BRIO 99HSA Hybrid Self Draining Sill Installation guide

  • Hello! I am an AI chatbot trained to assist you with the BRIO 99HSA Hybrid Self Draining Sill Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1
99HSA-_20
99HSA-_30
99HSA-_40
99HSA-_60
Required Hardware anodizing color not specified
Preparing Wood Saddle and Rebate dimensions in mm[inches]
32.2[1.27]
99HSA Preparation
99HSA Self Draining Sill
Brio Australia
P: +61 2 87186718
W:
brio.com.au
Brio UK
P: +44 191 2291224
W:
briouk.com
Brio USA
P: +1 585 3195599
W:
briousa.com
INST99HSA1 REV B - MAY 2015
99HSA Aluminum Extrusion
2, 3, 4 and 6m lengths supplied
99EC End Caps
1 set supplied per kit
98P Polypropylene Channel
2, 3, 4, and 6m lengths supplied
Cutting Wood Saddle
Available kits:
JW = Jamb Width
PT = Panel Thickness
Cut to length = W
Cut to length = W+2(JT)-6[0.24]
Seal AQ21 can be purchased
from Brio for the full perimeter seal
Cut 99HSA & 98P to length = W+2(JT)-6[0.24]
W
JT
3[0.12]
W = Opening width between jambs
JT = Jamb Thickness
System Details
Xt and XT decided by installer - depend upon jamb
width JW and panel thickness PT
12
Assembled Sill
wood not
supplied
31.8
[1.25]
3.9
[0.15]
25.4
[1.00]
XT2
16.0[0.63]
6[0.24]
PT
JW
31.8[1.25]
T1
T2
126.0[4.96]
58.5[2.30]
T1
XT1
26.6[1.05]
12.0[0.47]
6.0[0.24]
2.7[0.11]
T2
Preparing Sill Base
Assembling Sill use construction adhesives and sealants where recommended
Drill Ø3[0.12] to match fixing holes
2
Insert 98P into 99HSA Drill hole Ø9.5[0.37]x90° at either end of sill for jamb fixings.
Fixing holes for wood T placed at 400[15.75] intervals (
2Ø9.5[0.37]x90°)
Apply adhesive to 99HSA’s grooves
and attach wood T2
Shape Jamb to match profile of 99HSA
Screw fix wood T to
99HSA
2
8G x 19[0.75] Screws Drill Ø3[0.12] to match jamb fixing holes
Attach 99EC - screws supplied
Attach jamb
to sill - apply
sealant to
screw heads
Frame can then
be fixed to
opening on-site
Wood T pinned in place last
1
Drill drainage hole through 98P and 99HS5A Ø8[0.32] at either end of the sill (position to avoid bottom pivot)
T1
T2
400
[15.75]
400
[15.75]
JT-6[0.24]
2
T fixings2
Jamb fixings
Ø9.5
[0.37]
90°
JT-6[0.24]
2
NON-PIVOT
END
PIVOT
END
JT+101[4.00]
Ø8[0.32]
Drainage
holes not to
pierce sill’s
underside
JT-3[0.12]
JW
XT +30[1.18]
2
81°
Ø3[0.12]
T2T2
Screw Flutes
/