1) Please read these instrucons carefully before commencing any work
2) Please retain these instrucons for future reference
3) This unit must be installed by a qualied electrician in accordance with the IEE wiring regulaons and building regulaons
4) To prevent electrocuon switch the power o at the mains supply before installing or maintaining this ng
5) Ensure others cannot restore the electrical supply without your knowledge
IMPORTANT—Please read prior to installaon
CONTENTS & TOOLS REQUIRED
Thank you for purchasing this SycamoreLED.com product.
Please make sure instrucons are followed carefully prior to and during installaon and product is not altered, otherwise warranty may not be valid. For
technical support or warranty informaon please visit www.sycamoreLED.com, or call our dedicated technical helpline +44 (0) 113 2866686.
INSTALLATION INSTRUCTIONS
A
CONTENTS & TOOLS REQUIRED
This product is IP44 rated and is suitable for installaon in
Zone 1, 2 & Outside Zones
BATHROOM REGULATIONS
Installaon instrucons :
SY9110 Nara Pebble Tunable LED Mirror
B
1 x mirror
+
A