2
1. Preparation of Installation
Remove the Front Panel
• To remove front panel, please refer to page 15
“Removing and Attaching the Front Panel”.
• Make sure to use both hands to attach and remove
the front panel.
Remove the Top Grill
• To remove top grill, please refer to page
15 “Removing and Attaching the Top Grill”.
Remove the Lower Cover
• Pull at the 2 and 1 in the directions
as shown by arrows to remove the
lower cover.
• To attach the lower cover, attach 1
first and then attach 2 by rotating it
around the 1 as the fulcrum.
Preparation of Refrigerating Pipe and Fresh Air In Exhaust Hose
Backward piping
Cutting Lower Cover Bush
(Horizontal Downward Piping)
•
•
Insert drain cap up to the location
securely till the cap stops.
Move the drain hose insulation to
take out the drain hose.
After inserting the drain hose, insert the drain
hose insulation sheet to the location securely.
Be sure to insert drain hose and
drain cap firmly. Insufficient insert
may result in water leakage.
It's easier to use pliers to pull out the drain cap.
Wiring Connection
•
•
Refer to page 12.
Bush
Bush
Groove on the outer side
Groove on the inner side
Drain cap
Drain cap
Drain hose
Drain hose
Drain hose
insulation sheet
Drain hose
Drain hose
insulation sheet
The rib at the indoor unit side
Attaching
Removing
Changed of Drain Hose and Installation Procedures
(Horizontal Piping)
•
•
•
Place the starting
point of refrigerating
pipe bending within
the wall hole range.
If the starting point of
refrigerating pipe bending
is projected from the wall
hole range or if the bending
radius is too large, the
indoor unit may be lifted
from wall and this may
cause poor finishing.
Please bend at a
small radius to form an arc.
Wall hole
range
(Mark detail)
Center line
of wall hole
Fresh air in exhaust hose
Drain hole
Pipe support
Pipe support
wall hole range
Pipe support
Connecting
cord
Refrigerating
pipe
Mark detail
Drain hose
Please follow the same
layout as the mark.
Wrap with tape
Bottom cover
bush hole
Drain
hose
Fresh air in
exhaust hose
Refrigerating pipe
insulation sheet
Refrigerating pipe
insulation sheet
Cut
Refrigerating
pipe
Refrigerating
pipe
Fix temporarily
with tape
Transform
after bending
downward.
Pipe
support
Refrigerating
pipe
Join the refrigerating pipe, drain
hose, two way air exchange hose
and connecting cord, and then fix
them temporarily with tape.
Wrap the through-hole portion with tape.
Horizontally and Downward Piping from right
Layout of horizontally
piping from right
Pipe support
Drain
hose
Drain
hose
CAUTION
Transform the
piping while holding
down the lower portion
of pipe-support by
hand.
•
(2)
Bend it with the
smallest radius.
Place the starting
point of refrigerating
pipe bending the
wall hole range.
< Mark detail >
If the starting point
of refrigerating pipe
bending is projected
from the wall hole
range or if the
bending radius is
too large, the indoor
unit may be lifted
from wall and this
may cause
poor finishing.
hole rangehole range
Center line
of wall hole
Center line
of wall hole
Fresh air in
exhaust hose
Fresh air in
exhaust hose
Drain hoseDrain hose
Refrigerating
pipe
Refrigerating
pipe
Refrigerating
pipe
Pipe support
Fresh air in
exhaust hose
Bend the refrigerating pipe to
follow the same layout as the mark.
CAUTION
•
Pipe support
Wrap with tape
below
5 mm
Insert polyester core (commercial
product) into the pipe.
The end of the refrigerating pipes are
at locations marked with “ ” symbol.
Installation after connection of refrigerating pipes
(Horizontally piping)
(Model : SP-BT-2)
B Dimensions = (807-A) mm
Indoor Unit
Indoor Unit
Wall
Pillar
Be sure that the wire is not in contact with any metal in
the wall. Please use the protection pipe as wire passing
through the hollow part of the wall so as to prevent the
possibility of damaged by mouse.
Unless it seals completely any air with high humidity
flows from outdoor and any dew may drop.
•
•
Ensure that the fresh air in exhaust hose which passes through the elbow the room is
covered with insulation sheet for hoses.
Dew may form on the elbow and fresh air in exhaust hose and there may be a possibility of
water droplets forming.
