City Theatrical 1140 Projector Hanger Installation guide

  • Hello! I've reviewed the Installation Guide for the City Theatrical Projector Hanger 1140. This guide details a 5-step process for safely installing a projector using this hanger, showing how to connect it to the pipe and secure it for use. I'm ready to assist you with any questions you have about the installation process or the product itself.
  • What size pipe is needed for installation?
    How many threads of engagement are needed when attaching the projector hanger parts?
    Is a tool needed to mount the projector hanger?
© 2019 City Theatrical. All Rights Reserved.
5 STEPS FOR A SAFE HANGING PROJECTOR INSTALLATION
1. Thread the Top Part of the Projector
Hanger 
steel Pipe using a pipe wrench
with a minimum of four threads of
engagement.
3. Insert the Tee Head into the Tee
Slot manually, such that the Tee Head
will settle into the Tee Slot.
5. Insert the Rubber Clip manually to
prevent the Knurled Tightening Knob
from loosening due to vibration.
4. Tighten the Knurled Tightening
Knob manually, and the projector will
be connected to the pipe.
Knurled Tightening Knob
Tee Slot
Pipe
2. Thread the Bottom Part of the
Projector Hanger onto the Female
Pipe Coupling that is mounted to
the Projector using a pipe wrench
with a minimum of four threads of
engagement.
Projector Hanger
P/N 1140
475 Barell Avenue, Carlstadt, NJ 07072 | Voice: 800-230-9497, 201-549-1160 | Fax: 201-549-1161 | [email protected]
Tee Head
Rubber Clip
/