FMI C32TU, C32TO Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the FMI C32TU Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
For more information, visit www.fmiproducts.com
C32TU and C32TO
Corner Mantel and Base
ASSEMBLY AND INSTALLATION INSTRUCTIONS
IMPORTANT: Read entire instruction sheet be-
fore assembling or installing mantel kit.
These mantels are only approved for use with
any FMI PRODUCTS, LLC 32'' electric and gas
replace systems. Do not use mantel with any
other product.
• Thismantelkitcontainsthefollowing:
#1Base
#2RightSideAssembly
#3LeftSideAssembly
#4Header
#5Top
#6TopTriangle
#7TopLeftSupport
#8TopRightSupport
#9TopCenterSupport
#10BaseSupport
#11VerticalSupport
RightTopTrimStrip
LeftTopTrimStrip
• HardwarePackage
36-11/4"WoodScrews114325-01
8-1"FinishingNails114295-04
4-2"WoodScrews122447-01
*Extrahardwaremaybeincluded
Toolsrequired:
• PowerScrewdriverwith#2PhillipsBit
• Hammer
• NailSet
Ifanywoodpiecesaremissingordamaged,contactthedealer
whereyoupurchasedthismantelforreplacement.Ifhardware
is missing or damaged, contact FMI PRODUCTS, LLC at
1-866-328-4537 forreferral information. You can also visit
FMIPRODUCTS,LLC’swebsiteatwww.fmiproducts.com.
WARNING: Follow guidelines of paint or n-
ish manufacturer. Use care when nishing or
painting an unnished mantel (C32TU only). Do
not nish or paint mantel pieces near running
heater or open ame. These vapors are highly
ammable.
IMPORTANT:Ifyouarestaininganunnishedmantel(C32TU
only),removeanysawdust,dirtoroils.Thiswillpreventblem-
ishes from appearing under the stain. Stain mantelbefore
assemblingaccordingtomanufacturer’sinstructions.Apply
sandingsealer.
IMPORTANT:Ifyouarepaintinganunnishedmantel(C32TU
only),assemblemantelbeforepainting.Followdirectionslisted
onpaintforwoodproducts.Applybasecoatandtopcoatfol-
lowingdirectionslistedonproduct.
Note: Gather all mantel pieces together before assembling
mantel.
WARNING: Only use 1 1/4" screws to as-
semble mantel. Damage to mantel will result if
other screws are used for this purpose.
www.fmiproducts.com
123676-01C
2
ASSEMBLING MANTEL
IMPORTANT: More than one person is required
to lift assembled mantel. Lift mantel by leg
assemblies. Lifting by header or mantel top
could damage mantel.
Usethefollowingillustrationstoassemblemantel.Useonly
screwsprovided.
Figure 1 - Installing Base Support
Figure 3 - Installing Mantel Base
Figure 4 - Mantel Top Assembly
Figure 2 - Installing Header
1¼''Screws
BaseSupport#10
Base#1
IMPORTANT:Alignmantellefttorightonbasebeforeinstalling.
Cornerofmantellegsmustbeushwithbackofmantelbase
beforeinstallation(seeFigure5,page3).Useatapemeasure
toinsureaccuracy.
IMPORTANT:Use2"screwsonlyontopcentersupport.Using
2"screwsinanyotherlocationwilldamagemantel.
Header#4
RightLeg
Assembly#2
LeftLeg
Assembly#3
1¼''Screws
Headerinto
GrooveonLegs
LeftLeg
Assembly#3
1¼''Screws
Base#1
Header
Assembly
Block
RightLeg
Assembly#2
TopCenter
Support#9
MantelTop#5
TopLeft
Support#7
TopTriangle#6
TopRight
Support#8
2''Screws
1¼''Screws
www.fmiproducts.com
123676-01C
3
Figure 5 - Installing Mantel Top
Figure 6 - Installing Gas Fireplace
FIREPLACE INSTALLATION
1. Fireplace should be fully assembled. See Assembling
Fireplaceinreplaceowner’smanual.
2. Mantelmustbeinstalledushwithtwowalls.Remove
baseboardalongwallswheremantelistobeinstalled.
Baseboardwillpreventproperinstallationofmanteland
base.
3. Placemantelbaseclosetoinstallationlocation.Seere-
placeownersmanualforinstallationclearances.Leave
enoughroomtoinsertreplacefrombackofmantel.
4. Ifinstallinggasreplace,installgasline.SeeConnecting
to Gas Supplyinreplaceowner’smanual.Rememberto
leaveaccesstogasshutoffvalvesomewhereonmantel
baseorwhereitisaccessibletouser.Checkforleaks.
See Checking Gas Connections in replace owner’s
manual.
5. Position replace inside mantel through back opening
(seeFigure6).Carefullypositiongaslinesifapplicable.
IMPORTANT:Usecautionwhenpositioningreplaceon
base.Basemayscratcheasily.Makesurereplaceisin
properpositionwithinmantelopeningbeforecontinuing
withinstallation.
6. Gas replace with louver door: Lower bottom louver
door.Usetwoscrewsprovidedinreplacehardwarekit
andattachreplacetowoodenbase.Closelouverdoor.
Gas replace with xed louver:Beforeinstallinglogs
orburnerassembly(seeowner’smanual)removescrews
securingoortoassembly.Liftoorforaccesstobot-
tomofreplace. Usetwoscrews providedin replace
hardwarekitandattachreplacebasetowoodenbase.
Reinstalloorwithscrewsremovedpreviously.
MantelTop
Assembly
Assembly
Blocks
Assembly
Blocks
Corner
ofMantel
LegsMust
beFlush
withedge
ofMantel
Top
Mantel
LegsFlush
withMantel
Base
1¼''
Screws
IMPORTANT:Alignmanteltoplefttorightbeforeinstalling.
Backcornerofmantellegmustbeushwithedgeofmantel
topbeforeinstallation.
IMPORTANT:Ifinstallingagasreplace,verticalsupportwill
beinstalledtomantelassemblyaftergasreplacehasbeen
installed.Ifinstallingelectricreplace,rstinstallverticalsup-
portandinstallreplacefromfrontofmantel.Donotputany
weightonmanteltopuntilverticalsupporthasbeeninstalled.
123676-01
Rev.C
09/11
2701S.HarborBlvd.
SantaAna,CA92704
1-866-328-4537
www.fmiproducts.com
ELECTRIC FIREPLACE INSTALLATION
ThismantelcanbeusedwithFMIPRODUCTS,LLCelectric
replaces.Electricreplacesinstallfromthefrontofmantel.
Toinstallelectricreplaceseereplaceinstructionmanual.
Vertical Support Installation
Installverticalsupport(seeFigure7).
MANTEL INSTALLATION
1. Carefullypush mantelandbaseintopositionincorner
andushagainstbothwalls.Checkoperationofreplace
beforeproceeding.
2. Placerighttrimstriponrightsideoftopandlefttrimonleft
sideoftop.Alignbothpiecessoanygapsbetweenmantel
andwallarecoveredaswellaspossibleandfrontoftrim
stripsareushwithsideoftop.Withonepersonholding
trimstripsinplace,naileachstriptomantleusingnishing
nailsincludedinhardwarekitandnailset.
Figure 7 - Installing Vertical Support
Figure 8 - Installing Mantel Trim
BaseSupport#10
Vertical
Support
#11
1¼''Screws
1¼''Screws
Top
Center
Support
FinishingNails
TrimStrips
/