Flow Wall FCS-12012-7BSC Operating instructions

Type
Operating instructions
Assembly Instructions
visit:
12” -24”
18”
LEVEL LINE
FIND STUDS
LEVEL LINE
LEVEL LINE
3A
2A
1A
3B
2B
1B
STUD LOCATION
1. Locate Studs / Level Line
(recommended creating guide lines) (recommended 8 screws per 4’ panel)
4. Horizontally Mounting
(use dowels to connect boards )
5. Vertical Mounting
(overlap boards)
6. Attatching End Caps
(Left Edge start from bottom / Right Edge start from top)
Orientation Options
(Using 6 Boards)
2. Align Board to Studs and Level Line
3. Mount Board to Studs
(recommended 12 - FLOW 2” Screws)
1775 W 2300S
Salt Lake City, UT 84119
(877) FLOWWALL - (877) 356-9925
register your purchase so we can keep you updated with all of our new
products and special offers.
Stud Locations
16”
Stud Locations
16”
Stud Locations
16”
  • Page 1 1

Flow Wall FCS-12012-7BSC Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI