Pytes E-box Installation guide

Category
Signal cables
Type
Installation guide
1.Connect Power Cable & Ground Cable
Warning: Ensure that the battery power switch is off
Single
Single
Multiple
Single
Single
Multiple
Multiple
Multiple
Note: Each battery should be connected to a Bus Bar
when installing multiple batteries.
2.Connect Communication Cable
3.Set the DIP Switch
4.Start up the System
Note: Ensure the pin order of communication cable is correct.
Note: Select CAN or RS485 port based on the communication type
of inverter.
Note: Please connect the master battery and the inverter.
Note: Only the DIP switch
of master battery need to
be set.
Note: Set the DIP switch based
on the inverter you installed.
QUICK INSTALLATION
BMS
Inverter Battery
Slave
Master
Link Port 0
Link Port 1
Link Port 0
Link Port 1
Link Port 0
Link Port 1
Link Port 0
Link Port 1
Must be vacant
......
+
+
+
+
Turn on.
Press 1-2 seconds.
Wait 2-3 seconds and
the running light flash in-
dicates that the battery
is working properly.
1
Turn on all
the button.
1
2
3
3
Press 1-2 seconds.
2
Note: Make sure the connection to the inverter is correct before starting the battery.
To inverter
Bus Bar
To inverter
To home ground
RS485
or
CAN
Wait a few seconds
and the batteries will
automatical turn on one
by one, until all the ru-
nning lights flash,indi-
cating that the batteries
are working properly.
Scan to view
the user manual
  • Page 1 1

Pytes E-box Installation guide

Category
Signal cables
Type
Installation guide