716478

SCHULLER 716478 User manual

  • I've reviewed the assembly instructions for the Schuller ceiling lamp model 716478 and I'm prepared to answer your questions. This document provides detailed steps for installing the lamp, including the use of special screws and notes that the gold leaf application is handcrafted, which may result in slight imperfections. I am ready to help with any queries you might have.
  • What does Schuller recommend for installation?
    What should I know about the gold leaf?
    How can I get additional product information?
INSTRUCCIONES DE MONTAJE
ARTÍCULO 716478
1
2
3
4
5
A
TENCIÓN: Schuller recomienda la utilización de balancines suministrados en la instalación de este plafón.
6
LA APLICACIÓN DEL PAN DE ORO ES UN TRABAJO
TOTALMENTE ARTESANAL, PERMITE LIGERAS
IMPERFECCIONES EN LA SUPERFICIE DECORADA
ACEPTADAS POR NUESTRO CONTROL DE CALIDAD.
Para ver la ficha técnica de
p
roducto com
p
leta
,
p
uede usar el si
g
uiente códi
g
o QR:
Para cualquier duda técnica pongase en contacto con nuestro Departamento Técnico.
Estamos a su servicio en nuestro email [email protected] o en nuestro teléfono 961 601 051 Ext. 229 Rev.11.21
ASSEMBLING INSTRUCTIONS
ITEM 716478
1
2
3
4
5
CAUTION: Schuller recommend to use included special screws when installing this ceiling lamp.
6
GOLD LEAF APPLICATION IS A ENTIRELY
HANDCRAFT WORK, SLIGHT IMPERFECTIONS ON
THE DECORATED SURFACE MAY BE ACCEPTED
BY OUR QUALITY CONTROL.
Y
ou ma
y
use the followin
g
QR code to view the com
p
lete technical data sheet of the
p
roduct:
If you have any technical questions, please do not hesitate to contact our technical Department.
We are at your disposal in our email: [email protected] Rev.11.21
/