Insllion
• Lef Eer Srem Hood cover
• Lef Eer Srem body
• Lef Eer Srem screen
• Tpe mesure
• Mrker pen
• Sw
WHAT’S IN THE BOX?
WHAT’S IN THE BOX? TOOLS/MATERIALS YOU MAY REQUIRE LEAF EATER STREAM WITH THE HOOD INSTALLATION
FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4
1. Loce he posiion which you wn o insll your Lef Eer Srem rin hed. This
my be direcly under your guer/eve or mid-wy down your vericl downpipes.
Wherever you choose o insll i, your Lef Eer Srem rin hed mus be minimum
of 500mm bove your nk inle nd nk overlow pipe. Also noe h if you’re inslling
Lef Eer Srem wih The Hood, you will need o choose n insllion locion h
llows you o perform more frequen minennce.
2. Cu your downpipe where you wn he boom oule of he Lef Eer Srem rin hed o
si. Cu he upper secion of pipe bou 300mm bove he irs cu (Figure 1). Ensure ll cu
edges re clen nd smooh.
3. Remove he cover from your Lef Eer Srem nd slide i up he op pipe, holding i in
posiion (Figure 2).
4. Wih he oher hnd, i he Lef Eer Srem body ono he lower secion of pipe,
ensuring he oule is seed irmly ino posiion (Figure 3).
5. Slide he cover bck down he op pipe nd lower he boom skir ino he corresponding
chnnel beween he screen nd body (Figure 4).
6. If desired, you cn pin your rin hed o mch your downpipes nd/or building.
HOW IT WORKS
The Hood elimines splshing for mximum rinwer cchmen, while keeping pess nd
leves from your sysem wih is 955 micron mesh screen.