Mighty Mule R4983 Installation guide

Type
Installation guide

This manual is also suitable for

Adjustable pad mount hardware for the MM-LPS13
Printed in China for Gates That Open, LLC ©2013 GTO
R4984
REV 05.15.13
R4984 Adjustable Pad
Mount Adapter Plate
INSTALLATION MANUAL
For more information on Mighty Mules full line of automatic gate operators and
access controls visit our website at www.mightymule.com.
GTO Technical Service 8:00am–7:00pm (EST) • Monday–Friday
1-800-543-1236 or (850) 575-0176 • Fax (850) 575-8912
, LLC
®
2 R4984 Pad Mount Adapter Installation Manual
rev 05.15.13
Existing Concrete Pad
3” from string to top of
adjustable pad mount
9” Min
13” Max
String
1
3
/
16
Center adjustable pad mount
beween gate support posts
Gate Support
Post
Gate Support
Post
String
Adjustable
pad mount
(TOP)
Step 1
Find the center between the two roller/gate support posts. This should coincide with the position of the
center point of the operator
Figs A and B show where to locate the adjustable pad mount adapter in relation to the string and gate
support posts.
Be sure that you have a minimum of 9” from the string to the concrete slab (13” max). Mark hole
locations on concrete slab.
It is crucial that the top of the adjustable pad mount adapter is level and exactly 3” below the string.
Existing Concrete Pad
3” from string to top of
adjustable pad mount
9” Min
13” Max
String
1
3
/
16
Center adjustable pad mount
beween gate support posts
Gate Support
Post
Gate Support
Post
String
Adjustable
pad mount
(TOP)
A
B
ADJUSTABLE PAD MOUNT ADAPTER INSTALLATION
R4984 Pad Mount Adapter Installation Manual 3
rev 05.15.13
Step 2
Drill four (4) holes in concrete for anchor bolts. Install anchor
bolts. Align adjustable pad mount on anchor bolts and
tighten with wrench.
Step 3
Install adjustable pad mount top with supplied
hardware adjusting height to achieve the 3”
required from the top of the adjustable pad
mount to the string.
Tighten with wrench.
Step 4
Align operator with mounting holes on
adjustable pad mount. Check level
Assemble the hex bolts, washers and nuts.
Tighten with wrench.
Anchor
Bolts
Concrete
Pad
Concrete
Pad
Assemble 3
mounting brackets
(as shown) for
operator cover
before installing
on mount adapter.
Use 3/8” at
washers
to level
operator.
String
3”
Gates That Open, LLC • 3121 Hartseld Road • Tallahassee, Florida 32303
www.mightymule.com
For online Technical Support visit the Online Troubleshooter Wizard 24 hrs/day 7 days/week at
http://support.gtoinc.com/support/troubleshooter.aspx and open a Tech Ticket
Technical Support Hours: MON - FRI 8:00AM - 7:00PM (EST)
1-800-543-1236
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Mighty Mule R4983 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI