DuraCabinet DCWMTO Installation guide

Type
Installation guide
Version No.:V1.20140218
WALL-MOUNTED TOOL ORGANIZER
Thank you for selecting the Duracabinet 15-PC Wall-Mounted Tool Organizer for your
garage storage needs.
The Duracabinet 15-PC Wall-Mounted Tool Organizer was produced with rugged versatile design, high
quality materials and ne workmanship. With proper care and maintenance, it will serve you for many years
to come. This installation guide will help you to better understand this product, install it successfully in your
home and maintain it to keep it in good condition.
Please exercise proper safety and common-sense measures when installing this product.
2
WARNING
SAFETY INFORMATION
1. Please only use this product for its intended purpose (hanging and organization of tools and accessories).
2. Do not attempt to use this product to support a person or allow children to hang on the hooks. Severe injury
or death may result.
3. Only hang objects within the maximum allowed weight capacities of each hook or attachment.
4. Do not exceed the maximum weight capacity of each rail (240 lbs)
5. Follow all instructions carefully for installation.
6. Make sure the rails are secured with all screws into the wall/studs/anchors before use.
7. Check screws and anchors periodically and tighten if necessary.
IMPORTANT NOTE:
1.Before and during installation, please read and familiarize yourself with all installation instructions for this product.
2.Please keep all components, parts and accessories of this product away from small children and minors. During
installation, all screws, tools and small parts should be supervised so that they do not fall into the hands of
children.
3.Use caution at all times when installing this product. Please ensure that you are physically able to perform all
parts of the installation and that you have the correct tools and equipment needed.
4.Before beginning, remove all wrappers and packinging materials.
5.Please check to ensure that all components and parts are complete.
6.Some screws and bolts should not be tightened all the way until the entire component or section is aligned in its
proper position to allow for adjustments.
7.Clean all parts of the tool organizer kit before use.
This unit is intended for use with the maximum weight indicated. Use of this product
exceeding the maximum weight indicated may result in instability and cause injuries.
Distribute weight evenly for best results.
Solid steel rails each holds up to 240 lbs. (4 rails included per set)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
29595
29598
29599
29600
29601
29602
29603
29605
29606
29617
Twin Scoop Hook
Closed General Purpose Hook
Rake Hook(4-point)
Twin Tool Hook
Large Cradle Fork Hook
Deep Hook
Hanging Double Curved Pivot Hook
Peg Hook
Small Hook
Metal Wall Rail
Rail End Cap
Rail Connector
Screw
Screw Anchor
1PC
1PC
1PC
2PCS
1PC
1PC
1PC
2PCS
1PC
4PCS
4SETS
3PCS
32PCS
32PCS
Load Capacity
kg(Ibs)
20 (44)
20 (44)
20 (44 )
20 (44)
25 (55)
20 (44 )
25 (55 )
15 (33)
15 (33)
100 (220)
Description
Qty
Models
NO.
4
3
4
5
7
8
9
11
12
13
14
10
1
L
R
x1pc
2
x1pc
x1pc
x2pcs
6
x1pc
x1pc
x2pcs
x1pc
x4pcs
x4sets
x3pcs
x32pcs
x32pcs
x1pc
English
INSTALLATION
a
There is a total of 14 holes on each metal wall rail (Part 10)
.When hanging the rail, please use at least 8 holes which is
most suitable to desired position of anchors/screws.
Hole
dia=Ø8mm
Depth=45mm
10
x1Pc
Mark
b
Use the drill with correct indicated sized drill bit to drill each of the
4 holes as marked. Do not drill too deep a hole only enough depth to
fully enclose the anchor screws.
c
14
x8Pcs
d
13
x8Pcs
PH
+
14
10
After holes have been drilled, insert the provided Anchor Screws
(Part 14).
After anchor screws have been installed, affix the metal
wall rail (Part 10) to wall using supplied screws (Part 13)
1
Level/Nivel
10
Stud
13
5
Stud
English
INSTALLATION
12
a
2
12
10
b
Connect the Rail Connector (Part 12) to the Metal
Wall Rail (Part 10) board.
12
10
3
10
12
10
If metal wall rails are desired to be connected
together, please connect the second Metal Wall Rail
(Part 10) to the Rail Connector (Part 12) to
determine proper position.
c
Please use the same proceduremethod from
Step1 to Step 3 to install the other Metal Wall Rails
(Part 10)
d
10
10
10
10
10
10
12
6
English
INSTALLATION
4
1
2
5
R
11
10
6
7
11
11
R
L
10
10
WALL-MOUNTED TOOL ORGANIZER
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7

DuraCabinet DCWMTO Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI