Guardian 10K Straight Loop Insert Operating instructions

Type
Operating instructions
STRAIGHT LOOP INSERT
INSTALLATION GUIDELINES
GF Protection, Inc. / 6305 South 231st Street, Kent, WA 98032 / 1.800.466.6385 / www.guardianfall.com
Section View:
*Note: Avoid kicking or knocking over installed Straight Loop Inserts while working. It is recommended that
inserts are fastened to rebar by wire tie or equivalent method for additional support.
9”
min from any edge
8” min
*Minimum of 3000-psi concrete
Insert bolt end of
anchorage assembly
from step 2 into Part
D. Ensure hex socket
on Part C mates
with bolt head of
Part E. Hand tighten
by rotating Part A
and applying
pressure towards
decking. Do not
over tighten to
prevent stripping
out decking.
Assemble mounting
hardware over the
threaded axis as
shown. All other
components should
sit ush with each
other and be held in
place by Part J.
1
Firmly hold housing
ush to surface
while fully
tightening
mounting hardware
with drill. Do not
over tighten to
prevent stripping
out decking.
3
5
Choose installation
location. Surface
should be at and
free of debris. Place
housing orange side
down and hold
rmly. Insert
mounting hardware
into housing and
push until secure.
2
(A)Straight Loop Insert
(B )O-Ring
(B )O-Ring
(C)Plastic
Bolt
(D)Housing
(E)Lag
Screw
(F)Spacer
(G)Metal
Washer
(H)Compression
Bushing
(I)Plastic
Washer
(J)Retaining
Washer
2
E
B
2
F
G
H
I
J
Assemble
anchorage assembly
as shown. Assembly
should be tightened
until Part B just
contacts Part A and
Part C but is not
compressed.
4
A
B
C
D
1
1
US Patent Pending
*Please refer to
Guardians 10K Swivel Manual for
instructions regarding fastening Swivel to
Straight Loop Insert.
  • Page 1 1

Guardian 10K Straight Loop Insert Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI