Febco TK-1 Installation guide

Type
Installation guide
Designed for operator convenience and rugged reliability in a compact pack-
age. The FEBCO TK-1 offers the latest in gauge technology in a durable
custom-fitted case with room for tools.
Features:
• Lightweightbodyfordurability&chemicalresistance.
• Color-codedvalvesandhosesforeaseofuse.
• Largeanti-parallaxdialwhichindicates descendingmeasurement,
accurate to ± 1 percent of full scale.
• Replaceablehosefilterandvalvestem sealsforfieldreliability.
• Topmounteddrain/purgevalvesandconvenientlylocatedlinepressure
gauge.
• Completekitcontainsgaugewithcolor-codedvalvesandhoses,hose
adapter,shockcordforeasymountingandpurgehoseencasedina
durable case with room for tools.
• Forwardneedlevalvepositionsforeasyaccess.
Specifications:
• Maximumworkingpressure-200psig(13.8bar)
• Maximumworkingtemperature-200°F(93ºC)
• Gauge-4.5"diameterface,dualscale 0-15psidand0-1kg/cm2,±1%
accuracy full scale
• Testvalves-Threeneedlevalves
• Pressuregauge-0-200PSIsystemgauge
• Hoses-Three6footcolor-codedhoseswithfemalethreadedswivel
couplings.
• Adapter-Three
3
4"x
1
4"bushings
Three
1
2"x
1
4"bushings
Three
3
8"x
1
4"bushings
Three
1
4"Flaredfittings
• Oneshockcord.
• Onemoistureresistantinstructionguide
• Onelightweightdurablecarryingcase
Caution: To avoid freeze damage to the test kit it should be stored in a
dry warm area when not in use.
IS-F-TK-1
INSTALLATION INSTRUCTIONS
Series TK-1
Backflow Preventer Test Kit
Sizes: 2
1
2" 10" (65 250mm)
TK-1
Bleed Valve B
Bleed Valve A
A
C
B
A
B
C
Connections
Needle Valves
Test No. 1
765 Shown
Test Procedure for Pressure
Type Vacuum Breaker
Note: For both of the following tests the test kit must be held at the same
level as assembly being tested.
A.Beforestartingtestallneedlevalvesandbleedvalvesmustbeclosed.
B.Flushtestcock#2and#1.
Test No. 1 Air Inlet
Requirement:Airinletmuststarttoopenwhendownstreampressureis
1.0psiorabove.
Step1 Removenutontopofhoodandremovehood.
Step2 InstallhosebetweentestcockNo.2andconnection"A"onhigh
side(red)ontestkit.
Step3 OpentestcockNo.2andneedlevalve"A"highside(red)ontest
kit.
Step4 Openbleedvalve"A"ontopoftestkit.Bleedairfromhose.
Thenclosebleedvalve"A"ontopoftestkit.
Step5 CloseshutoffvalveNo.2thenshutoffvalveNo.1.
Step6 Slowlyopenneedlevalve"C"bypass(yellow)justasairinlet
opens.Recorddifferentialpressure.
Step7 ClosetestcockNo.2andremovehose.
Step8 Closeneedlevalve"C"bypass(yellow).
Step9 OpenshutoffvalveNo.1.
Test No. 2 Test Check Valve Pressure Drop
Requirement:Supplypressuredropmustbe1.0PSIDorabovewhen
waterflowstopsfromtestcockNo.2.
Step10 InstallhosebetweentestcockNo.1andconnection"A"high
side(red)ontestkit.
Step11 OpentestcockNo.1andbleedvalve"A"ontopoftestkit.
Openbleedvalve"A"ontopoftestkitandbleedairfromhose.
Shutoffbleedvalve"A"ontopoftestkit.
Step12 Closeshutoffvalve#1.
Step13 OpentestcockNo.2.WhenflowofwateroutoftestcockNo.
2stops,thedifferentialreadingisthepressuredroprecord
Step14 ClosetestcockNo.1andtestcockNo.2.
Step15 Replacehoodandnutontopofhood.OpenshutoffvalvesNos.
1then2.
2
Test No. 2
765 Shown
Bleed Valve A Bleed Valve B
Test Cock No. 2
Test Cock
Bleed Valve A Bleed Valve B
Test Cock No. 2
Test Cock
Test Procedure for Reduced
Pressure Assembly
A. Allneedlevalvesmustbeclosedontestkit.
B. OpentestcockNo.4andflushtestcocksNos.1,2and3onreduced
pressureassemblythenclosetestcockNo.4.
