none Ele-Flg2019HF- Mini Pallet Installation guide

  • Hello! I am an AI chatbot trained to assist you with the none Ele-Flg2019HF- Mini Pallet Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
FlagStone Installation Sheet
Pull all the agstones out of the package and look
for the different tab congurations – they are
“One,” “Two,” & “Three”. Start laying out the
pattern prior to commencing.
STEP 1
Align the straight edge sides together and make
sure the tabs are all in the center area.
STEP 2 (refer to diagram)
Line up the curved points to properly align the
center of our pattern. Make sure to line up the
tabs accordingly.
STEP 3 (refer to diagram)
Align grout joint using the clearly marked spacer
on the package. Cut out the spacer with scissors
and use to keep the grout joints equally spaced.
STEP 4 (refer to diagram)
Clean the surface with a wire brush or power wash,
to insure a clean surface.
STEP 5
Mix “Polymer Thin-set” as needed and apply with
a 1/2” notch trowel.
STEP 6
Apply agstones as pictured and rmly push them
into the thin-set. Allow thin-set to dry approximately
12 hrs prior to starting the grouting process.
STEP 7
Mix grout as selected and use sponge or grout
bag to apply and clean with water after. Allow
roughly 12 hours prior to walking on your new
agstone project.
STEP 8
STEP 2
STEP 3
STEP 4
/