Chromalox CMi Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Chromalox CMi Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1
Installation & Operation Instructions
for Mineral Insulated Heating Cable
Embedded Snow Melting Applications
PJ964
161-562581-084
September 2012
CIT-1
Snow Sensor
APS-4C/3C
Snow/Ice
Controller
Junction
Box
SIT-6E
Pavement Sensor
JB-7
Junction Box
DRAFT 9/13/12
2
Mineral Insulated Heating Cable
Embedded Snow Melting Applications Installation and Operation Instructions
Inspection
s /PENPACKAGEANDVISUALLYCHECKFORBREAKSORDAMAGE
TOTHECABLE&ILECLAIMWITHCARRIERIFDAMAGEISFOUND
s .EVERENERGIZETHECABLEWHENITSCOILED4ESTONLYWHEN
ITSLAIDOUTSTRAIGHT
s !FTER REMOVING THE CABLE FROM THE CARTON CHECK THE
INSULATIONRESISTANCEOFTHEUNITFROMBUSSWIRESTOTHE
CABLEMETALSHEATH4ESTSHALLBECONDUCTEDAT6DC
BUTINABSENCEOFTHISTYPEOFEQUIPMENTA6DCTEST
WILLDETECTMOSTFAILURES
s 7HEN THE CABLE IS RECEIVEDCABLE SHOULD HAVE A MINI-
MUMINSULATIONRESISTANCEOF-1
General Design and Installation Notes:
s 3TANDARDSPACINGOF CABLESIS TYPICALLY v#ABLES CAN
BESPACEDUPTOv$ONOTINSTALLANYCABLECLOSERTHAN
vFROMTHEEDGEOFSLAB)FCABLESARESPACEDMORETHAN
vTHEAREABETWEENTHECABLERUNSMAYNOTMELTCOM-
PLETELY
s $ONOTBENDCABLETIGHTERTHANvINSIDEDIAMETER
s $ONOTOVERLAPCABLE
s $ESIGN SYSTEM SO THAT CABLES DO NOT CROSSEXPANSION
JOINTS )F CABLES MUST CROSS EXPANSION JOINTS SEE DIA-
GRAMINTHISDOCUMENT
s &ORSNOWMELTINGINPEDESTRIANAREASWATTDENSITYSHOULD
GENERALLYBEDESIGNEDATWATTSPERSQUAREFOOT
s &ORSNOWMELTINGINVEHICLEAREASUSETOWATTSPER
SQUAREFOOT
1.(EATERSSHOULDBEINSTALLEDINAUNIFORMPATTERNSIMI-
LARTOTHATSHOWNINFigure 1#ABLEDEPTHSHOULDBE
INCHESTOINCHESBELOWTHElNISHEDSURFACE
2.7HENINSTALLINGTHEHEATERSTOANEXISTINGSLABTHECA-
BLESSHOULDBESECUREDUSINGTHE330SPACERSTRIPAS
SHOWNINFigure 2ORBYATTACHINGTOAWIREMESH
3.4HEMINIMUMBENDRADIUSOFTHECABLEISTIMESTHEDI-
AMETER$ONOTBENDTHECABLETOOSHARPLY$ONOTMAKE
ABENDIN THECABLEWITHIN INCHESOFTHE BRAZEDHOT
COLDJOINTORTERMINATIONSLEEVE
4./NCETHEHEATERISINPLACEANDSECUREDPRIORTOCOVER-
INGCONDUCTAINSULATIONRESISTANCECHECKONTHEUNITS
AT6DC4HEINSULATIONRESISTANCEREADINGMUSTBE
NOLESSTHAN-1
Installing Cable in Concrete:
Figure 1
4YPICAL)NSTALLATION
Figure 2
4YPE3303PACER3TRIP
3HOULDITBENECESSARYTOPASSTHEHEATINGCABLETHROUGH
ANEXPANSIONJOINTITSHOULDBEDONEASSHOWNIN&IGURE!
