BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are delivered pre-treated with a water based timber treatment
however this only helps to protect during transit of your garden item. To
validate your guarantee and for better protection against weathering it is
highly recommended that you treat the garden building with a wood preserver
within 3 months of assembly. This will need to be re-applied annually to ensure
longevity of your building. Care must be taken when constructing the garden
building that it is not touching the ground and is on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and
annual treatment.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly
smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a run o for water. It is also recommended
that the oor be at least 25mm above the surrounding ground level to avoid ooding.
For Assistance Please
Contact Customer Care on
01636 880514
2mm Drill bit
x2
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
This building should be erected by
two people.
For ease of assembly, it is advisable to
pilot drill all screw holes and ensure
all screw heads are countersunk.
Whilst all products manufactured at Walton Garden Buildings Limited are made to the highest standards of Safety and in the case of childrens products
independently tested to EN71 level, Walton Garden Buildings Limited cannot accept responsibility for your safety whilst erecting or using this product.
Length - 3638mm
Width - 2430mm
Height - 2282mm
Retain Instructions for future reference
Please retain product label (Attached to your building) for reference with all future contact
Before
commencing assembly
make sure you have a
suitable base ready to
erect your building
Fixing Kit
1480-95mm
(Facias)
x4
1652-55mm
(Corner/side Trims)
x6
Shed Diamond
Finial x2
7
10
Felt
01GRO1208DD-V1
Contents
Door Gable
1
Plain Gable
2
Window Panel x2
3
Plain Panel x2
5
6
Floor x2
Roof Panel
x4
7
Roof Truss
4
100-45mm
(Truss Support)
x2
8
9
10
11
12
120-27-45mm
(Facia Blocks)
x4
120-12-45mm
(Tower Bolt Blocks)
x1
1245-1449mm Horizontal Door Strip
1245-1732mm Vertical Door Strip x2
18
19
20
21
22
Master
Door
Slave
Door
T-Hinge
Nail Bag & Ironmongery Contents
Tower Bolt
Rim Lock
& Handle
15
13
17
Casement Stay
x2
14
114x30mm Screw
5x60mm Screw
20x40mm Screw
Felt Tacks x180
15x20mm Screw
50x50mm Screw
3x70mm Screw
8x30mm Black Screw
16
Assembly
Assembly
Fix the door strips onto the front
gable using 4x30mm screws for
each strip
12X30mm screws
Fix the T Hinges onto the doors
and door frame as shown
above. Ensure that each hinge
is 720mm apart and that there
is a 170mm gap from the top of
the door and the middle screw
of the T Hinge.
42x30mm screws
Pre Assembly
19
21
1
18
20
22
Step 1
Remove transportation blocks
from the bottom of each panel
before beginning assembly. Each
Panel should have two blocks.
Step 2
Place the floor on a firm and
level base, ensure base has
suitable drainage free from
areas where standing water can
collect. (See front page on base
requirements). Ensure floors
are flush to each other and fix
using 10x50mm screws.
Alternate fixing positions along
the length of the floors.
x10 50mm Screws
6
6
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and
annual treatment.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly
smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a run o for water. It is also recommended
that the oor be at least 25mm above the surrounding ground level to avoid ooding.
Step 3
Do not secure the building to
the floor until the roof is fitted.
Fix the panels onto the floor
using 50mm screws in align-
ment with the floor joists
Fix the corners with 50mm
screws as shown in diagram.
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides
x16 50mm Screws
2
Window panel can be fitted
on either left or right side
6
6
3
3
Step 4
Fix door gable and plain side
panels using same method
shown in step 3.
x22 50mm Screws
3
2
5
1
Step 5
2x 70mm Screws
4x 60mm Screws
4
5
2
3
1
7
Place the support block with the short side on
the panel with the edge lining up with your
pencil mark, use x4 60mm screws to attach.
Put both Roofs on the top of the building
and place the roof truss up against the roof
and mark where the truss nishes on the
sides.
Place the roof truss in the centre of the
support blocks and secure through the top
of the roof truss into the support block with
x2 70mm Screws.
10
Step 6
Fix the roof panels on either
side as shown in diagram.
Ensure roof framing fits into slot
at top between the gable top
rafters and the roof truss.
Fix panels into position using
30x 30mm screws from the top
of panel, straight into the rafter
and roof truss. Pre drill holes
before hand.
Ensure the larger over hang
on both panels are facing
each other at the top point.
40x 30mm Screws
5
1
4
4
4
4
10mm Felt Tags
100mm
intervals
50mm
Overhang
Cut felt into 4 sheets and lay
onto roof as shown in
diagram ensuring there is a
50mm overhang around the
sides.
Fix using felt tacks at 100mm
intervals
Step 7
5
1
12
4
4
Step 8
Use 30mm screws to fix
each cover trim.
18x 30mm Screws
1
4
5
9
9
9
Step 9
Use 40mm screws to fix
each fascia block, fascia
and Shed Diamond.
4
4
1
8
11
18x 40mm Screws
13
13
Step 10
Rim lock fixing
Fig 1. (internal view)
Place the lock onto internal
horizontal framing ensure
alignment with the pre
drilled holes before fixing.
Align Lock keep with lock
and fix with screws provided.
Do not over tighten the
screws, otherwise the
locking mechanism will not
work.
Fig 2.
Place door handle bar
through the lock as in
diagram, fix door handle
onto bar with the flat headed
grub screw.
fig 3. (External view)
Fir the door handle cover
over the bar and fix with
2x30mm screws provided. Fix
the door handle onto bar
with the flat headed grub
screw as in diagram.
Rim lock
Flat head
Grub Screw
2x30mm screw
2x30mm screws
Screws provided with lock
Do not over tighten the screws
15
Attach the mounting block to
top of the slave door with 2x30
screws. Align tower bolts onto
blocks and fix with 6x30mm
black screws .
Step 11
6x 30mm Black Screws
14
17
2x 40mm Screws
Step 12
Fix the casment stay (16) to
the opening window then
align the fixings onto the the
window panel frame. ensure
thecasement stay fits into
fixings when closed before
screwing them down using
x12 20mm screws.
6x20mm screws per casement stay
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6

Adley 01GRO1208DD-V1 User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI