Block PV-TS35M Operating instructions

  • Hello! I've reviewed the instructions for modifying and attaching the PV-TS35M metal fixture to selected PowerVision units. This document outlines the necessary steps for shearing off a metal bend and the process of attaching fixture to the unit. I'm ready to answer any questions you might have about these procedures or the specific PowerVision models mentioned.
  • What modification is required for the PV-TS35M fixture?
    Is this modification required for all units?
    What tools are recommended for shearing the metal bend?
    How many parts does the PV-TS35M fixture have before assembly?
Seite 1 +1508-0122 || Z790803001/a
Mandatory changes of PV-TS35M (Metal-Fixture for DIN-Rail Mounting) for selected POWER VISION Units only
To apply PV-TS35M to certain PowerVision units, the metal bend indicated below needs to be sheared off. This needs to be
done only for use with PowerVision units listed below. Please use suitable tools like a flat-plier. Please check exactly with draw-
ing, which metal bend needs to be sheared off.
POWER VISION Power Supplies POWER VISION Accessories
PVSE 230/24-5 and PVSE 230/24-5! PVUA 24/24-20
PVSE 230/24-10 and PVSE 220/24-10! PVUC 24/24-10 and PVUC 24/24-20
! = followed by any suffixes
Shear off only this metal bend
Drawing 1
Scale approx. 1:1
Attaching PV-TS35M to PowerVision Units
1. Remove screw cross-head screw (M3x5 incl. lock washer) and separate top and bottom part of fixture. Please keep screw
and washer for later usage.
2. Insert bottom part of PV-TS35M into guide slots in heat-sink of used PowerVision unit till its end (refer 1 at drawing 2)
3. Insert top part of PV-TS35M into guide slots in heat-sink from top-side of unit used till its end. Please notice that the exer-
tion is normal at the last 5mm ( refer 2 at drawing 2).
4. Finally use cross-head screw incl. lock washer to fix top and bottom again.
1
2
/