TAP ENJ-CP Preamp Jack Owner's manual

  • Hello! I've reviewed the user manual for the TAP ENJ -CP Preamp Jack, which includes detailed installation instructions for the endpin jack, battery bag, volume and tone controls, and the optional piezo pickup. The manual also provides guidance on making necessary adjustments for the installation process. I'm here to answer any questions you may have about it.
  • What size drill bit is needed for the endpin jack?
    What is the battery life?
    What size hole is needed for the piezo pickup cable?
ENJ CP
Preamp Jack with Volume, Tone and on board Gain control & Piezo bar
INSTALLATION
1. Endpin jack preamp
installation.
Make a hole in guitar for endpin
jack. Use 12.5 mm or 1/2 inch
drill bit for wood.
Install the endpin jack from
inside of guitar body
Endpin jack preamp comes with
power switch function and will
turn on when plug in.
2. Battery bag installation
Install battery bag with included
velcro tape.
Place 9V alkaline battery into
battery bag. (1500hours)
3. Volume and tone controls
installation
Make clean the surface of guitar
inside with sand paper.
Mount the self adhesive PCB,
(volume, tone) board in
location.
4. Optional piezo pickup
installation
Make clean and flat for bottom
of bridge cavity.
Reduce height of bridge bar as
pickup’s height.
Make a hole for piezo pickup
cable (use 3mm or 1/8”).
/