7. Remove and discard the Screws (A), and then
remove the Pulse Crossbar (81). Remove the
four 5/16" x 5/8" Screws (11).
8. Attach the Trays (95, 96).
3
81
11
11
A
96
95
1
1
1
1
1
6. Route the Upright Wire (91) through the Left
Handrail (79). Attach the Left Handrail. Remove
and discard the Screws (C). Repeat this step
on the right side.
5. Slide the Base Covers (88, 89) onto the
Uprights (84, 85).
89
85
84
88
12
8
79
Wire
Tie
91
C