3. BEFORE USE
Prior to each use conduct a visual inspection checking for abnormal conditions, such as cracked welds, leaks, and damaged,
loose, or missing parts.
Prior to first use bleed the hydraulic system to eliminate any air that may have entered during shipping.
Bleeding Hydraulic System:
1.
Leave the pump for 1 hour to allow the oil to settle before bleeding the system. Note: Failure to allow sufficient time
for oil to settle could result in air remaining in the oil. In this event, the pump will not bleed completely requiring a
second bleed of the system.
2.
Bleed the hydraulic circuit to eliminate any air in the system by opening the release valve and pumping the pump
handle 15 to 20 times.
3.
Test the lift, unladen, by raising the lift to full height and then lowering. Open the release valve slowly to control the
rate of descent.
4.
INSPECTION
•
Prior to each use conduct a visual inspection checking for abnormal conditions, such as cracked welds, leaks, and
damaged, loose, or missing parts.
•
The crane shall always be maintained in accordance with the maintenance instructions. No alterations or modifications
shall be made to this utility crane.
•
Inspections shall be performed in accordance with this owner’s manual.
•
The utility crane must be inspected immediately if it is believed to have been subjected to abnormal load or shock.
•
Owners and /or operators should be aware that repair of this product may require specialised equipment and
knowledge (refer to maintenance section).
5.
OPERATION
Lifting a load using a crane can be dangerous. Follow all instructions and precautions below.
WARNING:
DO NOT lift any products with the vehicle engine running.
ALWAYS ensure the handbrake is engaged on the vehicle before making any adjustments.
NEVER work on a load suspended by the crane
NEVER place any part of your body under the suspended load.
CAUTION: Make sure the ground is clear and no obstacles are in the path of the crane.
•
With the boom (2) lowered to the same height as the load, rotate crane into position over the load to be lifted. Fit the
pump handle (8) to the pressure release valve (11) (Fig. 9) and twist completely clockwise to close the valve (do not
over tighten).
•
Place pump handle (8) into the pump actuator (12) and slowly pump handle until the boom begins to raise.
•
Attach the hook and chain (1) to the sling, chain or load levelling device (not included) making sure the device is
securely attached to the load and is suitably rated to hold the weight.
•
Slowly pump the handle until the crane begins to support the load being lifted. Double check the load being lifted is
firmly supported by the crane, chain, sling or levelling device.
•
Pump the pump handle (8) to raise the working load to the desired height.
•
Using the rotation handle (10) slowly swing the load to the desired lowering location.
•
Note: Never leave the load suspended for long periods of time, as soon as practicable the load should be lowered.
•
Fit the handle of the hydraulic pump (6) to the pressure release valve (11) and slowly twist anti-clockwise until load
begins to lower (Do not loosen any more than 2 full rotations). Excessive speed or jerky motion can cause the load to
slip leading to property damage or personal injury.
CAUTION: This product is intended for lifting purpose only, not for supporting loads.
Promptly support and secure the load immediately after lifting.
DO NOT overload this crane beyond its rated capacity.