CONTENTS
4
8024250/AE00/V1-0/2020-07 | SICKOPERATING INSTRUCTIONS | ZIRKOR200 Ex-G
Subject to change without notice
5 Installation................................................................................................32
5.1 Determination of the requirements for explosion protection ..................... 32
5.2 Information on installation in potentially explosive atmospheres.............. 32
5.3 Tools required ............................................................................................... 34
5.4 Material required .......................................................................................... 34
5.5 Preparing the measuring point ................................................................... 34
5.6 Transport....................................................................................................... 34
5.7 Storage information...................................................................................... 35
5.8 Scope of delivery .......................................................................................... 35
5.9 Installation .................................................................................................... 35
5.9.1 Fitting the counterflange on the duct ........................................ 36
5.9.2 Installing the control unit ............................................................. 36
5.9.3 Installing the probe ...................................................................... 37
5.9.4 Installing the measuring probe with cooling protection tube..... 39
5.9.5 Installing the measuring probe.................................................... 39
5.9.6 Aligning the V-shield..................................................................... 40
5.9.7 Laying the probe cable................................................................. 41
5.9.8 Installing the probe cable ............................................................ 42
5.9.9 Fitting the pneumatic unit............................................................ 43
5.10 Electrical installation .................................................................................... 44
5.10.1 Accessing the terminals .............................................................. 45
5.10.2 Instructions for the function of the spring-loaded terminal ....... 45
5.10.3 Potential equalization (PE, ground) ............................................. 45
5.10.4 Connecting the control unit ........................................................ 46
5.10.5 Electrical connection diagram (Ex control unit and Ex probe) ... 47
5.10.6 Power connection......................................................................... 49
5.10.7 Connecting the probe cable to the control unit ......................... 50
5.10.8 Connecting the probe valve line to the control unit ................... 50
5.10.9 Connecting the pneumatic unit line to the control unit ............. 50
5.10.10 Outputs/functions and relay assignment.................................... 50
5.10.11 Digital inputs ................................................................................ 51
5.10.12 Installing signal cables................................................................. 51
5.10.13 Connecting signal cables ............................................................. 51
5.10.14 Connecting the probe head to the probe cable .......................... 53
5.10.15 Connecting the probe valve line to the solenoid valve ............... 54
5.10.16 Connecting the pneumatic unit to the solenoid valve ............... 54
5.10.17 Closing the enclosure................................................................... 54
5.11 Pneumatic connections and settings .......................................................... 55
5.11.1 Pneumatic hose requirements ................................................... 55
5.11.2 Preparing the pneumatic hose .................................................... 55
5.11.3 Pneumatic connections, probe .................................................... 56
5.11.4 Pneumatic connection, pneumatic unit semi-automatic or
fully automatic ............................................................................. 56
5.11.5 Test air volumes and reference air volumes............................... 56
5.11.6 Setting the flow volume ............................................................... 57