Air duct for rear horizontal piping
Fresh air in exhaust end connection
Wrap the insulation for rear
horizontal piping without space
between insulation and hose, and
then secure them with tape (locally
procured)
Make sure to bring the square
hole to the bottom side
Square hole
Elbow for right piping
Securely connect the fresh air in exhaust hose to the fresh air in exhaust
connecting port. The hole for rear horizontal piping should come to the
bottom side after the connection.
(4)
Horizontally rear-out piping
(1)
Cut off 100mm of the hose insulation to be wrapped around the fresh air in exhaust hose. Cover the fresh air in exhaust
hose (A) or (B) with the insulation, and secure them with vinyl tape.
(2)
Securely connect the fresh air in exhaust hose to
the fresh air in exhaust connecting port.
(1)
(2)
(3)
Cut the hose insulation which is to be wrapped around the left piping elbow along the
perforation. Cover the elbow with the insulation and secure them with vinyl tape.
Cut the hose insulation along the perforation. Cut it off according to the hose length.
(Insulation length:
Distance from the indoor unit to the hole in the wall.)
Securely connect the fresh air in exhaust hose (A) or (B) to the left piping elbow. Then, wrap
the insulation which has been cut according to the above (2) around the fresh air in exhaust
hoses. Cover the fresh air in exhaust hose which runs indoor side with hose insulation and
wrap the tape without any space. When horizontally piping is carried out for fresh air in
exhaust hose, the split line of the hose insulation should come to the top.
Hose insulation
Perforation
Insulation for left piping elbow
Elbow for left piping
“LEFT” is indicated on the
opposite side of arrow
Larger
dimension
Smaller
dimension
Align the end face to the elbow
line, wrap and secure with vinyl
tape.
Elbow for left piping
(4)
Securely connect the fresh air in exhaust hose to the fresh
air in exhaust connecting port.
(Vertically down from left and horizontally piping from left
can be arranged by turning the elbow for left piping by 90
degrees.)
2 piping directions of vertically down from left and
horizontally piping from left are available by turning
the elbow for left piping by 90 degrees.
(1)
(2)
(3)
(4)
(5)
Obtain dimension D by measuring the dimension of the
existing hole in the wall.
Remove the adapter at the tip of the air duct for rear
horizontal piping. Cut short the air duct for a length of
dimension D.
For insulation, cut it off into a length shorter than the air duct
main body by 23mm.
Attach the adapter to the tip of the air duct.
Cut the hose insulation which is to be wrapped around the
elbow for right piping along the perforation. Cover the elbow
with the insulation and secure them with vinyl tape.
Cut off 200mm of the hose insulation and wrap the cut
insulation around the fresh air in exhaust hose.
Existing hole
Proper hole
Air duct main body
Adapter
Air duct for rear
horizontal piping
When the Existing Hole in the Wall is Out of Alignment In
Case of Directly Backward Piping
For the subsequent procedures, refer to “Directly
backward piping", "Vertically down from right",
"Horizontally piping from right”.
Please use hidden beams in the wall to hold
the mounting plate.
When it is difficult to look for a stud, use an
item such as board anchor (sold on the open
market).
Drill hole for board anchor
•
•
While placing the mounting plate on the wall,
embed the board anchor in the wall.
Slide down the mounting plate and then fix
the mounting plate with the board anchor.
When mounting using crown molding and head jamb
•
•
•
Temporarily assemble the mounting plate and the vertical rail
according to the dimension H between the crown molding and
head jamb.
Using the crown molding and head jamb, temporarily attach
the top and the bottom of the vertical rail.
Clamp the mounting plate after making sure that it is level.
(Screws in the illustration below are supplied
with the vertical rail.)
Better finishing with small gap between the
unit and the head jamb can be obtained by
aligning the mark “Vertical Rail 0 Position”
on the mounting plate to the scale “0” on the
vertical rail.
Mark on the
mounting plate
“Vertical Rail
0 Position”
Head
jamb
Indoor unit
Position of the hole to be made in the wall can
be decided by attaching the lower cover to the
mounting plate.
When the hole in the wall is ø80mm, align the mark on
the lower side of the lower cover to the mark on the
mounting plate. When the hole in the wall is ø65mm, align
the mark on the upper side of the lower cover to the
mark on the mounting plate.
When installing between 0.90m pillars
When installing using the existing hole in the wall
For the place where the pillar is projected from the wall surface, use the optional vertical rail
for mounting between 0.90m pillars (model: SP-BT-3) or horizontal rail (model: SP-BY-1).
When installing the unit using the existing hole in the wall but the indoor unit cannot be
moved due to a hole on the left side, form the auxiliary refrigerating pipe of the indoor unit as
shown in the illustration.
