Sloan SG-7019 Installation guide

Type
Installation guide
WARNING: Risk of personal injury or product damage. Handle with care.
SKU Description M12 Rack Bolt M16 Rack Bolt Wall Bracket M12 Chair Bracket In Wall Tank frame
1213309-0 1223947-0 1224238-0 1225108-0 97504IN-NA
1213309-1CP-0 1223947-1CP-0
1213309-1BLM-0 1223947-1BLM-0
SKU Code
SG-7019
Compact Rear
Inlet Urinal
BEFORE YOU BEGIN
RECOMMENDED TOOLS AND MATERIALS:-
INSTALLATION INSTRUCTIONS
Vitreous China can break or chip if the bolts and nuts are over-
tightened, or if the product is handled carelessly.
Observe all local plumbing and building codes.
Check for any damage to the new urinal before installation.
Make sure the wall is strong enough to support the new urinal prior
to installation. Reinforce or install a urinal carrier if necessary.
Minimum Flowing Pressure: 25 PSI
WARNING: hazardous gases can escape through the waste pipe
if new urinal is not installed quickly. A temporary fix: place a rag in
the waste pipe hole.
INSTALLATION GUIDELINE
Gasket
(Included)
Outlet Flange
(Included)
2” NPT
Remove the temporary rag (if used) from the
waste pipe hole.
Apply thread sealant to waste pipe threads
and install new outlet flange on pipe.
1. INSTALL OUTLET FLANGE AND GASKET
Silicone
FOR BEST PERFORMANCE OF YOUR
SLOAN® URINAL, USE SLOAN®
TRUFLUSH FLUSHOMETERS
Rev-00 03-21
Code:08160021
SLOAN INDIA PRIVATE LIMTED
344, PHASE-II, UDYOG VIHAR, GURGAON 122015 Phone: (+91) 124-601333
Toll Free: 1800.123.3080 | [email protected] | sloan.com Copyright © 2021 Sloan. All rights reserved.
Note:-All vitreous china dimensions shown in
these drawings are nominal. Dimensions can
vary within the tolerances established in the
governing BIS standard. Please take this into
consideration when planning rough-in and
plumbing layouts.
Product illustrations shown are representative
only; actual products may vary.
Sloan reserves the right to make changes in
product characteristics, packaging or
availability at any time without notice.
CAUTION : Do not use white cement or high
lime-content cement to install this toilet.
The expansion of cement due to rise in
temperature may cause the toilet to crack or
damage. Sloan is not responsible for any
damage due to installation with the use of
cement.
Inds
LIMITED WARRANTY
Sloan Valve Company warrants its vitreous china products to be made of first class materials, free from defects of material or workmanship under normal
use and to perform the service for which they are intended in a thoroughly reliable and efficient manner when properly installed and serviced, for a period
of five years from date of purchase. During this period, Sloan Valve Company will, at its option, repair or replace any part or parts which prove to be thus
defective if returned to Sloan Valve Company, at customer’s cost, and this shall be the sole remedy available under this warranty. No claims will be
allowed for labor, transportation or other incidental costs. This warranty extends only to persons or organizations who purchase Sloan Valve Company’s
products directly from Sloan Valve Company for purpose of resale.
THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HERE OF. IN NO EVENT IS SLOAN VALVE COMPANY RESPONSIBLE FOR
ANY CONSEQUENTIAL DAMAGES OF ANY MEASURE WHATSOEVER. NOTE: IN NO EVENT SHALL THE SLOAN VALVE COMPANY BE LIABLE FOR INCIDENTAL
DAMAGES, RESULTING FROM IMPROPER INSTALLATION, OR FOR DAMAGES CAUSED BY NEGLECT, ABUSE OR ALTERATION.
INSTALLATION GUIDELINE
2. INSTALL NEW WALL HANGER BRACKET (INCLUDED)
13 3/8”
(340 mm) 19”
(483mm)
11 5/8”
(295 mm)
18 3/8”
(467 mm)
24”
(610 mm)
14 3/4”
(375 mm)
Rubber Gasket
16 3/4”
(425mm)
Concrete Wall must be properly reinforced to support urinal.
Determine position for new wall hanger bracket and mark
hole locations.
Drill holes in wall (use wall anchors if needed).
Mount and level wall hanger bracket using mounting screws
and washers (included).
Hand tighten
hex acorn nut into
one end of each
bolt before carefully
securing and
tightening them
Note: Check if
urinal is level. If not,
adjust bracket.
CAUTION!
Do not
overtighten the
bolts. Breakage
and chipping of
vitreous china
can occur.
4. COMPLETING THE INSTALLATION
Install flush valve(not included) to manufacturer’s installation
instructions.
Turn on water supply valve.
Flush urinal a few times and check all connections for water seepage.
Use Silicon on urinal perimeter where urinal meets the wall surface to
provide a suitable hygienic seal.
5. CARE AND CLEANING OF VITREOUS CHINA:-
Clean urinals with a cleaner safe for vitreous
china . Spray and wipe clean using soft cloth.
Soft abrasive cleaners may be used to remove
stains.
16.71” (424 mm)
Center to Center
Reinforced
wall framing/
urinal carrier
Holes
10 1/4”
(260 mm)
5”
(127 mm)
13 3/16”
(335 mm)
Rear water
supply inlet
4”
(102 mm)
CL
12 1/2”
(317 mm)
3. INSTALL NEW URINAL
Install urinal on wall hanger bracket and secure bottom
of urinal with bolts.
13 3/8”
(340 mm) 19”
(483 mm)
5/8”11
(295 mm)
18 3/8”
mm)(467
24”
(610 mm)
14 3/4”
(375 mm)
3/4” Spud
16 3/4”
(425 mm)
With extended connector use only Rubber
Gasket
For flexible connection use 3/4" brass
connector which exist with product.
-2-
SLOAN INDIA PRIVATE LIMTED
344, PHASE-II, UDYOG VIHAR, GURGAON 122015 Phone: (+91) 124-601333
Toll Free: 1800.123.3080 | [email protected] | sloan.com Copyright © 2021 Sloan. All rights reserved.
C
L
Outlet
C
L
Outlet
Rev-00 03-21
Code:08160021
Note: Product illustrations shown are representative only; actual products may vary.
  • Page 1 1
  • Page 2 2

Sloan SG-7019 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI