingsuretheventurisits
insidethelocatingridgeallthewayaround.(Fig
29-C).Ensuretheplug/leadassyisnotcaught
underthebottomlipoftheventuri,bypullingthe
leadthroughfully.
ForCPL andBMmodelsonly: D
Feedthemotorleadthroughthechannel(Fig29- A)
inthemountingbracketwheretheElectronics
Modulesits.Snaretheleadintooneofthebrackets
atthetopoftheopening(Fig29-A).
onotrefitthe2
transportscrewsremovedwhilstinitiallydis-
assemblingtheventuri.Disposeofthesescrews
thoughtfully.Fordetail,refertopage4describingthe
venturiremovalsteps.
27
28
B
A
C
ILL1229-D
WATERSENSOR
(StandardforLCBmodels,optionalforCPL,CPS&BMmodels)
Ifyouinstalledthedrainvalve,assemblethewatersensorasshownbyclippingthe
sensortothetank(Fig27).Ensurethattheclipfullyengages.
Routethesensorcablethroughthecablesupportsinthetankasshownandleave
theendclearofanywater. Thecablewillbepluggedinlater.
13
SEELEY INTERNATIONAL INSTALLATIONMANUAL
29
ILL994-C
LCB,CPS CPL,BM
33
ILL496-A
30
32
ELECTRICAL CONNECTION
ConnectthemotorcabletothebaseoftheElectronicsModule.Itisa
polarisedplugandwillonlyinsertoneway.Ensureitissecuredfullysothat
itsretentionclipsareengaged.
Routetheendofthewallcontrolcableoutofthecavityviathesame
channelasthemotorcable(Fig30).Ensureyouhaveabout200mm(8)of
wallcontrolcableoutsidethecavity.
Withbothcablesinplace(insidethechannel,Fig30),re-assemblethe
electronicsmoduleandscrewittothetankasshown(Fig31).
IMPORTANT:Theisolationswitchcannotbeactivatedunlessthis
screwisfixedinplace,asshowninFig31.
PlugthewallcontrolcabletotheelectronicsmoduleaccordingtoFig32.
Ifyouhaveinstalledthedrainvalve,removetheshortingplug(pre-installed
forCPL,CPSandBMmodels),whichwillbeconnectedtothewatersensor
socketonthecontrolbox(Fig.32)
Thenconnectthewatersensorandsolenoidvalveplugsasshown.Ensure
theplugsareconnectedinthecorrectorientation(seebottomofFig32).
Routethedrainvalvecableasshownbeforeconnectingittotheelectronics
module(Fig33).
Finally,turnontheisolationswitch,replacethepadframes(exceptthefront
padframetoallowaccess)andturnonthepowerattheGPOandthe
distributionboard.
Ifyouhaveinstalledthebleedtray,ensuretheshortingplugisfittedtothe
watersensorsocketonthecontrolbox(Fig32).
Theshortingplugispre-installedformodelsCPL,CPSandBM,andis
includedintheoptionalBleedFunnelkitforLCBmodels.
IMPORTANT!: Ifadrainvalveisconnected,donotconnectthepump
plugyet.Otherwisefitthepumpplugtotheelectronicsmodule,as
showninFig32.
IMPORTANT!:Ensurethecablescannotrestinthewateroncethetank
isfilled,andareconnectedinthecorrectorientationasshownatthe
bottomofFig32.
31
14
®
CPL CPSLCBBMEvaporativeCooler
®
ILL1062-F
ConnectorOrientation
7
Shorting
Plug
MINIMUMSPEED ADJUST
PUMP
DRAIN
INLET SOLENOID
WALL CONTROL
ORRECEIVER
DIAGNOSTIC
LED’S
WATERSENSOR
(ORSHORTING
PLUGFORBLEED
FUNNEL)
Ifthelevelistoohighrotatethefloat
clockwise.Ifitistoolowrotatethefloat
anti-clockwise,asshown(Fig36).
Ifyouinstalledthedrainvalve,a
completedraincanbeinitiatedby
holdingdownbothSand T
for1secondwhenthethermostatis
OFF. Thesignal willdisplayto
confirmthedrainoperationhas
activated.
dr
36
35
34
15
SETTINGTHECORRECTWATERLEVEL
Ifthereisnodrainvalvefitted,justturnonthewatersupplytofillthetank.Ifthedrain
valveisfitted,youneedtoleavethepumpdisconnectedwhilstsettingthewaterlevel.
