Yarway Illuminators for high pressure level gauges, Model: DuCoLeD O&SI Owner's manual

Type
Owner's manual

Yarway Illuminators for high pressure level gauges, Model: DuCoLeD O&SI

The DuCoLeD O&SI illuminator is designed for use with Yarway high pressure level gauges (LGs) to enhance visibility of the liquid level. The illuminator is powered by a 24 V DC power supply or AC/DC adapter and provides a longer life than traditional incandescent bulbs used in LGs, reducing maintenance costs. It is suitable for use in explosive atmospheres and has a wide ambient temperature range (-40°C to +70°C).

Yarway Illuminators for high pressure level gauges, Model: DuCoLeD O&SI

The DuCoLeD O&SI illuminator is designed for use with Yarway high pressure level gauges (LGs) to enhance visibility of the liquid level. The illuminator is powered by a 24 V DC power supply or AC/DC adapter and provides a longer life than traditional incandescent bulbs used in LGs, reducing maintenance costs. It is suitable for use in explosive atmospheres and has a wide ambient temperature range (-40°C to +70°C).

YARWAY PED - OPERATING AND SAFETY INSTRUCTIONS
LEVEL GAUGES
WARNING
For safety reasons, it is important to take the
following precautions before you start work
ontheLG*:
1. Read all labels fitted to the LG* and this sheet
before installation, operation ormaintenance.
2. Use LG* for the intended purpose (according
contract/specification).
3. Remove the LG* carefully from its packaging,
lifting by means of straps (heavy weight)
around the body or use the hoisting lug if
provided.
4. Do not use the boiler connections, flanges or
any of its accessories for lifting.
5. For installation of the LG* use gaskets and
bolting material in accordance with the
relevant piping code (ASME/ANSI B31.1 or EN)
and free of "forces, moments and torques".
6. Additional mounting/modifications on LG's*
are not allowed without approval from Yarway.
7. The LG* expansion loops are to relieve
stresses due to thermal expansion installation
and not for misalignment compensation.
8. Handling of all LG's*, illuminators and
accessories must be carried out by personnel
trained in all aspects of manual, mechanical
handling/lifting techniques and standard
safety procedures, in case of doubt, consult
your supervisor and/or safety officer.
9. Yarway do not accept liability for site work
performed under supervision of others.
10. Insulate the LG* in accordance with
plantrequirements.
11. Please, follow the procedure as detailed
intheIOM**.
12. Warning: before installation, retorqueing
thenuts as specified.
Before installation these instructions must be fully read and understood
!! Read all warning labels fitted to the LG*
beforeoperation or maintenance !!
Never open, dismantle or modify the assembly
whilst under pressure/temperature or other
hazardous conditions.
NOTE
LG* = Level gauge
IOM** = Installation, Operation and Maintenance
Manual
© 2017 Emerson. All Rights Reserved.Emerson.com/FinalControl VCOSI-03349-EN 18/09
INSTALLATION
1. LG's* must be properly installed to the
boiler connections by flanges or welding
ends.
2. To remove solids and/or sediments, please
follow blow-down procedure as described
inthe applicable IOM**.
3. Installation has to be in vertical (use support
in case of heavy weight).
4. The LG's* may be delivered with shut-off
valves and/or an orifice in combination
with a ball check valve. Check for
correct execution on the order drawing
(specification).
5. Connection of electrical supplies for the
illuminators should be in accordance with
the manufacturer's instruction manual.
6. Ensure easy access of the operating
mechanism (shut-off valves, drain valve,
hand wheels, illuminators, etc.) if applicable.
CATEGORY
LG's* are manufactured in accordance with
97/23 EC - Category I - gas/liquid Group2
for V= 0.95 ltr at
Ps=200bar and
97/23 EC - Category II - gas/liquid Group2
for V= 4.7 ltr at
Ps=200bar
Pressure/temperature limits are indicated:
# on the LG* nameplate
# design code: ASME B16.34 AD 2000 or EN
2
YARWAY PED - OPERATING AND SAFETY INSTRUCTIONS
LEVEL GAUGES
NOTE
LG* = Level gauge
IOM** = Installation, Operation and Maintenance
Manual
FINAL INSPECTION
Yarway LG's* have been tested, degreased,
dried and prepared according toservice
application.
This should be carried out in accordance with
the relevant Yarway's IOM** andavailable
upon request by Yarway via our website:
Emerson.com/FinalControl
STATE OF DELIVERY / STORAGE /
SELECTION/ SERVICE LIFE
State of delivery
Yarway’s LG's* are delivered with protection
and tested according applicable QIP (Quality
Inspection Plan). Particular care should
be exercised when removing the LG from
its packaging and your special attention is
required to check carefully that no damage has
occurred to flange faces, welding ends, valvery,
illuminators, etc. before installation. Check out
IOM**- instructions before proceeding.
Storage
For short term storage, up to 6 months, no
additional preservation is necessary. Retain
the LG* in its original packaging in a clean, dry
indoor location. For long term storage, use
only a dry indoor location. Follow instructions
given in the IOM** before placing the LG* into
service, inspect all other components to ensure
correct functioning.
SPARE PARTS
Use only genuine Yarway components. All LG's*
are identified by an ident number, stamped on
the identification plate. Use this number when
ordering spare parts.
Selection
Ensure that LG's* material of construction and
pressure/temperature limits shown on the
identification plate and according to the suitable
code for the process conditions. If in doubt,
contact Yarway or your localrepresentative.
Service life
Expected service life may vary upon condition of
service. Check unit at least once per 8000 hours
or longer intervals based upon site experience.
Replace glasses and mica's immediately after
they became opaque.
Neither Emerson, Emerson Automation Solutions, nor any of their affiliated entities assumes responsibility for the selection, use or maintenance of any product.
Responsibility for proper selection, use, and maintenance of any product remains solely with the purchaser and end user.
Yarway is a mark owned by one of the companies in the Emerson Automation Solutions business unit of Emerson Electric Co. Emerson Automation Solutions,
Emerson and the Emerson logo are trademarks and service marks of Emerson Electric Co. All other marks are the property of their respective owners.
The contents of this publication are presented for informational purposes only, and while every effort has been made to ensure their accuracy, they are not to be construed
as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by our terms and
conditions, which are available upon request. We reserve the right to modify or improve the designs or specifications of such products at any time without notice.
Emerson.com/FinalControl
  • Page 1 1
  • Page 2 2

Yarway Illuminators for high pressure level gauges, Model: DuCoLeD O&SI Owner's manual

Type
Owner's manual

Yarway Illuminators for high pressure level gauges, Model: DuCoLeD O&SI

The DuCoLeD O&SI illuminator is designed for use with Yarway high pressure level gauges (LGs) to enhance visibility of the liquid level. The illuminator is powered by a 24 V DC power supply or AC/DC adapter and provides a longer life than traditional incandescent bulbs used in LGs, reducing maintenance costs. It is suitable for use in explosive atmospheres and has a wide ambient temperature range (-40°C to +70°C).

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI