TO
LAM P
GASKET
WASHER
STAMPED HOLE SUPPLIED IN POST
A S SH O W N . (H A N O V E R LA N TERN
PO ST ONLY)
11/16" DIA.
HOLE
INSTALLATION INSTRUCTIONS FOR PHOTO CONTROL
INSTALLATION INSTRUCTIONS FOR CONVENIENCE OUTLET
INSTALLATION INSTRUCTIONS FOR PHOTO CONTROL WITH DOOR
: ALL WIRING SHOULD COMPLY WITH LOCAL CODES.
NOTE
ALL WIRING SHOULD BE DONE BY A QUALIFIED ELECTRICIAN.
QUICK
DISC O N NECT
DIRECT BURIAL POSTS & ACCESSORIES
32H20-189-00, revision A
Littlestown, Pennsylvania 17340-0128
Phone: 717-359-7131
100 Craftway Dr.
INSTALLATION INSTRUCTIONS:
page 1 of 1
WIRE FROM THE PHOTOCELL TO THE INCOMING HOT LINE.
VERTICAL INSIDE POST. (WIRES OF PHOTO CO NTRO L MUST BE
DRIP LOOP
THAT CONCRETE DOES NOT ENTER BOTTOM OF POST OR WIREWAY HOLE.
A
TH IS END
D OW N
A
C
6. USE W IRE NUTS D ON ALL
7. ALLOW CONCRETE TO HARDEN BEFORE REMOVING BRACES.
PRINT IS BURIED AS PER ARROWS ON LABEL.
3. SLIDE NEOPRENE B W ASHER O VER THREADED END O F PHOTO
4. PUSH ALL WIRES BACK INTO LA RGE HO LE IN PO ST.
LIN E
THE PHOTOCELL TO THE COMMO N WIRE. ATTATCH THE BLACK
B
(TIGHTEN) MAKE SURE PHOTO CONTROL'S A LONG LENG TH IS
5. THREAD ROUN D KNURLED NUT C O NTO THREADED ENDOF A .
4. SLIDE PHOTO CO NTROL A INTO 11/16" DIA. HOLE OF POST.
WHIT E
2. TO INSTALL PHO TOCELL ATTACH RED W IRE FRO M PHOTO CELL
2. PLACE G ASKET B BETWEEN
PO ST & OUTLET A.
B L A C K
B
3. CONNECT BLACK O F OUTLET
1. TURN O FF ALL PO WER.
CONNECTIO NS.
6. WHEN ALL FINAL CO NNECTIONS ARE M ADE, PO WER MAY BE
AS SHOW N IN ILLUSTRATION.
H O LE .
THE PHO TOCELL TO THE COMM O N WIRE. A TTACH THE BLACK W IRE
A
7/ 8 " D IA .
W IRE W A Y
PO STS .
2. TO INSTALL PHO TOCELL ATTACH RED WIRE FRO M PHOTO CELL
TO THE LEAD FROM THE LAM P. ATTACH THE W HITE W IRE FROM
9. TURN O N PO WER.
TAPPED HOLES IN PO ST.
2 EA. SCREW S C THRU 2 EA.
8. SECURE OUTLET TO PO ST W ITH
LARG E HOLE IN POST.
INSTALLATION INSTRUCTIONS FOR DIRECT BURIAL POSTS
TO BLACK OF PO W ER.
5. ATTACH DOOR ASSEM BLY B TO POST C W / 2 EA.
G RO U N D
D
DIRE C T BU R IA L
C
TO G REEN OF GROUND PO WER.
COM M .
BLACK
WHIT E
W H I TE
COMM.
LO CKNU T
FROM THE PHOTOCELL TO THE INCOMING HOT LINE.
WHIT E
SCREWS D THRU 2 EA. 8-32 TAP THRU HO LES OF PO ST.
3. USE W IRE NUTS A ON ALL CO NNECTIO NS.
B
G R E E N
TO W HITE O F NEUTRAL PO WER.
D
4. CONNECT WHITE O F OUTLET
C
TO THE LEAD FROM THE LAM P. ATTACH THE W HITE WIRE FRO M
1. TURN O FF ALL PO WER.
5. CONNECT GREEN OF OUTLET
6. TURN ON PO W ER.
2 EA. 8-32 TAP THRU HOLES.
TURNED ON.
BLACK
LINE
BLACK
RED
CONTROL A
TURNED UP AS SHO WN IN ILLUSTRATIO N.) M AINTAIN DRIP LOOP
7. PUSH ALL WIRES BACK INTO
1. TURN O FF ALL PO WER.
1. CONSULT WITH LOCAL AUTHORITIES AS TO SPECIFIC BUILDING & ELECTRICAL CODES. THE
FOLLOWING
STEPS SHOULD HELP YOU MEET THOSE CODES.
2. EXCAVATE A HOLE APPROXIMATELY 20" DEEP OR DEEPER DEPENDING ON FROSTLINE IN YOUR
AREA.
THEN ADD APPROXIMATELY 2" OF STONES IN BOTTOM FOR DRAINAGE.
3. INSTALL CABLE FROM HOUSE TO FIXTURE POST IN TRENCH. MAKE SURE CABLE IS SUITABLE FOR
UNDERGROUND BURIAL.
4. INSERT CABLE THRU WIREWAY HOLE 10" FROM BOTTOM OF POST, LEAVING MINIMUM OF 6"
EXTENDED BEYOND TOP OF POST.
5. NOTE: SOME CONCRETES HAVE HIGH ALKALI CONTENT THAT CAN DAMAGE ALUMINUM. TO
PREVENT DAMAGE
COAT INGROUND PORTION OF POST WITH AN ASPHALT BASE PAINT.
6. INSERT POST IN CENTER OF HOLE & BRACE ON 3 SIDES. POUR CONCRETE IN HOLE BEING CAREFUL
WHEN INSTALLING POST, MAKE SURE THE END WITH THE YELLOW LABLE W/ BLACK
CONCRETE FOOTER TO BELOW LOCAL FROST LEVEL OR LOCAL CODE
"10
" OR DEEPER18
AT LEAST 4"