Ifyouhaveinstalledthedrainvalveinsteadofthebleedfunnelyouwillneedtoturn
thewateronbypressingCOOL onthethermostatwhileitisintheOFFstate. The
waterinletvalvewillnowremainopenfor15minutes.
Whenthetankisfullthefloatvalvewillstopthewaterenteringthecooler.Waitforthis
tohappenandobservethelevel. Thecorrectwaterlevelisapproximately5mmbelow
thesurfaceofthetankthefloatvalveismountedon(Fig35).
SEELEY INTERNATIONAL INSTALLATIONMANUAL
DRAINRATE ADJUSTMENT
ForCPL,CPSandBMmodels(optionalDrainValveoperation)
NOTE:Thefollowingprocessmustbecarriedoutwithinfour(4)minutesof
mainspowerbeingappliedtotheCooler.Ifunsureofthetimesincethe
mainspowerwasapplied,removemainspowertothecoolerforaminimum
ofsix(6)secondsandthenre-applypowersothemodecanbeentered.
ForLCBmodels,thedrainfrequencyismanagedbysalinitycontrol. Thereisno
needforadjustment.
Ifyouinstalledthedrainvalveinsteadofthebleedfunnelthenthewaterwilldrain
everytwo(2)hoursduringcoolingoperation. Thisdefaulttimecanbeadjusted
accordingtowaterquality. Thewaterchangeregularitycanbeincreasedinareas
wherewatersalinityishighorqualityisrelativelylow.Maintainingthewater
qualityhelpsthecooleroperatemoreeffectively.
WhilethethermostatisOFF,holddown AUTOforatleast3secondsandthen
press whilestillpressing AUTO.
Thesetting A1willbedisplayed,releasebothbuttons.Nowpressuntil
A8isdisplayedandthenpress AUTO.
A numberwillnowbedisplayed.Pressoruntilthenumber
displayedcorrespondstothedesireddraindelaytimeaccordingtothetable
below.
Press AUTOtocompletetheadjustment.
ExittheprogrammingmodebypressingON/OFF. Abortanalterationbypressing
ON/OFFinsteadof AUTO.
ILL1080-A
ILL1083-A
ILL1084-A
DisplayNumber Timebetweendrains
05 1.3hours
07 STANDARD 2hours
11 4hours
15 10hours
40
WATERPUMP CONNECTION
(Drainvalveoptiononly)
!Ensurethesplashprotectionflapshown(Fig38)isin
place.
!Donotrunthepumpwhilethepadframesareoffandthe
fanison.
Switchofftheelectronicsmodule.Routethepumpcordasshown(Fig37)
andconnectthepumptotheelectronicsmodule.Switchtheelectronics
moduleon.
IMPORTANT
WARNING
39
LEDshouldbe
green
37
38
16
TESTOPERATION
Note!
Checkthatthegreenlightontheelectronicsmoduleisonanddouble
flashingevery2seconds(Fig39). Thisindicatesthatpowerisconnectedto
theelectronicsmodule.Makesurethattheflexiblecoverontheelectronics
moduleisfullyclosedasshown(Fig38).
Replacetheremainingpadframes andrunthecooler. Tostartthe
cooler,pressON/OFFonthethermostat.Ifthecoolerhasnotbeenon
beforeitwillstartinManualcontrolmode(Manwilldisplayasshown). The
displaywillflash Pre-CoolCycleandthepumpwilloperatetosaturatethe
pads. Thepumpwillstartimmediatelyforunitswiththebleedtray,forunits
withadrainvalvetherewillbeadelaybeforethepumpcommences
operation(30secondsafterthewaterreachesthewatersensor).
The Pre-Coolwillbeinoperationfor2minutesafterthepumpstarts,then
thefanwillstartautomatically.
Stopthecoolerandcheckthateachofthepadsareevenlysaturated.
Ifoninitialstartuptheword Serviceappearsonthecontrollerand
bypushingthe buttonnothingchangesonthedisplay,thenyouwill
needtoestablishcommunicationbetweenthewallcontrolandtheelectronic
controller.Simplypushandholdthe buttonforapprox.10
secondsoruntiltheword Servicedisappears.Ifbypushingthe
buttonanumberappearsrefertoPage19forfaultcodes.
ON/OFF
ON/OFF
(Fig40)
®
CPL CPSLCBBMEvaporativeCooler
®
ILL1014-G
Pleasetakeafewmomentstoexplaintothecustomerthefollowing:
Howfarthewindowsneedtobeopened.
