Zurn ZS880 Series Installation guide

Type
Installation guide
Dimensional Data (inches and [ mm ]) are Subject to Manufacturing Tolerances and Change Without Notice
®
ZS880
LINEAR SHOWER DRAIN CONNECTOR INSTALLATION INSTRUCTIONS
Zurn Industries, LLC | Light Commercial Plumbing Products
1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
In Canada | Zurn Industries Limited
3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292
www.zurn.com
Rev. A
Date: 4/24/2018
C.N. No. 139950
Form # FT1015 Sheet 1 of 2
Installing and Adjusting the Anchoring Legs
Each shower drain is provided standard with two preassembled anchoring legs, one on each end of the channel.
The connecting anchoring leg replaces two of the preassembled anchoring legs where the channels are set to connect.
STEP 1: Remove the
preassembled anchoring legs
at the ends of channels that
are being connected.
STEP 2: Install the connecting
anchoring leg.
STEP 3: Install the washers
and screws into the channel
end caps.
STEP 4: Adjust the height of
the anchoring leg.
STEP 5: Tighten screws to
secure the leg in place.
The anchoring leg is to be installed on the inside of
both connecting channel end caps.
Loosley install the screws, allowing the anchoring
leg to slide up and down freely against the channel
end caps. Note: The screws are installed from
underneath the shower channel.
Set the location of the anchor leg to correspond
with the required subfloor thickness height mea-
suring from the bottom underside of the anchor leg
to the top surface of the membrane flange on the
channel. Each slotted anchor leg has a vertical
adjustment range of 9/16 [14].
The anchor leg that is removed will no longer be
needed.
ZS880-C45
ZS880-CS
ZS880-C90
WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
ADVERTENCIA: ncer y daño reproductivo - www.P65Warnings.ca.gov
AVERTISSEMENT: Cancer et effets néfastes sur la reproduction - www.P65Warnings.ca.gov
Dimensional Data (inches and [ mm ]) are Subject to Manufacturing Tolerances and Change Without Notice
®
ZS880
LINEAR SHOWER DRAIN CONNECTOR INSTALLATION INSTRUCTIONS
Zurn Industries, LLC | Light Commercial Plumbing Products
1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
In Canada | Zurn Industries Limited
3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292
www.zurn.com
Rev. A
Date: 4/24/2018
C.N. No. 139950
Form # FT1015 Sheet 2 of 2
Installing the Channel Connector
STEP 12: Finished Floor Construction. Refer to ZS880 Linear Shower Drain Installation Instructions, Form # FT1009
STEP 13: Securing the Grate. Refer to ZS880 Linear Shower Drain Installation Instructions, Form # FT1009
STEP 8: Subfloor Construction. Refer to ZS880 Linear Shower Drain Installation Instructions, Form # FT1009
STEP 9: Adjusting the Tiling Frame. Refer to ZS880 Linear Shower Drain Installation Instructions, Form # FT1009
STEP 10: Apply thinset
to underside of the
channel connector.
Note: To prevent damage to the connector, it is
important to ensure that the underside of the
connector is completely supported by thinset.
STEP 11: Install and
secure the connector
to the adjacent channel
frames.
STEP 6: Attach the
channel outlet to the
drain pipe.
A shielded coupling shall be used to make this
connection. Ensure that the coupling clamps are
tightened before lagging the anchor legs down to
the base.
STEP 7: Lag the drain
to the base.
For convenience, the anchor leg is furnished with
four anchoring slots to lag the drain assembly
down to a base prior to construction of the
subfloor. Use at least two of the anchoring slots.
Thread the four provided screws through the
frame and into the connector, as shown.
  • Page 1 1
  • Page 2 2

Zurn ZS880 Series Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI