Vi. Operation steps:
1. Turn on the 220V power supply, close the power switch, and the power voltmeter displays the
current input voltage, cold But the fan starts up, delay for 3 seconds (that is, after the "dia" of a long
call), the main circuit works, the conveyor starts
Move, press the induction switch to enter the sealing debugging work.
Caution: do not turn on or off the power switch continuously and quickly!! Turn off the power switch
for at least 5 seconds After the clock (such as the ammeter on the operation panel disappear), can
re-open the power supply, otherwise easy to damage the Settings Backup main circuit.
2. Adjust the gap between the bottom of the induction head and the top plane of the sealing object
according to the height and size of the sealing object Width of distance (about 2-5mm) and guide rail
(sealing center should be aligned with induction head center, otherwise To cause partial imprison to
pass through.
3. Preliminarily adjust the feeding speed of sealing according to the size of sealing port. Such as
diameter is Small, its spacing should be small, the transmission speed should slow, conversely, when
the aperture increases, it should increase its spacing or Speed up the conveyance properly.
4. Close the induction switch and put on the aluminum foil induction film (aluminum foil face relative
to the bottle mouth, paper pad)Face to cover. Test sealing can be carried out by placing the sealed
material which has been tightened on the conveyor belt
6 the spacing and conveying speed shall be adjusted at point 2 and 3 when the bottle comes out from
the other end of the conveyor belt After that, unscrew the cap and check the sealing quality until it
meets the sealing quality Continuous automatic sealing work.
5. In order to ensure that the sealing value is in the best working state, the best should be found
through the sealing process test Process parameters and record. After the debugging, in normal
production should be prevented by mistake change, and should be often used by hand
Check whether the sealing surface has been heated. If there is no heat on the surface, stop immediately
Check and find out the reason, so as to avoid mass production of products without induction heating
sealing and products that have been heated by sealing The goods were mixed together.
6. When the working current is greater than 5A, the machine over-current protection function starts
and the transmission stops automatically.At this point, the distance between the sensor head and the
enclosure should be increased to reduce the working current, and then the reset switch should be
pressed Start the induction switch again and adjust it again before sealing.
7. When the temperature of the main circuit of the equipment is too high, the overheating protection
function is started and the equipment stops working automatically When the temperature drops to
normal, the device will start sealing automatically.