OR"5SEMETHODSHOWNIN&IGURE!TOPASSUNDERJOINTS
!LLOWvOFCABLETOLOOPUNDERJOINT
5SEMETHODIN &IGURE"WHENIT ISNOTPOSSIBLE TOPASS
UNDERTHEJOINTORATWOPOURSLABISUSED
Expansion and Construction Joints:
Figure 3A
4YPICAL%XPANSION*OINT$ETAIL
Figure 3B
4YPICAL%XPANSION*OINT$ETAIL
(EATERSSHOULDBEINSTALLEDINAUNIFORMPATTERNANDHELD
IN POSITIONON THE BASE SLABUSING 330 SPACER STRIP OR
BYATTACHINGTOMESH!FTERTHECABLESAREINPLACEASMALL
AMOUNT OF ASPHALT SHOULD BE PUT OVER THE CABLES AND
TAMPED4HElNALTOPPINGCOURSESHOULDBEAMINIMUMOF
INCHESINTHICKNESSAFTERCOMPACTION
4HEMINIMUM BENDRADIUS OFTHE CABLEIS TIMESTHE DI-
AMETER $O NOTBEND THECABLE TOOSHARPLY$O NOTMAKE
ABENDINTHECABLEWITHININCHESOFTHEBRAZEDHOTCOLD
JOINTORTERMINATIONSLEEVE
/NCE THE HEATER IS IN PLACE AND SECURED PRIOR TO COVER-
ING CONDUCT A INSULATION RESISTANCE CHECK ON THE UNITS
AT6DC4HEINSULATIONRESISTANCEREADINGMUSTBENO
LESSTHAN-1
Special Surface Treatments
7HENSLABSURFACESARETOBETOPPEDWITHDECORATIVETILE
BRICKMARBLEGRANITEETCITISRECOMMENDEDTHATTHECABLE
BEATTACHEDTOTHEREINFORCING)FTHISISNOTPOSSIBLETHEN
THECABLESHOULDBEINSTALLEDINTHEGROUTBENEATHTHETILEAS
SHOWNINFigure 4/NCECABLEISCORRECTLYPOSITIONEDTHE
BASESLABSURFACEMUSTBEPREPAREDPROPERLYTORECEIVETHE
TOPPING#AREMUSTBETAKENWHENAPPLYINGTHEDECORATIVE
TOPPINGNOTTODAMAGETHECABLE
Heater Unit Termination:
%ACHHEATERUNITISTERMINATEDWITHABRAZEDSEALANDPRES-
SURElTTINGFORATTACHINGCABLEINTOCONDUITHUB3EEFigure
5FORDETAILS
Installing Cable in Asphalt:
Figure 4
4YPICAL$ETAIL7ITH#ABLE)N'ROUT
Figure 5
4YPICAL$ETAIL7ITH#ABLE)N'ROUT
Slab Temperature Sensor:
Control, Monitoring, and Power Distribution
4OPREVENTCABLEFROMBEINGENERGIZEDDURINGTIMESITSNOTNEED-
EDANDFORENERGYEFlCIENCYASEPARATESLABSENSINGTHERMOSTAT
OR INTEGRAL TEMPERATURE SENSOR SHOULD BE USED 4HESE SENSORS
SHOULDBEUSEDINCONJUNCTION WITHTHEAUTOMATICSNOWMELTING
CONTROLPANELS 4HE TEMPERATURE SENSOR SHOULD BE INSTALLED BE-
TWEENTWORUNSOFHEATINGCABLEANDSHOULDBEINSTALLEDINMETAL
CONDUIT$ONOTALLOWTHECONDUITTOTOUCHTHEHEATINGCABLEAND
