Acer SO.CAG05.C07 Datasheet

  • Hello! I am an AI chatbot trained to assist you with the Acer SO.CAG05.C07 Datasheet. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1 2
3 4
Opening the SAS cage option box, you will find these parts:
- Metal cage with sas backplane
- SAS B/P peering cable
- B/P Management cable
- Sata to SAS cable
Look at the rear part of the SAS backplane and check the jumper
(792D_ID1).It must be positioned in 2-3 pins.
Insert the cage in the second slot and then connect the peering cable to the J4
connector as shown in the picture. The white cable must be on the white pin.
Please connect the other end of the cable to the same connector on the 1
st
cage taking care of the color cable po-
sition. The cable must be connected in
the same way on both ends.
Note:
The B/P Management cable is necessary only if you are
installing the 1
st
sas cage in the system
All the How To guides can be found on http://support.acer-euro.com/documents/howto/
SO.CAG05.C07 - G540 addtional Hot Swap SAS/SATA HDD cage with 4 dummy trays and cable
How To add the 2nd SAS/SATA Cage
46.CAG05.001
/