A. For masonry
installation (X5)
B. For wood
installation (X5)
(x5)
(x5)
(x1)
M8x60 (x5)
M8x25 (x5)
ST4.2x25 (x2)
(x2)
(x2)
(x2)
(x2)
(x2)
(x1)
5
/
16
”
4
3
/
4
”
4
3
/
4
”
3
/
8
”
5
/
16
”
5
/
16
”
H + 1
11
/
16
”
H + 1
11
/
16
”
17
23
/
32
”17
23
/
32
”17
23
/
32
”17
23
/
32
”
17
23
/
32
”
17
23
/
32
”
17
23
/
32
”
17
23
/
32
”
78
3
/
4
”
Attach anti jump discs to top of the door (at least 1 inch
from rollers), rotate them toward the front of the door.
Prepare the door by drilling the holes and attaching
the rollers as indicated.
Install the rail using the screws, washers and spacers
provided.
a. Using a pencil, mark
a line at the correct height
(H+1-5/8), ensuring it is level
b.b. Use a stud finder to locate
the studs behind the drywall.
(NOTE: If you cannot find
studs where the drill holes
will go, a header board is
recommended)
c.c. Mark and pre-drill holes in
the studs along the line
Determine the location on the wall for the rail, and
use a LEVEL(!) to mark and pre-drill holes.
=
Door
Height
Barn Door Installation Manual
IMPORTANT: Before you begin the installation of your barn door, please read through ALL of the manufacturer’s instructions.
Failure to follow the proper installation procedures could result in the denial of warranty claims for any operational performance issues.