Allied Brass WP-GRS-16-PNI, WP-GRS-16-VB, WP-GRS-32-ORB, WP-GRS-32-PC, WP-GRS-32-SN Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Allied Brass WP-GRS-16-PNI Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
WALL
TIMBER STUD
1. Use a stud finder to accurately locate the center of the stud.
2. Remove Cap on end of post to allow opening for mounting screw.
3. Place Grab Bar on wall at desired mounting location and mark drill hole location
with pencil. Mark is made by inserting pencil through the end post and marking
location of small hole at bottom of post.
4. Drill 3/16" hole into the wall studs.
5. Mount and position end posts to the drilled holes.
6. Fasten the Grab Bar to mounting surface using #12 Pan Head Screw supplied
and tighten.
7. Replace Cap on posts.
Ø3/16" HOLE
WP-GRS
INSTALLATION INSTRUCTIONS (TIMBER STUD ONLY)
No portion of this document or any artwork contained herein should be reproduce anyway withouth the express written consent of ALLIED BRASS INC.
/