King gates Bat Owner's manual

Type
Owner's manual

This manual is also suitable for

INSTRUCTION MANUAL MADE IN ITALY
EN
Bat K2
Battery charger card for Star 124, 224 and 224 Box
BAT K2
BAT M016
KING gates - Brand of Antoniolli Mario & C. s a s
Via A. Malignani, 42 - 33077 Sacile (PN) ITALY Tel. +39 0434 737082 - Fax +39 0434 783382
e-mail: [email protected] web: www.king-gates.com
MADE IN ITALY
1
2
1 - GENERAL DESCRIPTION
The “BAT K2” card is arranged to charge batteries up to 24Vdc and max 7Ah.
BAT K2” includes only the battery charger card. The batteries can be bought separately (KING-gates
code “BAT M016”). The duration of the batteries depends on the Ah of the battery, the absorbing of
the motor (or the motors) connec-ted, and the total absorbing of the accessories.
The batteries, when connected, are generally flat.
It is necessary to wait about 16 hours for a full charge of the batteries.
2 - INSTALLATION ON “STAR M224” (MODUS operator)
Below it is shown how to install “BAT K2” on a “STAR M 224” (“Modus” operator).
On “Modus” operator, the box where the charger card is inserted is not necessary, since there is a proper
compart-ment on the bracket of the control unit.
If the batteries (1) are compatibles
with the dimensions, insert them
in the proper compartment
(the KING-gates batteries “BAT M016” are
arranged to be inserted in the operator).
Take off the cover (2) removing the screws (3).
Then, take off the card (4) rom its box,
and insert it on the bracket
(the supplied box is not necessary).
After having done the connections shown on
paragraph 5 or 6 fix the cover again (2).
3
2
1
1
4
3 - INSTALLATION ON “STAR D124” (DYNAMOS 24-600 / 350 EV OPERTOR)
Below it is shown how to install “BAT K2” on a “Star D124” (operators “Dynamos 24/600
or “Dynamos 24/350 EV”).
If the batteries (1) are compatibles with the
dimensions, insert them in the proper compartment
(the KING-gates batteries “BAT M016” are arranged
to be inserted in the operator).
After having done the connections
shown on paragraph 4, 5 or 6
inserire la “BAT K2” (2) on the proper compartment.
1
1
2
1 - GENERAL DESCRIPTION
The “BAT K2” card is arranged to charge batteries up to 24Vdc and max 7Ah.
BAT K2” includes only the battery charger card. The batteries can be bought separately (KING-gates
code “BAT M016”). The duration of the batteries depends on the Ah of the battery, the absorbing of
the motor (or the motors) connec-ted, and the total absorbing of the accessories.
The batteries, when connected, are generally flat.
It is necessary to wait about 16 hours for a full charge of the batteries.
2 - INSTALLATION ON “STAR M224” (MODUS operator)
Below it is shown how to install “BAT K2” on a “STAR M 224” (“Modus” operator).
On “Modus” operator, the box where the charger card is inserted is not necessary, since there is a proper
compart-ment on the bracket of the control unit.
If the batteries (1) are compatibles
with the dimensions, insert them
in the proper compartment
(the KING-gates batteries “BAT M016” are
arranged to be inserted in the operator).
Take off the cover (2) removing the screws (3).
Then, take off the card (4) rom its box,
and insert it on the bracket
(the supplied box is not necessary).
After having done the connections shown on
paragraph 5 or 6 fix the cover again (2).
3
2
1
1
4
3 - INSTALLATION ON “STAR D124” (DYNAMOS 24-600 / 350 EV OPERTOR)
Below it is shown how to install “BAT K2” on a “Star D124” (operators “Dynamos 24/600
or “Dynamos 24/350 EV”).
If the batteries (1) are compatibles with the
dimensions, insert them in the proper compartment
(the KING-gates batteries “BAT M016” are arranged
to be inserted in the operator).
After having done the connections
shown on paragraph 4, 5 or 6
inserire la “BAT K2” (2) on the proper compartment.
1
12 24 +BAT-GND
4 - ELECTRIC CONNECTIONS
The connections must be done without tension, and paying attention to not to touch the poles of the battery. In presence of an electro lock (manageable only by the control units “Star 224” and “Star M224”)
connect it as shown below.
The batteries must be 24Vdc max 7Ah
CHARGER
CARD
“BAT K2”
BLACK WIRE (-)
RED WIRE (+)
CONNECTOR
(follow theinsertion
direction)
24VDC
BATTERIES
MAX 7Ah
T
N
A
DN
G
1
POF
1CC
F
V0
2
PO
F
2CC
F
PMA
L
V
+
TE
LE
V0
T
RA
T
S
24V
0V
12V
1TOM2TOM
12 24 +BAT-GND
BLACK WIRE (-)
RED WIRE (+)
ELECTROLOCK
12V / 24V
max 15W
CARD FOR
ELECTRIC LOCK
“SELC 12”
24VDC
BATTERIES
MAX 7Ah
CHARGER
CARD
“BAT K2”
TNA
DNG
1
P
O
F
1CCF
V0
2
P
OF
2CC
F
P
MAL
V
+
T
E
L
E
V0
T
RATS
V0
POTS
DE
P
1
O
HP
2O
H
P
V0
A
V+
24V
0V
12V
1TOM2TOM
CONNECTOR
(follow the
insertion direction)
+VEL
5 - CONNECTION OF AN ELECTRO LOCK WITH “SELC 12”
The batteries must be 24Vdc max 7Ah
BROWN WIRE
BLACK WIRE
RED WIRE
BROWN WIRE
BLACK WIRE
RED WIRE
12 24 +BAT-GND
4 - ELECTRIC CONNECTIONS
The connections must be done without tension, and paying attention to not to touch the poles of the battery. In presence of an electro lock (manageable only by the control units “Star 224” and “Star M224”)
connect it as shown below.
The batteries must be 24Vdc max 7Ah
CHARGER
CARD
“BAT K2”
BLACK WIRE (-)
RED WIRE (+)
CONNECTOR
(follow theinsertion
direction)
24VDC
BATTERIES
MAX 7Ah
T
N
A
DN
G
1
POF
1CC
F
V0
2
PO
F
2CC
F
PMA
L
V
+
TE
LE
V0
T
RA
T
S
24V
0V
12V
1TOM2TOM
12 24 +BAT-GND
BLACK WIRE (-)
RED WIRE (+)
ELECTROLOCK
12V / 24V
max 15W
CARD FOR
ELECTRIC LOCK
“SELC 12”
24VDC
BATTERIES
MAX 7Ah
CHARGER
CARD
“BAT K2”
TNA
DNG
1
P
O
F
1CCF
V0
2
P
OF
2CC
F
P
MAL
V
+
T
E
L
E
V0
T
RATS
V0
POTS
DE
P
1
O
HP
2O
H
P
V0
A
V+
24V
0V
12V
1TOM2TOM
CONNECTOR
(follow the
insertion direction)
+VEL
5 - CONNECTION OF AN ELECTRO LOCK WITH “SELC 12”
The batteries must be 24Vdc max 7Ah
BROWN WIRE
BLACK WIRE
RED WIRE
BROWN WIRE
BLACK WIRE
RED WIRE
In presence of an electro lock (manageable only by the control units “Star 224” and “Star M224”) connect it as
shown below.
12 24 +BAT-GND
BLACK WIRE (-)
RED WIRE (+)
ELECTROLOCK
12V /24V
max 15W
CARD FOR
ELECTRIC LOCK
“SELC 100”
24VDC
BATTERIES
MAX 7Ah
CHARGER
CARD
“BAT K2”
TNA
DNG
1
P
O
F
1CCF
V0
2
P
OF
2CC
F
P
MAL
V
+
T
E
L
E
V0
T
RATS
V0
POTS
DE
P
1
O
HP
2O
H
P
V0
A
V+
24V
0V
12V
1TOM2TOM
CONNECTOR
(follow the
insertion direction)
6 - CONNECTION OF AN ELECTRO LOCK WITH “SELC 100”





BROWN WIRE
BLACK WIRE
RED WIRE
In presence of an electro lock (manageable only by the control units “Star 224” and “Star M224”) connect it as
shown below.
12 24 +BAT-GND
BLACK WIRE (-)
RED WIRE (+)
ELECTROLOCK
12V /24V
max 15W
CARD FOR
ELECTRIC LOCK
“SELC 100”
24VDC
BATTERIES
MAX 7Ah
CHARGER
CARD
“BAT K2”
TNA
DNG
1
P
O
F
1CCF
V0
2
P
OF
2CC
F
P
MAL
V
+
T
E
L
E
V0
T
RATS
V0
POTS
DE
P
1
O
HP
2O
H
P
V0
A
V+
24V
0V
12V
1TOM2TOM
CONNECTOR
(follow the
insertion direction)
6 - CONNECTION OF AN ELECTRO LOCK WITH “SELC 100”





BROWN WIRE
BLACK WIRE
RED WIRE
INSTRUCTION MANUAL MADE IN ITALY
EN
Bat K2
Battery charger card for Star 124, 224 and 224 Box
BAT K2
BAT M016
KING gates - Brand of Antoniolli Mario & C. s a s
Via A. Malignani, 42 - 33077 Sacile (PN) ITALY Tel. +39 0434 737082 - Fax +39 0434 783382
e-mail: [email protected] web: www.king-gates.com
MADE IN ITALY
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8

King gates Bat Owner's manual

Type
Owner's manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI