Ampex AMPEX2020FK Installation guide

Type
Installation guide

This manual is also suitable for

1 AUGUST 2019
www.amvicsystem.com
BUILD TO A HIGHER STANDARD
501 McNicoll Avenue Toronto, ON, CA, M2H 2E2
Toll Free: 1 (877) 470-9991 • Fax: (416) 759-7402
INSTALLATION MANUAL AMPEX
PRO0292
Before StarƟ ng the InstallaƟ on
The usable area of the Ampex panel is 24x48” (610x1219mm). Once the enƟ re area calculated from the drawings (in
Ō
2
), divide the total area by 8Ō
2
to get the number of panels required.
The total amount of concrete needed for a given slab can be calculated using Amvic’s quick online calculator that can
be found on the Ampex product page: hƩ ps://www.amvicsystem.com/products/ampex/.
It is important that the hydronics designer/specialist is aware that Ampex panels are designed around 3” (76mm)
increments.
Ensure that the base is smooth, compacted and at the correct elevaƟ on before panel installaƟ on.
Check to see if the local building code requires a dedicated vapor barrier which will need to be installed prior to placing
the panels.
It may be necessary to glue some of the panels, use construcƟ on adhesive that is compaƟ ble with foam insulaƟ on (e.g.
LePage PL®300 Foam Board Adhesive).
Panels are designed to securely lock the tubing in place allowing other trades to conƟ nue working on the panels
without running the risk of damaging or dislocaƟ ng the tubing.
InstallaƟ on
These general installaƟ on steps are applicable to Ampex panel installaƟ on for basements, slab on grade and exterior snow
melt applicaƟ ons.
Ampex Installation Manual
Step 1
Start from the far-leŌ corner and work from leŌ to right.
Lay down the rst panel so that the exposed interlock is
to the right side and forward (panels can be placed down
either along the length or width of the outer wall).
Step 2
ConƟ nue to lay the panels ensuring that they are properly
interlocked and are snug and aligned.
www.amvicsystem.com
BUILD TO A HIGHER STANDARD
PRO0292
INSTALLATION MANUAL AMPEX
Step 3
Start the next row with half a panel. This will stagger the
seams, creaƟ ng a running bond and ensuring that panels
are properly interlocked and aligned.
Step 4
ConƟ nue to lay the panels ensuring that they are properly
interlocked and are snug and aligned.
Step 5
Use the second half of the cut panel to nish the row.
Step 6
It may be necessary to cut the panels to accommodate
columns or walls.
Step 7
ConƟ nue to place the rows of panels maintaining a
staggered running bond layout.
Step 8
Install the PEX tubing by walking it into the nubs of the
panels according to the design layout.
  • Page 1 1
  • Page 2 2

Ampex AMPEX2020FK Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI