Shine Company 7678WT Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Shine Company 7678WT Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
PARTS INCLUDED:
Item# 7678 - How To Assemble Your Counter High Table
TOOLS NEEDED: Philips screwdriver, power drill optional
CAUTION: When assembling table, DO NOT completely tighten the bolts and nuts until all the parts &
holes are properly aligned.
(REV. 03/2017)
1 PC Table Top
A
A
2 PC Legs
B1
2 PC Legs
B2
B1
B2
Step 2:
Attach Table Top with 2 Long Machine
Threads (6 x 55 m/m), 2 Nuts and 2 Iron
Washer for each side. Make sure to place
the Nuts & Iron Washer on the inside
of legs.
.
4 PC Long Machine Thread
(6 x 55 m/m)
4 PC
Iron Washer
Step 1:
4 PC
Nuts
Spanner
(4 x 4 m/m)
12 PC Short Machine Thread
(6 x 40 m/m)
Connect & Legs together
with six Short Machine Threads
(6 x 40 m/m) for each side -
3pcs for each corner.
B1
B1
B1
B2
B2
B2
6 PC
Short Machine
Thread
(6 x 40 m/m)
6 PC
Short Machine
Thread
(6 x 40 m/m)
2 PC
Long Machine
Thread
(6 x 55 m/m),
2 Nuts & 2 Iron
Washer
A
/