FR-1/22G-PEW

Allied Brass FR-1/22G-PEW, FR-1/22G-ABR, FR-1/22G-ABZ, FR-1/22G-BKM, FR-1/22G-CA, FR-1/22G-PB, FR-1/22G-PNI, FR-1/22G-SBR, FR-1/22G-SN, FR-1/22G-UNL, FR-1/22G-VB Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Allied Brass FR-1/22G-PEW Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
19.50
MOUNTING SCREW
LUG
Back Plate
Step 1:
Measure and mark for two holes in the wall based on the center to center of the Towel Bar.
Drill 1/2" holes into marks for Toggle Wings and screws.
Drill Holes into the Wall
Mounting of Screws
Screws are inserted through the mounting lug so that it protrudes through other side
of backplate.
Step 2:
FR-1G-22
INSTALLATION INSTRUCTIONS
No portion of this document or any artwork contained herein should reproduced in any way without the written conset of ALLIED BRASS INC.
WING NUT INITIAL POSITION
-SQUEEZED OFF TO FIT DRILLED HOLE
IN WALL
WING NUT (INSTALLED)
WALL
MOUNTING SCREW
BACK PLATE
MOUNTING LUG
WALL
Towel Bar
Towel Bar
Set Screw
Step 3:
Wing nut is attached to screw and pushed into wall. Make sure the head of the screw fits
inside the countersink of the mounting lug. Make same process on mounting the other
Back Plate.
Wing Nut Installation
Tower Bar Installation
Backplates are tightened against wall and Towel Bar are attached to mounting lug with the
use of set screws.
Step 4:
No portion of this document or any artwork contained herein should reproduced in any way without the written conset of ALLIED BRASS INC.
/