CAPTHEMETALCONDUITSOTHATITISWATERTIGHT4HECONDUITSHOULD
BELONGENOUGHTOEXTENDTOTHEMIDDLEOFTHEAREABEINGHEATED
#HROMALOXSNOWMELTSYSTEMSSHOULDBECONTROLLEDINONEOFTHE
FOLLOWINGTHREEWAYS
-ANUAL/N/FF#ONTROL
s 4HEPOWERORCIRCUITBREAKERSAREMANUALLYOPERATED
3LAB3ENSING4HERMOSTAT
s 4HESYSTEMWILLENERGIZEWHENTHESLABTEMPERATUREDROPSBE-
LOWTHEFREEZING4HESYSTEMWILLCOMEONEVENWHENMOISTURE
ISNOT PRESENT 4HEREFORETHIS IS NOTTHE MOST ENERGYEFlCIENT
METHODOFCONTROL
!UTOMATIC3NOW#ONTROLLER
s 4HE METHOD SHOWN BELOW IS THE MOST ENERGYEFlCIENT METH-
OD 4HE CABLE WILL BE AUTOMATICALLY ENERGIZED WHEN MOISTURE
ISPRESENTANDTHETEMPERATUREISBELOWFREEZING4HESYSTEM
WILLALSOBEDEENERGIZEDAUTOMATICALLYONCETHESLABREACHES
THE TEMPERATURE SET POINT ! BUILTIN TIMER KEEPS THE SYSTEM
ENERGIZEDFORASETTIMETOALLOWSLABTODRYCOMPLETELYONCETHE
MOISTUREISNOLONGERPRESENT
4EMPERATURE/NLY 4EMPERATUREAND-OISTURE
"RANCHCIRCUITWIRING-534COMPLYWITHLOCALANDNATIONAL
ELECTRIC CODES (EATER UNIT COLD SECTIONS ARE AVAILABLE IN
ANYLENGTH TO REACHREMOTEJUNCTION BOX LOCATIONS)F ANY
PORTIONOFTHECOLDSECTIONISTOBEBURIEDITMUSTBEBURIED
ATAMINIMUMDEPTHOFINCHES
*UNCTIONBOXESAREPREFERABLYLOCATEDINDOORASINFigure
6/UTDOORWALLMOUNTEDJUNCTIONBOXESMUSTBEOFWEATH-
ERPROOFCONSTRUCTIONANDLOCATEDATLEASTTHREEFEETABOVE
GRADE AS IN Figure 7 /UTDOOR ONGRADE mUSH MOUNTED
JUNCTION BOXES AS IN Figure 8 MUST BE PROVIDED WITH A
DRAIN AND GASKETED COVER "OXES INSTALLED IN THE SLAB
SHOULDBE AVOIDEDDUE TO POSSIBILITYOF THEACCUMULATION
OFCONDENSATE
s #HECK TO ENSURE INCOMING ELECTRICAL SUPPLY IS CORRECT
VOLTAGETOBEHOOKEDUPTOHEATINGCABLE
s 5SE#IRCUIT"REAKERSWITHM!GROUNDFAULTPROTECTION
ONALLHEATINGCABLECIRCUITS
s 2EFERTOWIRINGDIAGRAMSOFSNOWMELTCONTROLSFORWIRING
CONlGURATIONS
Wiring:
Figure 6
4YPICAL)NDOOR*UNCTION"OX
Figure 7
4YPICAL/UTDOOR!BOVE'RADE*UNCTION"OX$ETAIL
Figure 8
4YPICAL"URIED*UNCTION"OX
1. )F INSTALLING CABLE ON STAIRS WITH AN ATTACHED LANDING
WHEREANEXPANSIONJOINTSEPARATESTHESTAIRSANDLAND-
INGDONOTCROSSTHEEXPANSIONJOINTWITHTHECABLE!
