MA-21/18-BKM

Allied Brass MA-21/18-BKM Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Allied Brass MA-21/18-BKM Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
18,24,30,36
.
0.72
Mounting Hole
O
PERSPECTIVE
Mounting Bracket
Mounting Screw
Set Screw
MA-21 UNIT
Step 1:
Determine your desired location for installation and make a mark for the location of the mounting bracket. Make 4 marks
where mounting screws will be placed as shown below. Make sure unit is level when marking for location of installation.
Drill hole at each end of the marks.
Drill holes in Wall for Mounting Screw
Attach unit to mounting Surface
Step 2:
Screw down mounting bracket to wall. Then Insert unit to mounting brackets and then lock unit by set screw.
MA-21
INSTALLATION INSTRUCTIONS
No portion of this document or any artwork contained herein should reproduced in any way without the written conset of ALLIED BRASS INC.
/