Required Tools; 225 Galaxy, 229 Galaxy Alignment Pins, 236 Mounting Wood
Screw, Dead Blow Hammer or 965 Galaxy Hammer, 919 Carbide Tipped Drill
5/16”, 911 Carbide Tipped Drill 1-1/4” Forstner Drill, 952 Pop Toggle, 920 Panel
Adjuster, 922 Vacuum Cup 8”, 1/32” Plastic Laminate, Contact Cement.
225 GALAXY, DIRECT TO SHEETROCK, ALIGNMENT
PINS, PANEL ALCOVE, INSTALLATION GUIDE
Layout the perimeter of the panels on the walls with a blue
chalk line. Confirm that the panel layout is workable with field
alignment, electrical and any other requirements.
When sent in a pre-assembled flat packed kit, the tools
required for customer installation are minimal.
225 Galaxy should be drilled about 2” off the panel corners to firmly
hold the panels. Drill the holes with a 911 Carbide Tipped Drill 1-1/4”,
Forstner Drill, 3/8” deep (in the field) or with a CNC (in the plant).
Tools required for installation only: 229 Galaxy Alignment Pins,
236 Mounting Wood Screw, 919 Carbide Tipped Drill 5/16”, 911
952 Pop Toggle, 1/32” Plastic Laminate, Contact Cement.
Install the 225 Galaxy using a Dead-Blow Hammer on a solid
work surface. The 224 Galaxy can be installed flush, allowing
the panels to be packed flat for shipping.
3 4
5 6
1 2
“Hidden Fastener Specialists” | www.starhanger.com
8