Yunca Hobson Installation & Operating Manual

Type
Installation & Operating Manual
Hobson Installation AUSTRALIA - AUG 2014.doc www.yunca.co.nz Page 1 of 4
A division of Terry Young Ltd, New Zealand
INSTALLATION INSTRUCTIONS for
HOBSON FREESTANDING WOODBURNER
AUSTRALIA - AUGUST 2014
TESTED in compliance with AS/NZS 2918: 2001
HARDWOOD TEST No. 30A-12-0038-TRP-254693-1
A. Yunca recommends that competent trades persons carry out all installations (e.g. AHHA
Registered Installer), to obtain maximum performance and safe, efficient heating.
B. A permit is required and we suggest you check with local building inspectors as by-laws do
vary from area to area.
Also notify your Insurance Company that a solid fuel heater has been installed.
C. Floor Protector
1. Must extend a minimum of 300mm in front of the door aperture.
2. Must extend at least 100mm from each side panel of the heater.
3. Ash Floor Protector must be constructed of non-combustible materials.
D. Seismic restraint Heater must be restrained from seismic movement as required by
AS/NZS 2918:2001. 10mm diameter bolting holes in the feet of the HOBSON allow restraint.
E. Manufacturers’ recommended tested minimum clearances from combustible walls:
Tested to AS/NZS 2918 : 2012 by VIPAC ENGINEERS & SCIENTISTS
Clearance
Rear Clearance (with YUNCA flue mounted shield fitted)
150 mm
Side Clearance (with YUNCA flue mounted shield fitted)
330 mm
Corner Clearance (with YUNCA flue mounted shield fitted)
90mm
Tested to AS/NZS 2918 : 2012 by VIPAC ENGINEERS & SCIENTISTS
Clearance
Rear Clearance (with AUSTRALIAN flue mounted shield fitted The Flue Factory)
200 mm
Side Clearance (with AUSTRALIAN flue mounted shield fitted The Flue Factory)
330 mm
Corner Clearance (with AUSTRALIAN flue mounted shield fitted The Flue Factory)
140 mm
F. Standard 150mm Flue Kit (Tested to AS/NZS 2918:2001 Appendix F): FIG A, B & E
1. 4.2m x 150mm stainless steel flue 3. 1 x insulation boundary shield.
2. 2.4m x 250mm galvanised liner. 4. 2 x spider brackets.
3. Ceiling Plate. 6. 1 x weather cap & cowl.
Please Note: All flue joints must be sealed with flue sealing compound. Use stainless steel screws or
rivets to join the flue pipe (three equally spaced places at each joint). The first length of flue must
be fixed to the flue spigot with at least one stainless steel screw or rivet. The required minimum
flue termination height is 4.6 m above the floor protector.
G. HOBSON Yunca Flue Mounted Shield (Flue Guard) Kit.
Complies (with heater) to AS/NZS 2918:2001): Refer FIG A
1 x 1200mm length lined back guard.
1 x 1200mm length perforated front guard
1 x 1200mm length tertiary back guard with spacer tabs.
1 x Top front deflector shield (half round shape, this is angled 30 degrees when installed).
H. AUSTRALIAN (Flue Factory Flue Mounted Shield (Flue Guard) Kit.
Standard Triple lined flue guard kit.
Please Note: The minimum Flue Mounted Shield height is 1200mm.
HOBSON TYPICAL INSTALLATION (Drawings not to scale)
Hobson Installation AUSTRALIA - AUG 2014.doc www.yunca.co.nz Page 2 of 4
FIG A (below, left): HOBSON (Sub 1.0) Flue Mounted Shield (Flue Guard) Kit.
Complies (with heater) to AS/NZS 2918:2001
5mm Max
50
LINER POSITIONED BY SPIDER
BRACKETS. TOP/BOTTOM
FLUE
TOP CAP (Fits inside flue)
FLASHING
25 MM BETWEEN LINER
AND ANY TIMBER.
TIMBER RAILS
SUPPORT ANGLES
25 mm min BETWEEN LINER
& ANY TIMBER
LINER POSITIONED BY SPIDER
BRACKETS TOP & BOTTOM.
SUPPORT ANGLES
300mm sq TIMBER FRAME
CEILING
1200mm BACK GUARD
TERTIARY
BACK GUARD
TWO SEISMIC RESTRAINT
attachment points.
600mm ABOVE THE RIDGE LINE (MIN) *
* If within 3.0m of ridge line*
1200mm FRONT GUARD
4.6 M. MINIMUM
Note: All Dimensions are in millimetres.
ASH FLOOR
PROTECTOR
620
300
150
900 Extension
Top Front
Angled
Lined
Deflector
65mm Gap
FIG C: HEATER DIMENSIONS HOBSON (Drawings on this page not to scale)
CONDITIONS FOR FLUES (Refer Fig. E)
1. The FLUE shall extend to:
Not less than 600mm above the highest
point on the roof if within 3.0m of that
point, or
Not less than 1000mm above the
intersection point with the roof and not
lower than any point of the roof within
3.0m.
In any case the length of the flue shall
not be less than 4.6m from the ash floor
protector.
In some situations the Local Council may
vary the above requirements.
2. The flue system must be tested and
comply with AS/NZS2918:2001,
Appendix F.
3. The insulation boundary shield shall be
capable of preventing accidental
migration of loose-fill or any combustible
material by any action of wind or by
persons moving in the ceiling space.
These instructions, as well as spare parts
information, operation and maintenance
guides may be downloaded from :
www.yunca.co.nz
CEILING PLATE
25mm min. BETWEEN LINER & ANY TIMBER
ENLARGEMENT OF CEILING ASSEMBLY
300
300mm Sq. TIMBER FRAME
TIMBER RAILS
SUPPORT ANGLES
LINER POSITIONED BY SPIDER
BRACKETS. TOP/BOTTOM
INSULATION BOUNDARY SHIELD
CUT CEILING MATERIAL
BACK 25mm CLEAR
OF BOUNDARY SHEILD.
CEILING
25
300
FIG B
Hobson Installation AUSTRALIA - AUG 2014.doc www.yunca.co.nz Page 3 of 4
570
215
620
667
640
Ash Floor Protector
490
300
FIG D: HEATER POSITION:-
N.B. The “B” and “D” measurements on the Hobson are taken from the heater sides.
“O” measurement is the width of the heater, excluding the cook top surface.
25
25
640
670
300
100 100
A
F
B
G
O
J
D
D
C
N
K
J
P
C
DD
O
K
C
N
H
M
L
E
E
D
D
H
FIG D: MINIMUM HEATER TO COMBUSTIBLE WALL CLEARANCES in mm
FLUE SHIELD
A
B
E
F
G
H
Yunca
150
330
90
365
650
468
Australian(FlueFactory)
200
330
140
415
650
518
MINIMUM FLOOR PROTECTOR MEASUREMENTS in mm
FLUE SHIELD
C
D
J
K
L
M
N
O
P
Yunca
300
100
840
940
1237
1160
575
640
640
Australian(FF)
300
100
840
990
1307
1210
575
640
690
Above: Non combustible wall clearances. Brick lining from floor to
within 25mm of ceiling. Leave air vents at the bottom to allow airflow
in the cavity. If Yunca flue mounted shield is fitted, brickwork may be
1200mm high as long as all vertical joints in top and bottom of
brickwork are left out to allow airflow when brickwork is capped.
Hobson Installation AUSTRALIA - AUG 2014.doc www.yunca.co.nz Page 4 of 4
FLUE SYSTEM REQUIREMENTS FIG. E
More than 30003000
or less
600 min.
3000
1000 min. if clear
within 3000 of
flue top
.
3000
Any nearby
structure
.
1000 min. if clear
within 3000 of
flue top
MINIMUM HEIGHT OF FLUE SYSTEM EXIT
NOTE : Dimensions are in millimetres
3000
or less
600 min.
More than 3000
3000
.
Increase from
1000 min. until
clear within
3000 of flue top
IMPORTANT INFORMATION
A. THE APPLIANCE AND FLUE SYSTEM SHALL BE INSTALLED IN COMPLIANCE WITH AS/NZS
2918:2001 AND THE APPROPRIATE REQUIREMENTS OF THE RELEVANT BUILDING CODE OR
CODES.
B. APPLIANCES INSTALLED IN ACCORDANCE WITH THIS STANDARD SHALL COMPLY WITH THE
REQUIREMENTS OF AS/NZS 4013 WHERE REQUIRED BY THE REGULATORY AUTHORITY I.E. THE
APPLIANCE SHALL BE IDENTIFIABLE BY A COMPLIANCE PLATE WITH THE MARKING TESTED TO
AS/NZS 4013
C. ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE
TESTING AUTHORITY IS CONSIDERED TO BE IN BREACH OF THE APPROVAL GRANTED FOR
COMPLIANCE WITH AS/NZS 4013
D. MIXING OF APPLIANCE OR FLUE SYSTEM COMPONENTS FROM DIFFERENT SOURCES OR
MODIFYING THE DIMENSIONAL SPECIFICATION OF COMPONENTS MAY RESULT IN HAZARDOUS
CONDITIONS. WHERE SUCH ACTION IS CONSIDERED, THE MANUFACTURER SHOULD BE
CONSULTED IN THE FIRST INSTANCE.
E. CRACKED AND BROKEN COMPONENTS E.G. GLASS PANELS OR FIRE BRICKS, MAY RENDER THE
INSTALLATION UNSAFE.
IF A WATERBOOSTER IS FITTED:
NOTE: A WATER BOOSTER CANNOT BE FITTED TO THE HOBSON (SUB 1.0) CLEAN AIR MODEL
A. DO NOT CONNECT TO AN UNVENTED HOT WATER SYSTEM
B. INSTALL IN ACCORDANCE WITH AS 3500.4.1 OR NZS 4603 AND THE APPROPRIATE
REQUIREMENTS OF THE RELEVANT BUILDING CODES.
SEISMIC RESTRAINT
Secure the heater base to the hearth or sub-framing with Dynabolts or similar through the holes
provided.
Follow local Council’s Specifications.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Yunca Hobson Installation & Operating Manual

Type
Installation & Operating Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI