7
1. )F INSTALLING CABLE ON STAIRS WITH AN ATTACHED LANDING
WHEREANEXPANSIONJOINTSEPARATESTHESTAIRSANDLAND-
INGDONOTCROSSTHEEXPANSIONJOINTWITHTHECABLE!
SEPARATECABLEWILLBENEEDEDFORTHELANDING
2. )NSTALL JUNCTION BOXES 7HEN USING SINGLE CONDUCTOR
CABLESTHEJUNCTIONBOXWILLNEEDTOBELOCATEDCLOSETO
WHERETHECABLESTARTSANDENDS
3. 0LAN THE CABLE LAYOUT ON THE STEPS -ARK LOCATIONS
WHERERAILPOSTSWILLBEINSTALLEDONTHESTAIRSANDKEEP
THEHEATINGCABLEAWAYFROMTHESEAREASTOAVOIDDAM-
AGETOTHECABLE
4. )NSTALLPREPUNCHEDSTRAPPINGUSINGAPPROPRIATEFASTEN-
INGMETHODATTOFEETINTERVALSWITHADDITIONALRUNS
TOSECURECABLELOOPSSECURELY
5. ,AYOUTHEATINGCABLEASSHOWNBELOWANDFASTENCABLE
TOTHEPREPUNCHEDSTRAPPING&ORSTEPSWITHADEPTHOF
TOINCHESTHREERUNSOFHEATINGCABLEARENEED-
EDWITH THElRST RUNBEING TO INCHESFROMFRONTOF
STEPANDTHEREMAININGTWORUNSSPACEDEQUALLYAPART
&ORSTEPSWITHADEPTHOFLESSTHENINCHESTWORUNS
OFCABLEARENEEDEDWITHlRSTRUNTOINCHESFROMTHE
FRONTOFSTEPANDTHESECONDRUNSPACEDINCHESFROM
THElRSTRUNOFCABLE3TAYATLEASTINCHESFROMOUTER
WALLSEDGESANDRAILPOSTANCHORPOINTS
6. )NSTALLHOTCOLDJOINTSSOTHATTHEYAREATLEASTINCHES
FROMTHEEDGEOFTHESLABSOTOENSUREITWILLBECOM-
PLETELYEMBEDDED
7. )NSTALLTHECONDUITFORTHESLABTEMPERATURESENSOR
8. 6ISUALLYINSPECTCABLESCOLDLEADSANDJUNCTIONBOXES
TOINSUREPROPERINSTALLATION
9. "EFORECONCRETEISPOUREDCHECKINSULATIONRESISTANCE
OFTHECABLESAT6DC-INIMUMACCEPTABLEREAD-
INGIS-1
10.0OURATOINCHTHICKNESSOFCONCRETEOVERTHEHEAT-
ING CABLES AND CONTINUOUSLY CHECK THE INSULATION RE-
SISTANCE WHILECONCRETE ISBEING POURED TOENSURE NO
DAMAGEISBEINGDONETOCABLES-INIMUMACCEPTABLE
READINGIS-1AT6DC
11.#ONNECTCOLDLEADSTOTHEJUNCTIONBOX
12.4HESLABTEMPERATURESENSORCANBEINSTALLEDAFTERIN-
STALLATIONOFCONCRETEISCOMPLETE
Installing Cable in Stairs (Two Pour or existing):
Figure 10
4YPICAL4WO0OUR$ETAIL