Tripp Lite Conduit Box Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Tripp Lite Conduit Box Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Conduit Box
Installation Instructions
1. Remove the terminal
block cover located
on the top-front of
the UPS to access the
UPS system’s input,
output and grounding
connection terminals.
2. The terminal block cover
will be replaced with the
terminal conduit box
found inside the UPS (see
illustration).
3. Prepare the terminal box
cover with circular cutouts
to allow wiring conduits to
pass through.
4. Attach the terminal
box cover to the top of
the UPS system after
flexible conduit has been
attached.
Notes:
• Make sure the wires are tightly
connected to the terminals.
• Cabling should be protected
by flexible conduit and routed
through the appropriate
knockouts in the terminal
block cover.
1111 W. 35th Street, Chicago, IL 60609 USA • www.tripplite.com/support
Copyright © 2017 Tripp Lite. All rights reserved.
Example of conduit
box with circular
cutouts installed
Example of conduit
box located inside
UPS frame
Español 2 • Français 3 • Русский 4
17-03-265-9336D4.indb 1 3/30/2017 2:44:45 PM
/