Conergy PE 305P Installation guide

Type
Installation guide
Conergy PH 245P - 270P
Solar Module | Installation Manual | UL Version
1. Introduction
1.1. About this installation manual
1.1.1. Subject of this manual
This installation manual describes the procedures for installation and electrical
connection of these solar modules in a grid-connected photovoltaic system.
Additional solar modules are installed with the same procedures.
1.1.2. User group
The manual is intended to be used by the system owner and by qualified
persons possessing technical skills and basic electrical, electronic and
mechanical knowledge related to photovoltaic systems. Please retain this
manual for future reference.
1.2. Standards and technical directives
The solar modules comply with the following standards:
ULc/ORD-C1703 & UL 1703
1.3. Intended use
The solar modules are designed for use in photovoltaic systems. Any other use
is considered improper use. These solar modules do not comply with the
technical regulations for overhead glazing and may not be used for such
applications. These solar modules are not intended for use in mobile
applications (e.g. vehicles) or marine applications (e.g. boats). Intended use
also includes compliance with the specifications stated in this installation
manual. Conergy shall not be held liable for damages arising from a failure to
observe and follow the installation manual, particularly the safety instructions
contained in it, or from any improper use of the product.
2. Safety
2.1. Responsibilities of the owner/operator
The system operator has safety-related responsibilities. He must ensure that:
| local codes and other applicable laws concerning required permitting as well
as installation & inspection requirements, rules and regulations are consulted
and followed;
| the installation is only carried out by qualified individuals with photovoltaic
specialist technical knowledge and basic knowledge of mechanical
engineering;
| the electrical connection is only established by qualified persons;
| Persons commissioned to perform the work can evaluate their assigned
tasks and recognize possible risks;
| those commissioned to perform the work are familiar with the system
components;
| the installation manual is made available during the installation;
| the installation manual, and in particular the safety instructions, have been
read and understood by the relevant personnel before installation;
| suitable lifting gear and tools are used for the installation;
| if replacements are required, only Conergy components are used and repairs
are only carried out by qualified technicians authorized by Conergy, as
otherwise the warranty will be voided;
| only components (cable, plugs, mounting parts, etc.) that are suitable for use
in photovoltaic systems are used;
| the solar module is not installed near highly flammable gases or vapors
because sparks could be generated;
| the solar modules are installed over a fireproof roof covering when installed
on a roof;
| artificially concentrated sunlight shall not be directed on the module or panel;
| the junction box and the cable are not exposed to direct sunlight for long
periods of time,
| the solar module is not in direct contact with water or exposed to moisture for
long periods of time,
| the solar module is not subjected to any extreme chemical loads (e.g.
emissions from production operations),
| the solar module is not subjected to mechanical loads higher than the
approved levels,
| the solar module is only used in the specified ambient temperature range,
| no paint, coatings or adhesives are applied to the solar module;
| the solar module is not dismantled and none of the parts provided on delivery
are removed.
| the solar modules are only transported in their original packaging.
2.2. Basic safety instructions
The following safety instructions and warnings form an essential part of this
installation manual and are of fundamental importance when handling this
product.
| Make allowance for the loads that these modules may generate for the entire
structure.
| To avoid damage (e.g. broken glass) do not leave solar modules unsecured.
| Check the mechanical integrity of the solar modules prior to installation. Only
use undamaged solar modules.
| Only use mounting systems recommended by Conergy that can withstand
the expected loads for snow, wind, etc.
| Make sure no other system components impair the mechanical or electrical
function of the solar modules.
| Only work in dry conditions with dry solar modules and dry tools.
| Do not drill any holes into the module frame or the glass surface and do not
perform any welding work on or in the direct vicinity of the solar module.
| To avoid burns do not touch solar modules under load without wearing
protective gear, i.e. insulating gloves, protective eyewear, etc.
| Never touch solar modules with cracked or broken cover glass or damaged
back sheets without wearing gloves.
| Comply with the applicable occupational health and safety regulations (e.g.
regarding protective clothing).
| Carry out the entire installation in the presence of a second person so that
assistance can be provided in case of an accident.
| Keep a copy of this installation manual in the immediate vicinity of the
system.
1.
Introduction
Installation Manual Conergy PH 245-270P 1
3. Installation
3.1. General installation instructions
| Make sure that all locally applicable standards, construction regulations and
accident prevention regulations are complied with.
| The modules must be installed in accordance with National Electrical Code
(NEC) in the US and in accordance with CSA C22.1, Safety Standard for
Electrical Installations, Canadian Electrical Code, Part I (CEC) in Canada.
| Only use mounting systems recommended by Conergy that can withstand
the expected loads for snow, wind, etc. The recommended minimum stand-
off height is 54 mm.
| Select an installation location with the maximum sunlight at all times of the
year. Avoid shaded areas. Damage to modules can occur when continuously
shaded.
| In northern latitudes, orient the solar modules to the south. Determine the
ideal setting angle according to the latitude of the installation location.
Request this information from your dealer or find it in the official tables.
| Always mount the solar modules with the same orientation and tilt angle.
Otherwise special consideration will need to be given to system design and
inverter selection.
| Maintain an adequate distance between adjacent solar modules to allow for
expansion in case of changing thermal conditions.
| Maintain an adequate distance between the solar module and the mounting
surface to ensure sufficient rear ventilation.
| The solar modules can be mounted both vertically and horizontally.
| You can find further installation instructions in the installation manual for the
respective mounting system.
| The solar modules may be bolted or clamped in place depending on the
design of the frame. The mounting system must be made from material that
is resistant to corrosion and atmospheric conditions and able to withstand the
loads required.
3.
Installation
Installation Manual Conergy PH 245-270P 2
3.2. Mounting solar modules on installation frame
The solar modules can be damaged if the proper procedure
is not followed!
| Secure the solar modules against slipping and falling.
| Do not drop the solar modules.
| Do not hold the solar module by its socket or connection
cables.
| Always grasp the solar modules simultaneously at two opposite
points on the module frame when lifting. Never carry solar
modules by just one part of the frame.
| Do not expose the solar modules to mechanical impact.
| Do not touch the solar modules with sharp or pointed objects.
| To prevent lasting marks on the glass, only touch the solar
modules with clean, soft and silicone-free protective gloves. Do
not wear leather or powdered gloves.
| Make sure the rear of the mounted solar module is not
damaged even in the case of deflection due to mechanical
stress (e.g. due to snow loads).
| Do not drop any objects on the solar module and do not step
on it.
Attach the solar module using the predrilled mounting holes on the underside of
the frame (see Fig. 31). Use corrosion-resistant stainless steel bolts only.
I. Normal wind (up to 2400 Pa) and snow loads (up to 2400 Pa)
Number of bolts to be used in each case on the long sides: 2
Positioning of the screws: 1+4+5+8
II. High wind (up to 2400 Pa) and snow loads (up to 5400 Pa)
Number of bolts to be used in each case on the long sides: 2
Positioning of the screws: 1+4+5+8
The solar modules can be clamped in the provided clamping areas
(see Fig. 31).
I. Normal wind (up to 2400 Pa) and snow loads (up to 2400 Pa)
a. Clamping on the long side permitted? Yes
Number of clamps to be used in each case on the long sides: 2
Positioning of the clamps on the long sides: K1+K2+K3+K4
b. Clamping on the short side permitted? Yes
Number of clamps to be used in each case on the short sides: 2
Positioning of the clamps on the short sides: N1+N2+N3+N4
II. High wind (up to 2400 Pa) and snow loads (up to 5400 Pa)
a. Clamping on the long side permitted? Yes
Number of clamps to be used in each case on the long sides: 2
Positioning of the clamps on the long sides: K1+K2+K3+K4
b. Clamping on the short side permitted? Yes
Number of clamps to be used in each case on the short sides: 2
Positioning of the clamps on the short sides: N1+N2+N3+N4
The clamping elements must not protrude past the edge of the frame on the
glass side. Make sure the clamping elements do not damage the frame surface
or bend the frame.
3.3. Electrical installation
3.3.1. Electrical values
All relevant electrical values are specified on the label on the reverse of the
solar module.
Under normal conditions, a photovoltaic module is likely to experience
conditions that produce more current and/or voltage than reported at standard
test conditions. Accordingly, the values of ISC and VOC marked on this module
should be multiplied by a factor of 1.25 when determining component voltage
ratings, conductor current ratings, fuse sizes, and size of controls connected to
the PV output.
Refer to Section 690-8 of the National Electrical Code for an additional
multiplying factor of 125 percent (80 percent derating) which may be applicable.
The maximum series fuse rating for these modules is: 15.0 A.
3.3.2. General safety instructions
| Carry out the cabling in accordance with the applicable regulations.
| Make sure that the cables and connections are not damaged. Protect the
cables from damage.
Risk of electric shock. Risk of fire and injury from electric
arc.
| Do not disconnect connections under load.
| Ensure sufficient protection against contact with live parts.
| Only use insulated tools.
| Do not insert any electrically conducting parts into the
connectors.
| Never open the junction box.
| Make sure there is no tension in the cable when positioning
and heed the specified minimum bend radius.
| Avoid large conductor loops.
3.3.3. Parallel and serial connection
Solar modules of the same type can be connected in parallel. These solar
modules are fundamentally designed for series connection.
Material damage due to connection errors.
| Only use solar modules of the same type and output for parallel
connection. Take measures for overcurrent protection (e.g. line
fuse) if necessary. Never exceed the specified maximum series
fuse rating of the solar modules.
3.
Installation
Installation Manual Conergy PH 245-270P 3
Maximum number of module strings that are allowed to be switched in
parallel: 2 current (fuse rating / (short-circuit * 1.25) + 1)
| Make sure that only solar modules with the same amperage (IMPP) are
connected in series and make sure that the string voltages are the same.
Even at low temperatures, never exceed the maximum permissible
system voltage of the solar modules.
| Maximum number of modules that are allowed to be switched in series: 20
(maximum system voltage / (open circuit voltage * 1.25))
| Make sure that the number and connection of the solar modules match
the electrical values specified by the devices connected to the
photovoltaic system.
| Use only 90ºC wet-rated, sunlight resistant, stranded or solid conductor
cables for all module and interconnect wiring that may be exposed to
weather.
| Make sure that the polarity is correct.
3.3.4. Connecting the photovoltaic module
On the rear of the solar module, there is a connection box with the connection
cables, the plug and the socket.
Connection cable length 1000 mm
Connection cable cross section
3.3
mm
2
Allowable ambient temperature range for
cables From -40 °C
To
+85
°C
All details for wiring should be in accordance with NEC guidelines and the
grounding method of the frame of arrays shall comply with the NEC, article 250.
3.3.5. Grounding
For grounding requirements, please refer to section Grounding Requirements
(UL).
4. Maintenance and care
The solar modules are low-maintenance modules. However, Conergy
recommends that a visual inspection of the mechanical and electrical
connections be performed once a year to detect any damage.
Dirt on the solar modules reduces the output and the yield. If the solar modules
are installed with an inclination angle of more than 15°, they will generally be
adequately cleaned by the rain.
Damage to the solar module surface can occur by scratching
or extreme differences in temperature.
| Only use pH neutral liquid cleaner, even if there is excessive
dirt build-up.
| Do not use abrasive cleaning agents.
| Ensure cleaning solutions are at roughly the same temperature
as the solar module surface.
| Wipe the solar module surface with water and a soft cloth.
| Never attempt to rub or scratch off dirt particles.
5. Removal
Risk of electric shock.
| Do not touch any bare connection parts.
| Only use insulated tools.
1. Disconnect the inverter from the supply network on the AC side so that the
photovoltaic system has no load.
2. Disconnect the photovoltaic system from the inverter at the cut-off point on
the DC side.
3. Make sure that the system is not supplied with voltage.
4. Remove the photovoltaic system in the same way as it was installed;
observe the safety instructions.
6. Disposal
Do not dispose of old or defective solar modules with normal house hold waste.
Please ask your installer, dealer or Conergy about disposal.
4.
Maintenance and care
4
Installation Manual Conergy PH 245-270P 4
7. Grounding Requirements (UL)
Equipment grounding requirements must be checked in accordance with the applicable regulations and standards before work is started.
The module frame or array must be grounded to avoid the hazards of electric shock or fire. The position of possible grounding connections can be found in Fig. 3-1.
An equipment grounding conductor can be fixed to the holes in the frame. Copper ground wire or equivalent to be used:
The grounding wire can be mounted on one of the designated holes in the module frame (see fig. 3-1).
Avoid contact corrosion when using different metals and observe electro-chemical insulation rating.
As an option, UL-467 approved bonding and grounding devices, including Burndy (formerly WileyElectronics) Washer Electrical Equipment Bonding (WEEB) and
similar devices, which penetrate the anodized layer of the module frame during installation can also be used for grounding the solar modules. These UL-467
approved devices are available together with grounding terminals (for the connection of the mounting system to the earth) from the manufacturer.
Observe the applicable regulations.
Fig. 3-2: Grounding of the module frame
7.
Grounding Requirements
Installation Manual Conergy PH 245-270P 5
Technical Details
The electrical characteristics are within +/-3.0 percent of the indicated value of Pmax and within +/-10.0 percent of the indicated values of VmPP, ImPP, Voc and Isc
under standard test conditions (irradiance of 1000 W/m2, AM 1.5 spectrum and a cell temperature of 25 °C (77 °F)).
Module Type Maximum
Power (PMPP)
Maximum Power
Maximum Power
Open Circut
Voltage (Voc)
Short Circut
Current (Isc)
Maximum System
Voltage (V)
Maximum Series
Fuse Rating (A)
PH 245P
245Wp
37.98V
8.62A
1000V
15A
PH 250P
250Wp
38.19V
8.65A
1000V
15A
PH 255P 255Wp 30.68V 8.33A 38.40V 8.69A 1000V 15A
PH 260P
260Wp
38.53V
8.72A
1000V
15A
PH 265P
265Wp
38.72V
8.75A
1000V
15A
PH 270P
270Wp
38.91V
8.79A
1000V
15A
Document History
1st version:14th October 2010
2nd revision:16th December 2010
3rd revision: 21st March 2011
4th revision: 26th April 2011 (WEEB addendum)
5th revision: 26th October 2011
6th revision: 29th October 2011 (WEEB addendum)
7th revision: 19th November 2012
8th revision: 19th November 2012 (Clamping addendum)
9th revision: 27th August 2013
10th revision: 27th August 2013
11th revision: 2nd June 2014
Installation Manual Conergy PH 245-270P 6
Conergy PH_245-260P_IM_UL_EN_2014-06-02 Subject to technical changes 2014 © Conergy
OUR WORLD IS FULL OF ENERGY.
Conergy North America Headquarters
2460 West 26th Avenue, Suite 280C
Denver, CO 80211
USA
Toll Free: 888.396.6611
Tel: 720.305.0700
info@conergy.us
www.conergy.us
Conergy Canada Headquarters
17815 - 111 Ave.
Edmonton, AB T5S 2X3
Canada
info@conergy.ca
Toll Free: 888.489.3701
Tel: 780.489.3700
www.conergy.ca
The figures and drawings in these assembly instructions are for illustration only and may differ from reality
Conergy reserves the right to make changes to this installation manual without prior notice.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8