FCS-24012-24S-6S3

Flow Wall FCS-24012-24S-6S3 Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Flow Wall FCS-24012-24S-6S3 Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Assembly Instructions
visit:
12” -24”
18”
LEVEL LINE
FIND STUDS
LEVEL LINE
LEVEL LINE
3A
2A
1A
3B
2B
1B
STUD LOCATION
1. Locate Studs / Level Line
(recommended creating guide lines) (recommended 8 screws per 4’ panel)
4. Horizontally Mounting
(use dowels to connect boards )
5. Vertical Mounting
(overlap boards)
6. Attatching End Caps
(Left Edge start from bottom / Right Edge start from top)
Orientation Options
(Using 6 Boards)
2. Align Board to Studs and Level Line
3. Mount Board to Studs
(recommended 12 - FLOW 2” Screws)
1775 W 2300S
Salt Lake City, UT 84119
(877) FLOWWALL - (877) 356-9925
register your purchase so we can keep you updated with all of our new
products and special offers.
Stud Locations
16”
Stud Locations
16”
Stud Locations
16”
/