1
SAMOS DEEP LINE ASSEMBLY INSTRUCTIONS
IGL
OO Stary
Wiśnicz 289, 32-720 Nowy
Wiśnicz,
T
el. 14 662 19 10 / F
ax: 14 662 19 12
[email protected] / www.igloo.pl
en
ORIGINAL MANUAL 22.05.2019
READ CAREFULLY BEFORE USE
KEEP FOR FUTURE REFERENCE
LINE ASSEMBLY INSTRUCTIONS REVISION
PAGE: 1/10TYPE: SAMOS DEEP NO. DATE NO. DATE
DOCUMENTATION NO.: A D
NO.: 0 B E
DATE of 1st issue:
26.05.2019
TABLE OF CONTENTS C F
NO. SECTION PAGE
REV.
STATUS
DOCUMENTA-
TION NO.
0 TABLE OF CONTENTS 1 - x
1 Unpack 2 - x
2 Prepare the fasteners delivered with the counter 2 - x
3 Prepare necessary assembly tools 2 - x
4 Prepare for line assembly 3 - x
4.1 Unpack the shelves, screens and worktops 3 - x
4.2 Remove the louvre 3 - x
4.3 Remove the fans 3 - x
4.4 Remove the ventilation grilles 3 - x
5 Apply the sealant mastic 4 - x
6 Remove the socket head cap screw near the top lamp 4 - x
7 Place the modules (single counters) in line 4 - x
8 Align all installation holes 5 - x
9 Place the modules app. 5 mm apart 5 - x
10 Join the modules using delivered fasteners 5 - x
11 Level the set using the spirit levels 5 - x
12 Install the fans 6 - x
13 Install the louvre 6 - x
14 Install the worktops 6 - x
14.1 Place the worktops on the set 6 - x
14.2 Glue the worktops 6 - x
14.3 Seal the worktops 7 - x
14.4 Remove the lm from the two-sided prole of night covers 7 - x
14.5 Apply adhesive on the prole 7 - x
14.6 Install the prole on the granite worktop 7 - x
15 Adjust front glass panels 8 - x
16 Apply sealant on the modules joints 8 - x
17 Place the shelves 8 - x
18 Place the screens 9 - x
19 Install the partitions (if any) 9 - x
20 Install the client shelf (if any) 9 - x
21 Install the night covers 9 - x
22
After the line assembly and before the start-up, connect all plugs between
the modules
10 - x
23
Have the counters connected to the cooling and power infrastructure by
an authorized sta indicated by the customer
10 - x
KEY:
- First issue
A, B, ... Rev. index
X No. of section corresponding to documentation No.