7'POST

Feiss 7'POST Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Feiss 7'POST Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
M U R R A Y F E I S S
ASSEMBLY INSTRUCTIONS FOR POST BASE:
(E) 09/01
Flat head
machine
screw
(3)
Post (not
included)
(NOTE: Must
use Murray
Feiss fluted
post only)
Post Base
Cover
Allen
Headless
Screw (3)
Hex Key
IMPORTANT: This decorative slip-on post base
is designed to only fit Murray Feiss fluted post.
Carefully unpack and identify all parts before
beginning assembly. Post not included.
1. After post (not included) has been fixed onto
ground and before installing any lantern, slip down
post base thru post.
2. Slip down cover thru post.
3. Lock cover onto post base by fastening with
enclosed flat head machine screws.
4. Lock assembled post base onto post by fastening
with enclosed allen headless screws. Use hex key
to tighten screws.
© FEISS INDUSTRIES
/