SEPARATECABLEWILLBENEEDEDFORTHELANDING
2. )NSTALL JUNCTION BOXES 7HEN USING SINGLE CONDUCTOR
CABLESTHEJUNCTIONBOXWILLNEEDTOBELOCATEDCLOSETO
WHERETHECABLESTARTSANDENDS
3. 0LAN THE CABLE LAYOUT ON THE STEPS -ARK LOCATIONS
WHERERAILPOSTSWILLBEINSTALLEDONTHESTAIRSANDKEEP
THEHEATINGCABLEAWAYFROMTHESEAREASTOAVOIDDAM-
AGETOTHECABLE
4. ,AYOUTHEATINGCABLEASSHOWNBELOWANDFASTENCABLE
TOTHEREINFORCEMENT&ORSTEPSWITHADEPTHOFTO
INCHESTHREERUNSOFHEATINGCABLEARENEEDEDWITH
THElRSTRUNBEINGTOINCHESFROMFRONTOFSTEPAND
THEREMAININGTWORUNSSPACEDEQUALLYAPART&ORSTEPS
WITHADEPTHOFLESSTHENINCHESTWORUNSOFCABLE
ARENEEDEDWITHlRSTRUNTOINCHESFROMTHEFRONTOF
STEPANDTHESECONDRUNSPACEDINCHESFROMTHElRST
RUN OF CABLE 3TAY AT LEAST  INCHES FROM OUTER WALLS
EDGESANDRAILPOSTANCHORPOINTS
5. )NSTALLHOTCOLDJOINTSSOTHATTHEYAREATLEASTINCHES
FROMTHEEDGEOFTHESLABSOTOENSUREITWILLBECOM-
PLETELYEMBEDDED
6. )NSTALLTHECONDUITFORTHESLABTEMPERATURESENSOR
7. 6ISUALLYINSPECTCABLESCOLDLEADSANDJUNCTIONBOXES
TOINSUREPROPERINSTALLATION
8. "EFORECONCRETEISPOUREDCHECKINSULATIONRESISTANCE
OFTHECABLESAT6DC-INIMUMACCEPTABLEREAD-
INGIS-1
9. 0OURATOINCHTHICKNESSOFCONCRETEOVERTHEHEAT-
ING CABLES AND CONTINUOUSLY CHECK THE INSULATION RE-
SISTANCE WHILECONCRETE ISBEING POURED TOENSURE NO
DAMAGEISBEINGDONETOCABLES-INIMUMACCEPTABLE
READINGIS-1AT6DC
10.#ONNECTCOLDLEADSTOTHEJUNCTIONBOX
11.4HESLABTEMPERATURESENSORCANBEINSTALLEDAFTERIN-
STALLATIONOFCONCRETEISCOMPLETE
Installing Cable in Stairs (Single Pour):
Figure 9
4YPICAL3INGLE0OUR$ETAIL
7
1. )F INSTALLING CABLE ON STAIRS WITH AN ATTACHED LANDING
WHEREANEXPANSIONJOINTSEPARATESTHESTAIRSANDLAND-
INGDONOTCROSSTHEEXPANSIONJOINTWITHTHECABLE!
SEPARATECABLEWILLBENEEDEDFORTHELANDING
2. )NSTALL JUNCTION BOXES 7HEN USING SINGLE CONDUCTOR
CABLESTHEJUNCTIONBOXWILLNEEDTOBELOCATEDCLOSETO
WHERETHECABLESTARTSANDENDS
3. 0LAN THE CABLE LAYOUT ON THE STEPS -ARK LOCATIONS
WHERERAILPOSTSWILLBEINSTALLEDONTHESTAIRSANDKEEP
THEHEATINGCABLEAWAYFROMTHESEAREASTOAVOIDDAM-
AGETOTHECABLE
4. )NSTALLPREPUNCHEDSTRAPPINGUSINGAPPROPRIATEFASTEN-
INGMETHODATTOFEETINTERVALSWITHADDITIONALRUNS
TOSECURECABLELOOPSSECURELY
5. ,AYOUTHEATINGCABLEASSHOWNBELOWANDFASTENCABLE
TOTHEPREPUNCHEDSTRAPPING&ORSTEPSWITHADEPTHOF
TOINCHESTHREERUNSOFHEATINGCABLEARENEED-
EDWITH THElRST RUNBEING TO INCHESFROMFRONTOF
STEPANDTHEREMAININGTWORUNSSPACEDEQUALLYAPART
&ORSTEPSWITHADEPTHOFLESSTHENINCHESTWORUNS
OFCABLEARENEEDEDWITHlRSTRUNTOINCHESFROMTHE
FRONTOFSTEPANDTHESECONDRUNSPACEDINCHESFROM
THElRSTRUNOFCABLE3TAYATLEASTINCHESFROMOUTER
WALLSEDGESANDRAILPOSTANCHORPOINTS
6. )NSTALLHOTCOLDJOINTSSOTHATTHEYAREATLEASTINCHES
FROMTHEEDGEOFTHESLABSOTOENSUREITWILLBECOM-
PLETELYEMBEDDED
7. )NSTALLTHECONDUITFORTHESLABTEMPERATURESENSOR
8. 6ISUALLYINSPECTCABLESCOLDLEADSANDJUNCTIONBOXES
TOINSUREPROPERINSTALLATION
9. "EFORECONCRETEISPOUREDCHECKINSULATIONRESISTANCE
OFTHECABLESAT6DC-INIMUMACCEPTABLEREAD-
INGIS-1
10.0OURATOINCHTHICKNESSOFCONCRETEOVERTHEHEAT-
ING CABLES AND CONTINUOUSLY CHECK THE INSULATION RE-
SISTANCE WHILECONCRETE ISBEING POURED TOENSURE NO
DAMAGEISBEINGDONETOCABLES-INIMUMACCEPTABLE
READINGIS-1AT6DC
11.#ONNECTCOLDLEADSTOTHEJUNCTIONBOX
12.4HESLABTEMPERATURESENSORCANBEINSTALLEDAFTERIN-
STALLATIONOFCONCRETEISCOMPLETE
Installing Cable in Stairs (Two Pour or existing):
Figure 10
4YPICAL4WO0OUR$ETAIL
1347 HEIL QUAKER BLVD., LAVERGNE, TN 37086
Phone: (615) 793-3900 www.chromalox.com
Limited Warranty:
Please refer to the Chromalox limited warranty applicable to this product at
http://www.chromalox.com/customer-service/policies/termsofsale.aspx.
¥#HROMALOX)NC
Visual Inspection
s )NSPECT *UNCTIONBOXES CABLE TERMINATIONS AND CON-
NECTIONSTOTHECABLEFORPHYSICALDAMAGE
s )NSPECTCOLDLEADSIFTHEYEXITTHESLABFORPHYSICALDAM-
AGE
s )NSURETHATMOISTUREISNOTPRESENTINTHEJUNCTIONBOX-
ES
s #HECKTHATELECTRICALCONNECTIONSARETIGHTANDTHATTHE
.04CONNECTORSARETIGHTANDPROPERLYGROUNDED
De-energize circuit(s) before performing insulation re-
sistance check
Insulation Resistance Check
4HISTESTSHOULDBEPERFORMEDTIMESTHROUGHOUTTHEIN-
STALLATIONPROCESS
s 7HENRECEIVED-IN-1
s !FTER)NSTALL-IN-1
s #ONTINUOUSLYWHILEDURINGINSTALLATIONOFCONCRETEAS-
PHALTECT-IN-1
s 0RIORTOSTARTUPCOMMISSIONING-IN-1
4HISTESTSHOULDALSOBEPERFORMEDASPARTOFAREGULARSYS-
TEMINSPECTIONANDAFTERANYMAINTENANCEORREPAIRWORK
COMMISSIONING AND PREVENTATIVE MAINTENANCE
System Tests
/