Howtoturntheuniton.
Explainthe PRECOOLmode.
Howtooperatethecooler manually.
Howtooperatethecoolerin ventmodeonly.
Howtooperatethecoolerin automode.
Howtodrainthecooler(ifdrainvalvefitted).
Howtoturnthepowerandwateroff.
Maintenancerequirements.
Present the customer with their warranty card for their attention.
Present the customer with their owners manual, and encourage them to keep it for future
reference.
!
!
!
!
!
!
!
!
!
36
41
42
TIMER
AUTO
COOL
ILL1128-A
ILL1211-A
43
TESTINGTHECOOLER
OnceyouaresatisfiedthattheCoolerisinstalledandcommissionedcorrectly,itis
importanttorunthecoolerandensurethateverythingisworkingasitshould.
Checkthattheunitrunsquietlyandwithanevendistributionofairtoalloutlets.
Ifadrainvalveisfitted,initiateadrainofthetankbypressingboththeupanddown
buttonstogether,withthewallcontrolinthe OFFstate(Fig41).Checkthedrainfittings
andpipes,makingsuretherearenoleaks.Ensurethedrainwaterdischargesfreely
awayfromthecooler.
CLEANUP THESITE
Cleanupandtidythepremises,removingallrubbish. Youraimshouldbetohavethe
customernotevenawarethatyouhavebeen,apartfromhavingtheirnewcooler
installedtoenjoy!
SHOW THE CUSTOMER THEIR NEW COOLER
This is a good time to explain the features and principles of Evaporative Ducted Cooling to
the new owner. Explain the wall control operation, how to exhaust the premises, and how to
best run their cooler.
17
SEELEY INTERNATIONAL INSTALLATIONMANUAL
PROBLEM:Inadequatecooling
CAUSE REMEDY
1. Pumpnotworkingcorrectly Checkplug,wiringandcircuitbreaker.Checkwaterlevel
andsensor.Impellormaybejammedorobstructed.Rectify
faultorreplacepump.
2. Drypads. Checkwaterflowtopads.Inspectfitmentofdistributorcap.
Checkforblockedorkinkedhose.Ifblocked,dismantle,
cleanandflushorunkinkthehose.Checktheinletsolenoid
filterforblockage.
3. Leakingducts Findleaksandseal.
4. Weatherdamperfailingtoopen. Breakofftransportclips.Checkforweatherseal/transition
screwinterference.Checkminimumfanspeedsetting.
PROBLEM:Motorstartsandstopsatintervals
CAUSE REMEDY
1. Looseelectricalconnections. Checkallelectricalconnections.
2. Fannotturningfreely. Determinecauseandrectify.
3. Weatherdamperfailingtoopen. Breakofftransportclips.Checkforweatherseal/transition
screwinterference.Checkminimumfanspeedsetting.
PROBLEM:Continuallyleakingwaterwhenturnedoff
CAUSE REMEDY
1. Dirtunderdrainvalveseal. Cleanandrefitseal,cleananyremainingdebrisfromtank.
2. Dirtunderfloatvalveseal. Cleanandrefitseal.
3. Damagedfloatvalveseal. ReplaceFloatValveseal.
4. Waterlevelsettoohigh. Setwaterlevelasdescribed.
5. Waterpressuretoohigh. Installpressurereducingvalve.
PROBLEM:Unpleasantodour
CAUSE REMEDY
1. Odourfromnewpads Allowtimetoconditionbyrunningthecooler.
thenallowthetanktore-fill.
Drainthewater,
PROBLEM:Novariablespeed
CAUSE REMEDY
1. Faultyelectronicsmoduleorwallcontrol. Replaceelectronicsmoduleorwallcontrol.
2. Minimumfanspeedsettoohigh. Adjustminimumfanspeed(Fig32page14).
18
®
CPL CPSLCBBMEvaporativeCooler
®
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24

Braemar CPS Installation guide

Category
Thermostats
Type
Installation guide

Braemar CPS is a high-quality evaporative cooler that delivers cool, refreshing air to your home, office, or any other indoor space. It features a powerful motor and fan that circulate air efficiently, a large water tank for extended cooling, and adjustable louvers for directing airflow. Additionally, the Braemar CPS is easy to install and maintain, making it a great choice for those looking for a convenient and cost-effective cooling solution.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI