![](//vs1.manuzoid.com/store/data-gzf/75252db93111f3b9a685153fa4d12d96/2/000887513.htmlex.zip/bg1.jpg)
19"
O
0.496
0.25
DETAIL O
Step 1:
Determine your desired location for installation and make a mark for the location of the base plate. Make 2 marks each side
where mounting screws will be placed as shown below. Drill hole at each of the marks.
Drill holes Ceiling to mount base plate.
CH-90
INSTALLATION INSTRUCTIONS
No portion of this document or any artwork contained herein should reproduced in any way without the written conset of ALLIED BRASS INC.