C. Attachhosesasshown.Bleedairfromkit,closeNo.2shutoff.
Test No. 1 - Check Valve No. 2
Purpose:TotestcheckvalveNo.2fortightnessagainstreverseflow.
Requirements: Valve must be tight against reverse flow under all pressure
differentials.
Step1 Slowlyopentheneedlevalve"A"highside(red)and"C"bypass
(yellow).Keepthe"B"low(blue)closed.
Step2 OpentestcockNo.4.OpentestcockNo.2andtestcockNo.3
afteropeningtestcockNo.4.
Step3 Indicatedpressuredifferentialwilldecreaseslightly.Ifpressure
differentialcontinuestodecrease(untiltheventopens)theNo.
2checkvalveisreportedas"leaking".
Test No. 2 - Shutoff Valve No. 2
Purpose:TotestshutoffvalveNo.2fortightness.
Step1 AfterpassingTestNo.1,continuetotestNo.2byclosingtest
cockNo.2.
Step2 Theindicatedpressuredifferentialwilldecreaseslightly.Ifpres-
suredifferentialcontinuestodecrease(approaching"zero")the
No.2shutoffvalveisreportedtobe"leaking".
Note:AleakingNo.2shutoffwillgiveafalsereadingintestsNo.3and4.
Test No. 3 - To test No. 1 Check Valve
Purpose:TotestcheckvalveNo.1fortightness.
Requirements: Valve must be tight against reverse flow under all pressure
differentials.
Step1 Closeneedlevalve"A"highside(red)andopentestcockNo.2.
Step2 ClosetestcockNo.4.Disconnectbypasshose(yellow)attest
cockNo.4.
Step3 Openneedlevalve"B"low(blue)and"C"bypass(yellow),bleed-
ingtoatmosphere,thenclosingneedlevalve"B"(blue)restores
the system to a normal static condition.
Step4 Observethepressuredifferentialgauge.Ifthereisadecreasein
theindicatedvalue,theNo.1checkvalveisreportedas"leaking"
Test No. 4 - Pressure Differential Relief Valve
Purpose: To test operation of pressure differential relief valve.
Requirements: The pressure differential relief valve must operate to main-
tainthe"zone"betweenthetwocheckvalvesatleast2psi(14kPa)less
than the supply pressure.
Step1 Closeneedlevalve"C"bypass(yellow).
Step2 Openneedlevalve"A"highside(red).
Step3 Openneedlevalve"B"low(blue)veryslowlyuntilthedifferential
gauge needle starts to drop.
Step4 Holdthevalveatthispositionandobservethegaugereading
at the moment the first discharge is noted from the relief valve.
Recordthisastheopeningdifferentialpressureoftherelief
valve.Note:itisimportantthatthedifferentialgaugeneedle
drops slowly.
Step5 ClosetestcocksNos.2and3.Removehosefromtestcocks
Nos.2and3.
Step6 Usebypasshose(yellow)torelievepressurefromtestkitby
openingneedlevalve"A","B"and"C"andbleedvalves"A"and
“B”.
Step7 RemovealltestequipmentandopenNo.2shutoffvalveofthe
device.
Bleed Valve A
Bleed Valve B
High
(red)
Bypass
(yellow)
3
Low
(blue)
860 Shown
MAINTENANCE MANUAL
Test Procedure for Double
Check Valve Assembly
A. Beforestartingtest,allneedlevalvesandbleedvalvesontestkitmust
be closed.
B. Flush test cocks before test.
NOTE:Supplypressuregaugereadingwilldecreasewhenperformingthis
test procedure.
Test No. 1 - Check Valve No. 1
NOTE:Closeallneedlevalve"A","B"and"C"andbleedvalve"A"and"B"on
test kit.
Step1 InsureshutoffNo.1isopen,shutoffNo.2isclosed.
Step2 Installhighsidehosebetweenconnection"A"highsideandtest
cockNo.3,lowsidehosebetween"B"lowsideandtestcock
No.2andopenbothtestcockNo.2and3.
Step3 Openbleedvalve"A"tobleedairfromthehighside.Close
"A"thenopenbleedvalve"B"tobleedlowside.Close"B".
Step4 Connectbypasshosebetweenconnection"C"bypassand
looselytotestcockNo.1.Openneedlevalves"A"highsideand
"C"bypasstoventairfrombypasshose.Tightenbypasshoseat
testcockNo.1,opentestcockNo.1.
Step5 CloseshutoffNo.1.Slowlyopenbleed"B"untildifferential
gaugerisesto2psiandclose.Ifthedifferentialreadingdoes
notdecrease,recordcheckvalveas"tight".
Step6 Closealltestcocksandopenbleedvalves"A"and"B".Then
closeneedlevalves"A","B"and"C"andbleedvalves"A"and"B".
Removehosesfromtestcocks.
Test No. 2 - Check Valve No. 2
Step7 MovethehighsidehosetotestcockNo.4,lowsidehoseto
testcockNo.3andopenbothtestcockNo.3and4.Remove
bypasshosefromtestcockNo.1,openshutoffvalveNo.1.
Step8 Openbleedvalve"A"tobleedairfromthehighside.Close
bleed"A"thenopenbleed"B"tobleedlowside.Closebleed"B".
Step9 ConnectbypasshoselooselytotestcockNo.1.Openneedle
valves"A"highsideand"C"bypasstoventairfromthebypasshose.
TightenbypasshoseattestcockNo.1,opentestcockNo.1.
Step10 CloseshutoffNo.1,thenslowlyopenbleed"B"untildifferential
gaugerisesto2PSIandclose.Ifthedifferentialreadingdoes
notdecrease,recordcheckastight.Closealltestcocksand
removehoses.Openbleedvalves"A"and"B".Restorevalveto
original working condition.
NOTE: The assembly will fail both the first and second check
valvetestsabove,ifshutoffNo.2leaksexcessively.Totestfor
aleakyNo.2shutoff,usethefollowingprocedure.
Test for Leaky No. 2 Shutoff
Step11 ConnectthehighsidehosetotestcockNo.1,lowsidehose
totestcockNo.4.OpentestcocksNo.1and4.Closeshutoffs
No.1and2.
Step12 Closeneedlevalve"C"bypass.Openneedlevalve"A"highside,
thenopenneedlevalve"B"lowsideoneturn,loosenhoseat
testcockNo.4toremoveair.Retightenhose.
Step13 Ifthedifferentialgaugerisesabove0thereisexcessiveleakage
atshutoffNo.2anditmustbereplacedtotesttheassembly.
Bleed Valve A
Bleed Valve B
High
(red)
Bypass
(yellow)
Low
(blue)
850 Shown
A Division of Watts Water Technologies, Inc.
USA: 4381 N. Brawley • Ste. 102 • Fresno, CA • 93722 • Tel. (559) 441-5300 • Fax: (559) 441-5301 • www.FEBCOonline.com
Canada: 5435 North Service Rd. • Burlington, ONT. • L7L 5H7 • Tel. (905) 332-4090 • Fax: (905) 332-7068 • www.FEBCOonline.ca
IS-F-TK-1 0845 EDP# 1915970 © FEBCO, 2008
Limited Warranty: FEBCO warrants each product to be free from defects in material and workmanship under normal usage for a period of one year from the date of original shipment. In the event
of such defects within the warranty period, the Company will, at its option, replace or recondition the product without charge.
THE WARRANTY SET FORTH HEREIN IS GIVEN EXPRESSLY AND IS THE ONLY WARRANTY GIVEN BY THE COMPANY WITH RESPECT TO THE PRODUCT. THE COMPANY MAKES NO OTHER
WARRANTIES, EXPRESS OR IMPLIED. THE COMPANY HEREBY SPECIFICALLY DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE IMPLIED
WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
The remedy described in the first paragraph of this warranty shall constitute the sole and exclusive remedy for breach of warranty, and the Company shall not be responsible for any incidental, special
or consequential damages, including without limitation, lost profits or the cost of repairing or replacing other property which is damaged if this product does not work properly, other costs resulting
from labor charges, delays, vandalism, negligence, fouling caused by foreign material, damage from adverse water conditions, chemical, or any other circumstances over which the Company has no
control. This warranty shall be invalidated by any abuse, misuse, misapplication, improper installation or improper maintenance or alteration of the product.
Some States do not allow limitations on how long an implied warranty lasts, and some States do not allow the exclusion or limitation of incidental or consequential damages. Therefore the above
limitations may not apply to you. This Limited Warranty gives you specific legal rights, and you may have other rights that vary from State to State. You should consult applicable state laws to
determine your rights. SO FAR AS IS CONSISTENT WITH APPLICABLE STATE LAW, ANY IMPLIED WARRANTIES THAT MAY NOT BE DISCLAIMED, INCLUDING THE IMPLIED WARRANTIES OF
MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, ARE LIMITED IN DURATION TO ONE YEAR FROM THE DATE OF ORIGINAL SHIPMENT.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Febco TK-1 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI