specifications and
installation instructions
Model 1000--FS page 10 of 16
®
JARVIS
6207001::::
PRODUCTS CORPORATION
33 ANDERSON ROAD, MIDDLETOWN, CONNECTICUT 06457--4926
TEL. 860--347--7271 FAX. 860--347--6978 WWW.jarvisproducts.com
SPECIFICATIONS
Model 1000--FS
Motor Power 7 hp 5220 W
Blade Speed at 7.6 gpm or 28.8 Lpm 2150 rpm
Control Handles dual anti--tie down / electric
Blade Diameter 9.0 in 229 mm
10.5 in 267 mm
12.0 in 305 mm
Cutting Depth
with9inchblade 3.0in 76mm
with 10.5 inch blade 3.75 in 95 mm
with 12 inch blade 4.5 in 114 mm
Overall Length (12.0 inch bl.) 26 in 660 mm
Weight 41 lbs 18.6 kg
Vibration less than (<) 128 dB < 2.5 m/sec2
Noise (one meter from tool) 88 dB
Hydraulic Power Unit
Motor Power 10 hp 7457 W
Operating Voltage 460/230 V 3 ph, 60 Hz
other voltages and 50 Hz available
Hose Length 16 ft 5 m
Flow Rate 7.6 gal/min 28.8 L/min
Oil Capacity 30 gal 114 L
Oil Visc. at 100°F/40°C 200 SUS 46 ISO
Overall Dimensions (lxwxh) 37.6 x 27.2 x 31.5 in
955 x 691 x 800 mm
Weight (without oil) 408 lb 185 kg
INSTALLATION INSTRUCTIONS
ALWAYS DISCONNECT THE HYDRAULIC HOSES
AND SHUT THE POWER OFF IN ACCORDANCE
WITH OSHA’S LOCKOUT/TAGOUT PROCE-
DURES (29 CFR 1910.147) BEFORE PERFORM-
ING ANY REPAIRS OR MAINTENANCE.
Refer to Figures A and B on pages 4 and 5 for referenced
items unless otherwise noted. Use Figure E on page 8
and Figure 1 on page 11 as a guide for wiring and hose
connections to the hydraulic power unit.
1 Install the hydraulic power unit overhead or on the
floor behind the work station.
1.1 Avoid excessive height and long pipe runs.
1.2 Locate the equipment in a clean, dry work area
and provide adequate space on all sides of the
unit for maintenance access to all components.
2 Remove filler breather cap (item 9, Figure E, page 8)
and fill the power unit oil reservoir with a USDA ap-
proved premium grade hydraulic fluid (viscosity in-
dex 200 SUS at 100°F/46ISOat40°C). Never run
the power unit without oil.
3 Install the balancer, Jarvis part number 4042035,
above the work station.
3.1 If the operator has to move with the chain line,
install the balancer on a trolley. The trolley
should have sufficient travel to allow the opera-
tor to reach the entire work area.
4 Suspend the 1000--FS from the balancer.
4.1 Adjust the balancer to the operators preference.
5 Make all necessary wiring connections. All wiring
must be done in accordance with national, state
and local electrical codes. Refer to wiring diagram
inside the electrical control box cover (item 10, Fig-
ure F, page 9).
5.1 Domestic power units require three--phase, 60
hertz, 460/230 volts to the motor and single--
phase, 115 volts to the electrical control box.
Check the wiring diagram inside the cover of
your electrical control box to see if other volt-
ages and frequencies apply (item 10, Figure F,
page 9).
5.2 Equip the power unit with a switch at the opera-
tor’s station to facilitate shut down in case of
equipment failure.
5.3 Plug the wire and plug assembly (item 72) on the
1000--FS saw into the twist lock plug outlet
(item 17, Figure F, page 9) on the electrical con-
trol box.
6 Make all necessary hose connections. Connect the
hydraulic pressure and return lines.
6.1 Connect the quick connect socket (item 82) on
the 1000--FS saw to the return line quick connect
plug (item 25, Figure E, page 8) of the power
unit. Connect the the pressure line quick con-
nect socket (item 24, Figure E, page 8) on the
power unit, to the quick connect plug (item 80)
on the 1000--FS saw.