Gibraltar Building Products ADE12-WH Operating instructions

Type
Operating instructions

This manual is also suitable for

EAVE
RAKE
ROOF EDGE ROOF EDGE
PRE-DRILL HOLES
ALUMINUM ROOF EDGE
INSTALLATION GUIDELINES
These installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed professional,
and to check with your local building inspector or building permit office for approvals and possible variations that may apply.
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
• Begin installation along the eaves, starting at a corner and working your way around,
overlapping each succeeding piece of drip edge by 2-3 inches.
• After the eave drip edge has been installed, apply the underlayment and/or ice-water
barrier.
• Once the underlayment has been installed, apply the drip edge to the rakes. Make box
corners by wrapping the rake edge around the eave metal.
• Depending on local building codes and wind conditions, roof edge should be nailed
every 16 in. - 24 in.
• Aluminum expands and contracts with temperature changes. Failure to allow movement
can result in bulging or buckling when the temperature changes.
• Drill oversized nail holes and do not nail too tightly. Nail roof edge into place using
painted aluminum trim nails. Nails should penetrate the wood a minimum of 3/4"
1/32"
Over Driven
  • Page 1 1

Gibraltar Building Products ADE12-WH Operating instructions

Type
Operating instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI