12
CALIBRATION PROCEDUR
Calibratin
the Sender unit and Receiver uni
1.
ake sure DIP switch
on both the
ender unit and the Receiver unit are in
the
FF position
see pa
es 9 and 11
.
2.
onnect one end o
the
ber cable to the
ender unit.
onnect the other
n
th
r
l
t
th
R
iv
r
nit.
.
onnect the 5V D
Lockin
Power
upplies to the
ender unit and the
eceiver unit. Do not overti
hten the lockin
connectors. Plu
the power
r
int
n
v
il
l
l
tri
l
tl
t.
The LED indicators on both the
ender unit and Receiver unit will alternate
rom
ed to
reen durin
the calibration process. The calibration process can take up
to 120 seconds to complete.
A
ter the calibration process has
nished, the LED indicators on both the
ender
nit and the Receiver unit will turn solid
reen.
et DIP switch 3 to the
osition on both the
ender unit and the Receiver unit to lock the calibration set-
tin
s.
roubleshootin
•I
the
ender unit and Receiver unit did not complete the calibration process,
the indicator LEDs on both
ender unit and Receiver unit will be red.
heck
the
ber connections care
ull
and c
cle the power on both the
ender unit
and the Receiver unit and repeat the calibration procedure.
• When the indicator LED at one unit is
REEN and the other is RED,
cle power on the unit with the RED indicator. It is also recommended to
cle power on both the
ender unit and the Receiver unit to per
orm a
ull
li
r
ti
n.
•I
the calibration procedure continues to
ail, contact
e
en Technical
upport under the Askin
For Assistanc
section at the be
innin
o
this
n
l.
IMPORTANT: Be
ore be
innin
the calibration process, make sure that
the
ender unit and Receiver are no
powere
NOTE: I
the
ber optic cable is chan
ed,
ollow steps 1 - 3 to repeat the
alibration procedure.