Form the pipe carefully to avoid crushing of the pipe.
For connection of the fresh air in exhaust hose, refer to “When the Existing Hole in the Wall
is Out of Alignment In Case of Directly Backward Piping” on page 5.
Existing hole in the wall
Auxiliary refrigerating pipe
of the indoor unit
Drain hose insertion cuff mark
Securely push in the drain hose until the drain
hose cuff mark comes in contact with the rib
at the indoor unit side.
Remove the auxiliary insulation material sheet which is attached to
the pipe insulation. (Keep the removed auxiliary insulation material
sheet because it will be reused after pipe connection.)
Referring to the mark on the rear side, form the pipe within the wall
hole range.
Layout for the hole in the
wall of
ø
65 in case of
directly backward piping
Auxiliary pipe
Auxiliary insulation sheet
Finishing of pipe bending
must be within this range.
Bending of the
refrigerating pipe
must be within the
wall hole range.
Exchange the location of drain hose and drain cap while
installing the pipe from the left side as shown on top right.
Remove the lower cover.
Do not carry out horizontal piping for drain hose.
Center line
of wall hole
Fresh air in exhaust hose
Layout for the hole in the
wall of ø65 in case of
directly backward piping
Auxiliary pipe
Bending of the
refrigerating pipe
must be within the
wall hole range.
hole range
wall
Remove the auxiliary insulation material sheet which is attached
to the pipe insulation. (Keep the removed auxiliary insulation
material sheet because it will be reused after pipe connection.)
Carry out refrigerating pipe forming.
In case of horizontally piping from
right, the fresh air in exhaust hose
runs below the pipe. Bend the pipe
so that it comes to the upper end
of the bottom cover bush hole, as
shown in the illustration on the
right.
Connect the fresh air in exhaust hose. (Refer to page 3
"Fresh Air In Exhaust Hose Installation").
Referring to the mark at the back, join the refrigerating pipe,
drain hose, fresh air in exhaust hose and connecting cord,
and then fix them temporarily with tape.
Connect the fresh air in exhaust hose.
(Refer to page 3 "Fresh Air In Exhaust Hose Installation").
Referring to the mark at the back, join the refrigerating pipe,
drain hose, fresh air in exhaust hose and connecting cord,
and then fix them temporarily with tape.
Remove the auxiliary insulation material sheet which is
attached to the pipe insulation.
Connect the refrigerating pipe.
Cut the heat insulation sheet refrigerating pipe aligning to the
insulation sheet of the pipe and fix them temporarily with tape.
Cover the pipe connection with the auxiliary insulation sheet,
which has been removed on earlier stage, with its split line on
the top. Wrap the tape without any space.
Tape must not be
over tightened.
Auxiliary insulation sheet
Form the refrigerating pipe according to the wall hole position.
Especially in case of horizontally backward piping, follow the
instruction below to carry out accurate forming.
Layout for the hole in the wall
of ø65 in case of horizontally
backward piping
wallwall
Referring to the mark at the back, start bending the
refrigerating piping within wall hole range.
When forming, bend the refrigerating pipe with the
smallest radius as the layout of the mark.
Connect the fresh air in exhaust hose. (Refer to
page 3 "Fresh Air In Exhaust Hose Installation").
Form the connecting cord and refrigerating pipe and
put them in the space on the lower side of the rear
s
urface of the indoor unit. Fix them with the pipe
support.
Join refrigerating pipe, fresh air in exhaust hose,
connecting cord and drain hose temporarily with
tape and wrap the through-hole portion with tape.
Pipe support can be installed to
whichever side of the installation
points. However, it is recommended
to attach it on the right side viewing
from the rear.
Form and set the refrigerating pipe and the connecting
cord.
Connecting the Refrigerating Pipe at the Back of the
Indoor Unit
•
Please bend at a small
radious to form an arc.
(Pipe can be bent with a
small radius without being
crushed if polyester core is
used.)
When using a polyester core,
make sure to insert it only after
flaring is carried out to avoid
cutting dust from getting inside.
<Forming of refrigerating pipe for horizontally
backward piping>
(1)
Use the groove on
the outer side when
installing the fresh
air in exhaust hose,
and use the groove
on the inner side
when not installing.
While installing the pipe from the right, left or bottom side,
use a knife to cut openings as shown in figure. Then
smoothen the edges of openings with a file.
Vertical rail (optional)
Vertical rail is an optional accessory
Vertical rail (optional)
< IA236 : A >