Frick Coalescer Installation guide

Type
Installation guide
Proper Installation
1. Orientate the 531B0104H0_ Coalescing Element with
the DRAIN DOWN tag on the bottom, at the 6 o’clock
position, to ensure the internal bridge is properly
oriented. Failure to orient correctly may result in ow
bypassing the coalescing element.
2. The required mounting torque is 21 ftlb. Excessive
torque may damage the element and result in oil
carryover.
JOHNSON CONTROLS
100 CV Avenue
Waynesboro, PA 17268
Phone: 717-762-2121 • FAX: 717-762-8624
www.johnsoncontrols.com/frick
Form 160.120-IB (2020-10)
Supersedes: Nothing
Subject to change without notice
Published in USA • 10/20 PDF
© 2020 Johnson Controls - ALL RIGHTS RESERVED
NOTICE
These elements are ONLY for
horizontal applications
.
Original Equipment
For Genuine FRICK®
Replacement Parts, contact:
Johnson Controls Inc.
FRICK Parts Center
9104-D Yellow Brick Road
Baltimore MD 21237
Phone: (800) 336-7264
CAUTION
Improper drain position
decreases performance.
Form 160.120-IB (OCT 2020)
INSTALLATION BULLETIN
File: SERVICE MANUAL - Section 70
Replaces: NOTHING
Dist: 3, 3a, 3b, 3c
Part numbers: 531B0104H01, 531B0104H03,
531B0104H05
Description: High efciency/high performance
coalescer element
FRICK Coalescer
  • Page 1 1

Frick Coalescer Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI