P121-DOME-CI

Zurn P121-DOME-CI, P125-CC, P125-DOME-CI, Z121-3NH, Z121-4NH, Z125-2NH, Z125-3NH, Z125-3NH-89-C-R, Z125-3NH-C-R, Z125-4NH Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Zurn P121-DOME-CI Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
TOP-SET
®
ADJUSTABLE EXTENSION ASSEMBLY
INSTALLATION INSTRUCTIONS
ZURN INDUSTRIES, LLC.
SPECIFICATION DRAINAGE OPERATION
1801 Pittsburgh Ave.
Erie, PA 16514
Phone: 814/455-0921
Fax: 814/454-7929
World Wide Web: www.zurn.com
In Canada: ZURN INDUSTRIES LIMITED
3544 Nashua Drive
Mississauga, Ontario L4V1L2
Phone: 905/405-8272 Fax: 905/405-1292
Form # RD66 Date: 1/31/11 C.N. No. 120819 Rev. C
1. Create a square opening in roof (Q-deck) to receive drain assembly.
Opening sizes are: Z100 18” x 18”
Z101 24” x 24”
Z121 15” x 15”
Z125 11” x 11”
2. Fasten threaded rods into threaded holes in underside of drain body.
3. Fasten topside nuts and washers onto threaded rods, adjusting to desired elevation height.
Note: maximum recommended adjustment is 6 inches.
4. Insert threaded rod ends into holes on the deck plate and fasten with underside nuts and washers.
5. Fasten the assembly to the roof with self tapping screws. (provided by others)
6. Attach dome to clamp collar to complete assembly.
®
/